Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Un système de refroidissement localisé sous-terre pour nos opérations à la mine Laronde

    By Nathalie Gauthier

    Bien que le système de ventilation du Puits Penna soit de taille imposante et que plus de $30M y seront engloutis pour son développement, aucun budget spécifique n?avait été préalablement consenti pou

    May 1, 2003

  • CIM
    Uncertainty in the Rock Engineering Design of Post-Tensioned Anchors for Dams

    By B. Panton, J. Carvalho, E. T. Brown

    High-capacity, post-tensioned anchors have found wide-spread use in initial dam design and construction, and in the strengthening and rehabilitation of concrete dams to meet modern design and safety s

    Jan 1, 2015

  • CIM
    Uncertainty surrounds deduction of environmental costs

    By Robert B. Parsons

    "Income tax legislation is not keeping pace with federal and provincial environmental legislation. There is a vast array of new environmental regulations at various stages of implementation across the

    Jan 1, 1991

  • CIM
    Unconformity-Associated Uranium Deposits

    By Dave Thomas

    ?Uranium is a common trace metal at the earth?s surface, but these are amazing super-high grade (up to 25%) pods, veins and disseminated uraninite (UO2) near unconformities between Proterozoic silicic

    May 1, 2006

  • CIM
    Unconformity-related uranium deposits, Athabasca area, Saskatchewan, and East Alligator Rivers area, Northern Territory, Australia

    By L. A. Clark, G. H. R. Burrill

    "Most unconformity-type uranium deposits in Saskatchewan occur within a few tens of metres above and/or below the basal unconformity of the 1,45-b.y. Athabasca Sandstone. Graphitic basement rocks coin

    Jan 1, 1981

  • CIM
    Undercut-and-Fill Mine of the at the Frood-Stobie Mining International Nickel Company of Canada, Limited

    By J. A. Pigott, R J. Hall

    The International Nickel Company of Canada, Limited operates five underground mines on the rim of the Sudbury Basin in the northern part of the Province of Ontario. Four of the mines, the Frood-Stobie

    Jan 1, 1961

  • CIM
    Undercutting at the King Mine of Asbestos Corporation, Limited

    By C. G. Harris, R. Sluyter

    The purpose of an undercut is to undermine a block of ore which will then proceed to cave into draw holes just below the undercut. Undercut-ting is the final and most vital phase in the development of

    Jan 1, 1960

  • CIM
    Undergronnd ore handling and hoisting system at the Williams Mine

    By Henry Smith, Stu Brown

    "The Williams Mine is Canada's largest gold producer, with annual production of some 500 000 ounces of gold from two million tonnes of ore. Highly mechanized and automated underground mining prac

    Jan 1, 1991

  • CIM
    Underground and Laboratory Tests of Slusher Cables

    By G Anders

    Underground tests of slusher cables at first might seem to be quite simple and inexpensive. They do, however, take a long time and give results that may be ambiguous and unreliable. Also, because unde

    Jan 1, 1964

  • CIM
    Underground Belt Conveyor System at the Sullivan Mine

    By F. M. Waldie

    THE 2,538-foot belt conveyor recently installed underground at the Sullivan mine hoists ore from the 3,350-foot level to the 3,900-foot or main haulage level, a vertical distance of 680 feet. The des

    Jan 1, 1945

  • CIM
    Underground Booster Fan Placement Strategies

    By Euler De Souza, Kyle Penner

    "Booster fans play an important role in assisting main fans by boosting the air pressure of the ventilation air passing through it. The correct placement of underground booster fans in a mine is a cri

    Jan 1, 2019

  • CIM
    Underground Cable Fault Location Under Methane and Coal Dust Explosion Hazard Conditions

    By A. Kozlowski

    We present research on cable fault location methods for mines where coal dust and methane explosions are a frequent potential hazard. The methodology and devices for low- and medium voltage cables fau

    Aug 1, 2013

  • CIM
    Underground Centrifugation: Technology for a Hostile Environment

    By Todd Smith

    AGENDA Newalta overview Dewatering underground slimes: current technique & challenges Why centrifugation? Process improvements & advantages How centrifuge technology works Implementation: fi

    May 1, 2013

  • CIM
    Underground Coal Gasification ? Technical Experiments and Results

    By Karol Kostúr

    This paper briefly describes the current state of underground coal gasification (UCG) processes globally and in the Slovak Republic. Recent results of laboratory and technical tests are presented. In

    Aug 1, 2013

  • CIM
    Underground Concreting at the Copper Mountain Mine

    By J. A. C. Ross

    Introduction To enlighten those who may be wondering where anyone could find sufficient data to write a paper on underground concrete work, the author would like to explain that, at Copper Mountain

    Jan 1, 1950

  • CIM
    Underground continuous mining — An overview

    By David Forrester

    "At the 95th CIM Annual General Meeting in Calgary, 1993, a paper entitled “Progress on Futuristic Mining Technologies” was presented(Matthews and Sarin), in which they outlined the goal of continuous

    Jan 1, 1996

  • CIM
    Underground Corrosion Tests on Aluminum Alloys at Wright-Hargreaves Mine

    By Hugh P. Godard, K. Winslow

    "AbstractA number of panels of various aluminum alloys in different combinations and secured by steel and three types of aluminum rivets were exposed underground at two locations in a Northern Ontario

    Jan 1, 1950

  • CIM
    Underground crusher and conveyor system at Ruttan Mine, Sherritt Gordon Mines Ltd.

    By S. K. Paul

    "This paper briefly describes the underground crushing and conveying system at Sherritt Gordon Mines' Ruttan Mine. A series of three steel-cord belted conveyors, with a total length of 2J55 metre

    Jan 1, 1980

  • CIM
    Underground Crusher Dust Control at Lake Shore Mine

    By O. E. Andrew

    THE object of this paper is to present a brief summary of the dust control system in use on the 3,825-foot level at the jaw crusher station, Lake Shore mine. During the years 1936 and 1937, dust surv

    Jan 1, 1941

  • CIM
    Underground Development Work in the Arctic

    Operating and Social Considerations from a Contractor?s Perspective

    May 1, 2013