Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Aerial Exploration

    By W. G. Jewitt

    Introduction The use of the aeroplane in prospecting is already familiar to everyone connected with the mining industry. Apart from transportation companies, three organizations, the N. A. M. E., the

    Jan 1, 1931

  • CIM
    Altered Mining Extraction Sequence and Rock Mass Response in Vale 402 OB at Creighton Mine

    By C. Denis Thibodeau

    Outline Introduction 402 OB Mining Sequence Trial to Verify Sequence Change Monitoring Observations Numerical Modelling Conclusion

    May 1, 2013

  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017

  • CIM
    A Mixed Integer Linear Programming - Based Short-Term Planning Tool

    By Zhanyou Huang

    The logic and capabilities of a short-term planning tool are presented. It was developed using mixed integer linear programming (MILP) techniques to solve the open-pit and underground mine planning pr

    Oct 1, 2009

  • CIM
    Environmental management in a global economy (CIM Bulletin)

    By S. Vézina

    "Environmental issues have evolved considerably over the last two decades. The main contributing factors, to name a few, have been the changing values of modern societies, the globalization of trade a

    Jan 1, 2006

  • CIM
    Design of the Pierina waste dump

    By R. Sharon, P. M. Hawley, X. Ochoa

    "Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa

    Jan 1, 2003

  • CIM
    One Network Mining Wireless Network Standardization

    By Gary S. Anderson

    Rajant Corporation is the global leader in mining communications systems implemented a vision to develop a wireless network that is rapidly deployed, self-powered and managed, for portable or fixed co

    May 1, 2010

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing

    By M. Redfearn

    "DUST COLLECTION EQUIPMENT LIST Primary Dust CollectorModular Mikro-Pulsaire - Model 2G1-96TR Capacity: 20,000 c.f.m.Bags: Total of 288; 8' x 4 1/2"" diameterMaterial: Dacron HCE feltAir to cloth rati

    Jan 1, 1976

  • CIM
    Application of Skarn Deposit Zonation Models to Mineral Exploration

    By Lawrence D. Meinert

    Most large skarn deposits are zoned in both space and time relative to associated intrusions. Zonation occurs on scales from kilometers to micrometers, and re?ects in?ltrative ?uid ?ow, wall rock reac

    Jan 1, 1997

  • CIM
    Bond is Back!

    By Mark Sherman

    "One of the main functions of a process technology and engineering services provider is to select grinding equipment that will meet the client’s throughput rate target. Prudent risk mitigation strateg

    Jan 1, 2012

  • CIM
    A Physical Volcanological, Chemostratigraphic, and Petrogenetic Analysis of the Little Falls Member, Tetagouche Group, Bathurst Mining Camp, New Brunswick

    By S. R. McCutcheon, D. R. Lentz, W. S. Downey

    "Abstract - The Little Falls member of the Nepisiguit Falls Formation is situated in the northern part of the Brunswick Belt of the Bathurst Mining Camp and has been interpreted as the distal equivale

    Jan 1, 2006

  • CIM
    Alkali-Alumina and MgO-Alumina Molar Ratios of Altered and Unaltered Rhyolites

    By R. E. Whitehead

    "Abstract - Alkali-alumina and MgO-alumina plots are an effective instrument for displaying chemical and mineralogical compositions of altered and unaltered rhyolites and rhyodacites. They reveal that

    Jan 1, 2006

  • CIM
    Chemostratigraphy at the Brunswick No. 6 Volcanic-Sediment-Hosted Massive Sulfide Deposit, New Brunswick: Resolving Geometry from Drill Core in Deformed Felsic Volcanic Rocks

    By G. Roy, D. R. Lentz, A. O. Wills

    "Abstract - Diamond-drill hole DDH-B357, located 1.5 km north of the Brunswick No. 6 Zn-Pb- Cu-Ag volcanic-sediment-hosted massive sulfide (VSHMS) deposit, intersects three exhalative horizons within

    Jan 1, 2006

  • CIM
    Chemostratigraphy of Volcanic Rocks Hosting Massive Sulfide Clasts Within the Meductic Group, West-Central New Brunswick

    By L. R. Fyffe, D. R. Lentz, S. H. Mcclenaghan

    "Abstract - The Eel River area in the southwestern Miramichi terrane of New Brunswick contains a complete calc-alkaline suite of volcanic rocks that are interlayered with intervals of sedimentary and

    Jan 1, 2006

  • CIM
    A New Baffles System in SAG Mill Trommel at the Shahrebabak Copper Complex

    By M. Hekmati, M. R. Garmsiri, S. M. Hosseini

    "SAG/AG mills have been most common choice in grinding circuits last decades. In the most cases, at the discharge of SAG/AG mills, a trommel screen is used that is equipped with baffles to provide app

    Jan 1, 2012

  • CIM
    An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit Mining

    By Shahram Tafazoli

    This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parameters. The

    Oct 1, 2009

  • CIM
    Effect of Core Diameter on the Bond Impact Crushing Work Index Test (Phillips Enterprises LLC, DJB Consultants, Inc, Alex G. Doll Consulting Ltd )

    By R. Phillips, A. G. Doll, D. J. Barratt

    "The Bond low energy impact (crushing) work index test is specified to be performed on rock specimens between 50 mm and 75 mm in effective diameter. NQ-diameter drill core, frequently used in mineral

    Jan 1, 2012

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    Economic Evaluation of Activated Carbon for Gold Milling Circuits ( CIM Journal | Vol. 10, No. 2, 2019)

    By M. Drozd, M. Somppi, Z. F. Yamak

    "Activated carbon is used to recover gold in solution from various gold circuit designs including carbon-in-pulp (CIP), carbon-in-column (CIC), and carbon-in-leach (CIL) processes; however, the charac

    Jan 1, 2019

  • CIM
    An Expert System Supervisor of a Flotation Circuit

    By A. L. Mular, R. P. Edwards

    "The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits

    Jan 1, 1991