Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Factors Controlling Fracture Extension

    By C. R. Fast, G. C. Howard

    The loss of fluid to the formation adjacent a fracture governs the areal extent of the fracture and the success of hydraulic fracturing as a production stimulation technique. The three flow mechanisms

    Jan 1, 1961

  • CIM
    Review on Comprehensive Control Technology Development for Collapse Area of Metal Mine

    By Tao Long

    Recently, the great amount of funds has been invested in the reconstruction of damaged infrastructure and house of subsidence area of coal mine and mine reclamation. This is a benevolent and popular w

    Oct 1, 2010

  • CIM
    Modelling of Blast-Induced Stress Wave Propagation and Fracturing In Hard Rock Material

    By Ali Mortazavi

    In underground mining applications, successful blasting results in less damage, which may lower support costs, lower dilution and produce a uniform fragmentation. The explosive detonation process crea

    May 1, 2002

  • CIM
    Mineralization and Metallurgy of the Samatosum Project

    By P. J. Gron

    "The Samatosum Project is a base and precious metal deposit located in south central British Columbia. A dilute ore reserve of 766, 682 tonnes grading an average 1.1% copper, 3.0% zinc, 1.4% lead, 833

    Jan 1, 1990

  • CIM
    The Future of Mining Engineers

    By Hector Monette

    "AFTER SPENDING a lifetime in the mining industry it is normal that one should be concerned with the future of his profession, especially if he is directly responsible for the education and formation

    Jan 1, 1972

  • CIM
    Environment and the law

    By Matthew S. Bingham, David H. Searle

    "One of the most significant developments in environmental law has been the development of mandatory project review processes, at both the federal and provincial levels.FederalWhile, in the past, proj

    Jan 1, 1991

  • CIM
    Elemental Sulphur Recovery in Western Canada

    By M D. Winning

    The historical development of the elemental sulphur recovery industry in Western Canada is reviewed for the period 1952 to 1965. A brief technical description of a typical modified Claus sulphur recov

    Jan 1, 1965

  • CIM
    Recent Improvements in Magnesium Alloy Founding

    By J. W. Meier

    Introduction The great importance of air warfare during World War II and the introduction of large-scale air transportation and airborne operations created an immediate demand for large quantities

    Jan 1, 1948

  • CIM
    Studies on the Bioremediation of Chromium using a Bacterial Strain Isolated from a Chromite Mine

    By Yann Sivry, S. Subramanian, Divyasree C. Prabhakaran, Jean Riotte

    The potential of a bacterial strain isolated from water samples collected from a chromite mine in Odisha, India has been assessed for the bioremediation of hexavalent chromium, a toxic environmental p

    Jan 1, 2016

  • CIM
    The Resource Valuation and Optimesation Model: Real Options Impact for the Mining Industry

    By G. W. Evatt

    This paper presents the scientific framework underpinning the Resource Valuation and Optimisation Model (RVOM). The RVOM is a Real Options software package, which helps mine owners optimally plan thei

    Jan 1, 2011

  • CIM
    Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant

    By B. Krysa, J. Qiu

    The zinc pressure leach plant at HBM&S's operations is now in its fifteenth year of operation. Current pressure leach operation is steady at a concentrate processing rate of around 26.5 tonnes pe

    Jan 1, 2008

  • CIM
    Copper Electrowinning at Duisburger Kupferhuette

    By H. Kudelka

    Copper electrowinning at Duisburger Kupferhuette was introduced in March 1975. The electrowinning plant has a capacity of 10,000 mT of copper cathodes a year. The cuprous oxide feed material is an int

    Jan 1, 1977

  • CIM
    Phases and Phase Relations of the Platinum-Group Elements

    "3.1. IntroductionAmong the six platinum-group elements (POE), four have identical cubic symmetry, two identical hexagonal symmetry (Table 3.1). Despite crystallographic differences, there is a clear

    Jan 1, 1979

  • CIM
    Heat Balance Control Changes- Further Steps and Safety Issues

    By T. Kho, W. Zhang, M. E. Reed

    The control of flash furnace heat balances is critical. Suspension smelting control and stability comes from stable operation of the heat balance, and this leads to a stable reaction shaft exit temper

    Jan 1, 2019

  • CIM
    Innovations in the Field of Non-Ferrous Metal Processing

    By M. Schwarze

    SMS Meer GmbH with its COPPER PLANTS DIVISION produces a full line of systems and machines for the processing of copper. The product range includes: shaft melting furnaces, anode casting lines, horizo

    Jan 1, 2007

  • CIM
    Shaft extension design at the Underground Research Laboratory, Pinawa, Manitoba

    By J. R. Morris, A. E. Ball, G. W. Kuzyk

    "AECL Research has constructed an underground laboratory for the research and development required for the Canadian Nuclear Fuel Waste Management Program. The experimental program in the laboratory wi

    Jan 1, 1991

  • CIM
    Review of Practices at the Sullivan Mine

    By J. R. Giegerich

    "IntroductionMINING operators in common with other operators are confronted today with two serious problems, shortage of experienced workmen and rising costs. The following review of practices at the

    Jan 1, 1952

  • CIM
    The Start-up and Operation of the Gibraltar Mines SX-EW Plant (e864bb9e-42ee-4b0f-8109-3374578f0d92)

    By J. C. O'Rourke

    "Gibraltar Mines Ltd. has been operating its open pit copper mine for fifteen years. In that time over 140 million tons of waste and low grade material has been placed on the mine waste dumps. Laborat

    Jan 1, 1988

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009

  • CIM
    Frother and Collector Effects on Flotation Cell Hydrodynamics and Their Implication on Circuit Performance (c615fbc8-d724-48ab-a36a-7fd85aca4c5e)

    By J. E. Nesset

    "Significant progress has been made over the past few years on characterizing and understanding the hydrodynamic properties of frothers and collectors and their effect on flotation performance. This n

    Jan 1, 2010