Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Start-Up and Operation of the Aga Mineração Refractory Gold Pressure Oxidation Plant

    By J. Dennett, M. Faris, M. Antonio, M. Collins, N. Tuffrey, R. Ellenwood, V. Reddy

    "In January 2012, AngloGold Ashanti Córrego do Sítio Mineração, with assistance from Sherritt International Corporation, commissioned a new autoclave for pressure oxidation of refractory gold concentr

    Jan 1, 2017

  • CIM
    The Ordovician Tetagouche Group, Bathurst Camp, Northern New Brunswick, Canada: History, Tectonic Setting, and Distribution of Massive-Sulfide Deposits (d4efba76-9c4a-42ee-a259-1a431117590b)

    By Steve R. McCutcheon, Cees R. Van Staal, John P. Langton, Leslie R. Fyffe

    The volcanic-dominated Tetagouche Group in northern New Brunswick contains numerous massive-sulfide deposits and intimately associated metalliferous sediments. The massive sulfides are generally hoste

    Jan 1, 1992

  • CIM
    UNIMAX SD100 Depressant - A Cyanide Replacement

    By T. Schmidt, J. Merza

    "This study considers two lead/zinc/silver orebodies which have historically had a problem with pyrite, pyrrhotite and sphalerite contamination in the lead circuit. The problem was previously addresse

    Jan 1, 1992

  • CIM
    Mathematical Modeling Of Pressure Leaching of Sulphide Zinc Concentrate

    By Y. M. Shneerson, V. M/ Shpaer, E. E. Zhmarin, A. Y. Lapin, E. M. Vigdorchik

    This paper describes studies of zinc concentrate oxidizing pressure leaching using the method of mathematical modeling. The concept of a kinetic function was taken as a basis for mathematical modeling

    Jan 1, 2004

  • CIM
    How Sherritt Gordon Receives and Handles Phosphate Rock

    By W. R. Middagh, R. M. Garvey

    "Phosphate rock is shipped by boat from Florida to Vancouver, B.C., where it is unloaded and stored in a 50,000-ton silo. It is shipped from Vancouver in 100-ton hopper cars in 80-car trains to Fort S

    Jan 1, 1968

  • CIM
    Western Canadian Plains - A New Challenge to Geophysics

    By A. F. Beck

    Abstract Canada has opened up a geological province in ?Western Canada which offers a new .stimulus to oil exploration geophysics. The problems of instrumental technique, interpretation, and log

    Jan 1, 1950

  • CIM
    Relationship between Porosity and Surface Deposit Coverage for Wire and Arc Additive Manufactured Aluminium Alloy 2319

    By K. E. Harley, M. J. Whiting, T. J. Sabin, E. M. Ryan, J. F. Watts

    "Wire and Arc Additive Manufacturing (WAAM) has the potential to enable a very significant reduction in buy-to-fly ratio compared to conventional manufacturing through the ability to build near-net sh

    Jan 1, 2018

  • CIM
    Electrochemical Studies of the Performance of Different Mesh Anodes during and after Zinc Electrowinning

    By E. Ghali, W. Zhang, M. Robichaud, G. Houlachi

    "The performances of six mesh and one plate dimensionally stable anodes have been investigated in the zinc electrolyte at 38oC and compared to conventional silver-lead alloy anodes. The electrochemica

    Jan 1, 2016

  • CIM
    Non-Oxidative Nickel Leach Capacity Review through Isothermal Modelling Of Mineralogical and Chemical Concentration Profiles

    By E. Engelbrecht

    "A pressure non-oxidative leach is employed at Anglo American Platinum Base Metal Refiners to extract nickel from a slow cooled matte. The design base requires two 80 m3 autoclaves in parallel to achi

    Jan 1, 2017

  • CIM
    Road to Resources A Two-Way Street

    By Arthur Laing

    "IT is indeed a pleasure to have the opportunity of addressing this group today. Not only does it give me the opportunity of meeting with representatives of what is considered by many to be the most d

    Jan 1, 1966

  • CIM
    Use of fly ash in backfill at Kidd Creek Mines

    By T. R. Yu, D. B. Counter

    "In an effort to increase productivity, the use of fly ash as a binder for consolidated backfill was studied. From laboratory and underground tests f or its cementitious properties and environmental e

    Jan 1, 1988

  • CIM
    Measurement of inert graphite anode wear using confocal surface profilometry

    By J. B. Rubenstein

    This work demonstrates the feasibility of using confocal surface profilometry to measure and characterize wear of graphite anode surfaces. This method was tested using anode samples that were electrol

    Jan 1, 2004

  • CIM
    Rainfall-Induced and Structurally-Controlled Slope Failure and Rockfall Incidents along part of Werka Descent Road and Remedial Measures, North West of Saudi Arabia

    By B. H. Sadagah

    "Construction of mountain roads at north westerly Saudi Arabia is a difficult task in rugged terrains, where the rock masses are steep slopes, and full of geomorphological constraints.Werka descent li

    Jan 1, 2015

  • CIM
    Stratigraphic control of Cu-Fe skarn ore distribution and genesis at Craigmont, British Columbia

    By Gregg W. Morrison

    "The Craigmont copper-iron skarn deposit is adjacent to the southern margin of the late Triassic Guichon Creek batholith in south-central British Columbia. Host to the ore are sedimentary and volcanic

    Jan 1, 1980

  • CIM
    A Novel Heat Treatment Practice for Al-3%Cu-1%Mg DC Cast Ingot Plates

    By X. -G. Chen, E. M. Elgallad

    Direct chill (DC) cast ingot plates of 2xxx alloys have been increasingly used for large mold applications in the plastics and automotive industries. A novel heat treatment practice for Al-3%Cu-1%Mg D

    Jan 1, 2015

  • CIM
    Thermodynamic and Microstructure Investigations of Al-Mg-Si Extrusion Alloys: Criteria for Phase Selection and Formability

    By A. R. Farkoosh, K. Korgiopoulos, McGill University, O. Rodop, L. A. Villegas Armenta

    "New generation of Al-Mg-Si alloys with thermally stable dispersoids that prevent recrystallization and grain growth during hot deformation are currently used in automotive components requiring good f

    Jan 1, 2016

  • CIM
    Probabilistic Analysis for Mine Design, Using Coal Pillar Design to Illustrate its Potential Usefulness

    By T. R. Kostecki, J. Hirschi

    "Analytical engineering design is based upon a trial-and-error iterative and deterministic process. Within this process, the engineer obtains some estimated values, plugs them into de facto closed-for

    Jan 1, 2015

  • CIM
    Etude du drainage superficiel et souterrain de la -mine à ciel ouvert des Mines Gaspé, Murdochville, Québec

    By A. Liard, H. Sommelet, G. Sauriol

    "Description des études qui ant conduit à la conception spécifique du système de drainage de la mine à ciel ouvert. Les approches différentes sont examinées ainsi que la valeur du système recommande.I

    Jan 1, 1981

  • CIM
    Roasting Practices at International Nickel

    By Roorda H. J, R. R. Saddington, Curlook W

    THE copper-nickel sulfide ore deposits of the International Nickel Company of Canada, Limited contain the minerals pyrrhotite, pentlandite, and chalcopyrite. In the extraction of the nickel, copper, a

    Jan 1, 1961

  • CIM
    La Faisabilité Du Concept De La Recirculation De L?eau De Procédé Pour Résoudre Les Problèmes De Toxicité D?effluent Au Complexe Minier Raglan

    By Blandine Arseneault

    The Raglan Mill had been in production for less than a year when the initial toxicity tests on the effluent revealed that it was defined as ?toxic? under regulations. Testwork was begun to address the

    Nov 1, 2002