Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Equity Pricing in the Mining Sector: CAPM and APT Evidence

    By J. L. Casado-Sánchez

    Financial capital is highly volatile and if the investor does not get adequate compensation for the risk faced he may consider withdrawing his capital assets from the company and consequently produce

    Aug 1, 2013

  • CIM
    Evaluation of Kirka Boron Plants Tailings

    By A. A. Sirkeci, M. Tarkan, N. Acarkan, O. Kangal, G. Bulut

    This investigation deals with the evaluation of the tailings of the Kirka Borax Plants. In this respect boron in the tailings was recovered and the utilization of the clayish fraction was investigated

    Jan 1, 2004

  • CIM
    First Nations Expectations from the Mining Industry: Lessons from the Tsilhqot?in People

    By T. I. Kunkel

    The economic prosperity of many Canadian communities depends on resource extraction within the traditional territories of Indigenous people. The geographic sites where these resources are situated are

    Aug 1, 2013

  • CIM
    New Development of Zinc Hydrometallurgy in China

    By W. Haibei, Lei. Z., Z. Bangsheng, W. Yufang, J. Kaixi

    In 2007 output of zinc was more than 3.71 million tons in China. Some new projects have finished FS and several new zinc plants are building now. In recent ten years it happened great changes in zinc

    Jan 1, 2008

  • CIM
    Automatic Anode Setting at Albras

    By L. S. Almeida, U. A. Courbassier, C. T. Guimãaraes, M. N. Souza, V. L. Silva, H. P. Dias, G. A. Bicalho, B. S. Rocha, P. N. Rodrigues, A. Carnevale

    During primary aluminum production the anode changing is a very important task. So improvements on it will be essential to avoid disturbance and have a better operational control. After anode changing

    Jan 1, 2006

  • CIM
    Evolution of a Lakebed Resulting from Subaqueous Tailings Discharge: Coupling Multibeam Surveys and Airborne Lidar

    By J. Locat, G. Parker, D. Turmel

    ABSTRACT Since 1964, the Iron Ore Company of Canada has deposited iron ore tailings into Wabush Lake in western Labrador, Canada. From 1999 to 2008, the authors completed multibeam bathymetric and sam

    Jan 1, 2014

  • CIM
    On the Wear of Cutting Tools at High Speed Machining

    By Z. Farhat

    In spite of advances in cutting tool technology, the understanding of the basic wear behavior and failure mechanisms needs further study. Tool wear is the main factor contributing to geometrical error

    Jan 1, 2006

  • CIM
    Development of BIM Based Rehabilitation and Maintenance Process for Roads

    By R. Heikkilä

    The utilization of Building Information Modeling (BIM) and model based 3-D control of work machines have increased a lot in new road construction in Finland as well as in other Nordic Countries. Up to

    Aug 1, 2013

  • CIM
    Study on Feasibility of Columnar Jointed Basalt as a High-Arch Dam Foundation

    By Wei Yun-Jie

    Columnar jointed basalt is a fractured rock, with a lot of small spacing structural planes and poor integrity of the rock mass. On the basis of the comprehensive study of the columnar shape of Columna

    May 1, 2009

  • CIM
    Development of Barrick Gold’s Bulyanhulu Mine

    By John Frostiak

    "Kahama Mining Corporation Limited, a wholly owned subsidiary of Barrick Gold Corporation, poured the first dore bar and filtered the first concentrate produced at the Bulyanhulu mine on February 28,

    Jan 1, 2003

  • CIM
    Metallurgical Characterization of the Collective and Selective Flotation Plants at Minera Los Pelambres

    By F. Henríquez, V. Iriarte, L. Vinnett, J. Yianatos, F. Díaz

    Metallurgical characterizations of the collective (Cu/Mo) and selective flotation plants were carried out in Minera Los Pelambres, Chile. The selective plant allows the valuable minerals of Cu and Mo

    Jan 1, 2015

  • CIM
    Kinross Paracatu, Start-Up and Optimization of Sag Circuit

    By Junior Santos

    Kinross Paracatu started the operation of the new gold processing plant in the end of 2008, being composed by one SAG mill and two ball mills. During the first year of operation the plant had several

    Jan 1, 2012

  • CIM
    Thermal Behaviour of Medium Temperature Sulphide Concentrate Leach Residues

    By Edouard Asselin, Tasawar Javed

    This study was conducted as a part of ongoing work to characterize sulphide concentrate leach residues generated under CESL (Cominco Engineering Services Limited) and Vale pilot and demonstration plan

    Jan 1, 2014

  • CIM
    Decarbonisation of the Outotec® Ausmelt Process

    By Jacob Wood, Robert Matusewicz

    The Outotec® Ausmelt Top Submerged Lance (TSL) Process has achieved widespread commercial acceptance over the past 40 years for the processing of copper, nickel, lead, tin, zinc and precious metal bea

    Jan 1, 2019

  • CIM
    Light Stable Isotope Evidence for a Metamorphogenic Origin for Bedding-Parallel, Gold-bearing Veins in Cambrian Flysch, Meguma Group, Nova Scotia

    By Alan L. Sangster

    Auriferous, bedding-parallel veins occur in zones of carbonaceous, argillaceous and sulfidic turbidites in the Lower to Middle Cambrian sandy flysch of the Goldenville Formation. The 0348 values for v

    Jan 1, 1992

  • CIM
    Roof Bolting (3babbf54-666a-462b-badb-962e55d68b9e)

    By L. M. Dwarkin

    Introduction Avital factor in the success of any coal mining operation is the method of roof support employed. A coal seam in? place has been described as the filling in a geological sandwich and the

    Jan 1, 1951

  • CIM
    Mining at Noranda (e1b3c124-61ae-49cc-bc5d-6d10b93c8463)

    By Hal. Oliver

    MR.]. G. TRAILL: My only excuse for contributing to the discussion on Mr. Hall's interesting paper is that I had the good fortune to be employed at Noranda during those romantic years, 1927 and 1

    Jan 1, 1937

  • CIM
    Monitoring Rock Slope Stability from Spaceborne Synthetic Aperture Radar (SAR) Platforms Using Interferometric (InSAR) Image Stack Analysis

    By Bruce Macdonald

    Operational monitoring of slope stability can be achieved by space based InSAR monitoring platforms. Natural and man-made rock slopes are monitored using a novel stack-based InSAR method that exploits

    Jun 1, 2012

  • CIM
    Environmental considerations in tailing disposal

    By G. W. Poling

    This paper evaluates current environmental protection legislation, guidelines and criteria, focusing mainly on the land and water disposal of mill tailings. Effluent criteria and regulatory mechanisms

    Jan 1, 1979

  • CIM
    New Construction at Tadanac, British Columbia

    By Unknown

    We are indebted to the Consolidated Mining and Smelting Company of Canada Limited for the several pictures in this issue showing the progress made in new construction at Tadanac and at Bonnington Fall

    Jan 1, 1925