Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Three Dimensional Simulation of Hydraulic Fracturing on Fault Using Lattice Element Method

    By X. Xu, J. K. -W. Wong, J. -Y. Delenne, K. Soga

    Hydraulic fracturing (HF) is a mulit-scale and multi-physics process which makes numerical modelling challenging. Conventional numerical models focus on multi-physics nature of HF but the multiscale n

    Jan 1, 2015

  • CIM
    Three Dimensional Transient Analytical Modeling of Friction Stir Welding (FSW) Including Actual Affected Parameters

    By S. Rash Ahmadi

    Welding is highly reliable and efficient metal joining process. In welding the metal adjacent to the weld joint is subjected to severe thermal conditions. As a result, complex changes in metallurgical

    Oct 1, 2011

  • CIM
    Three Mining Methods for Vertical, Inclined and Thick Coal Seams Used in France

    By G. Ellie, D. F. Coates

    "The mining of coal in thick and inclined seams is difficult, and there are only a few countries in the world that are really interested in the problems associated with their exploitation. In France a

    Jan 1, 1972

  • CIM
    Three Perspectives on Energy Management in Industry

    By Edward R. Lauer

    Energy conservation is an integral part of Canada's energy strategy. We must pursue conservation and energy management vigorously if we are to remain competitive in domestic and world markets, an

    Jan 1, 1977

  • CIM
    Three Stage of Crushing an Alternative to Sag Circuits

    By Christian Ottergren

    "Modern crushers offer double the capacity and performance of classic models. In some cases crushers are replacing SAG circuits, the advantages being smaller investment and lower operating costs. Is T

    Jan 1, 2004

  • CIM
    Three-dimensional finite element analysis of an undermined shaft at the Hustas mine, Turkey

    By C. O. Aksoy

    "Pillars left to ensure the stability of major underground coal mine infrastructure (shafts, drifts) often contain substantial quantities of coal. Recovery of this coal is an efficient use of the reso

    Jan 1, 2005

  • CIM
    Three-dimensional fracture mapping in granite excavations using ground-penetrating radar

    By A. L. Holloway, N. M. Soonawala, L. S. Collett

    "Since the late 1970s, a major R&D program has been under way in Canada to assess the concept of disposing of nuclear fuel wastes in deep plutonic rock. Atomic Energy of Canada Ltd . (AECL), a federal

    Jan 1, 1986

  • CIM
    Three-Dimensional Geological and Geomechanical Modelling of a Repository for Waste Disposal in Deep Rock Salt Formations

    By S. Heusermann, S. Fahland, J. Behlau, A. Schäfers, J. Hammer

    In the course of the deep subsurface use, the Federal Institute for Geosciences and Natural Resources has been carrying out extensive geological and geomechanical research and practical project work o

    Jan 1, 2015

  • CIM
    Three-Dimensional Modeling of a Heater Test to Investigate Crushed Salt Reconsolidation and Rock Salt Creep for the Underground Disposal of High-Level Nuclear Waste

    By J. T. Birkholzer, M. Rutenberg, K. -H. Lux, R. Wolters, J. Rutqvist, L. Blanco Martin

    In this paper, we present numerical results corresponding to the Thermal Simulation for Drift Emplacement (TSDE) test, conducted in the Asse salt mine (Germany) between 1990 and 1999 to simulate refer

    Jan 1, 2015

  • CIM
    Three-Dimensional Numerical Rock Damage Analyses Under Blasting Load

    By Ö Yilmaz

    In this study, the behaviour of rock mass subjected to blasting load is investigated using three dimensional finite difference numerical modelling. In the analyses, Mohr-Coulomb failure criterion has

    Aug 1, 2013

  • CIM
    Three-Product Flotation at Britannia

    By H. A. Pearse

    Introduction This paper may be regarded as another instalment of the story of the Britannia milling operation. From time to time in the past, articles (1) have been prepared by various members of the

    Jan 1, 1934

  • CIM
    Throughput and Recovery Improvements Following Commissioning of the Mount Milligan Mine

    By P. Miranda, K. Le, G. Maes, R. Peters

    "The Mount Milligan Mine, owned by Thompson Creek Metals Company Inc. (TCM), started operations in September of 2013. It is located between the communities of Fort St. James and Mackenzie and is the f

    Jan 1, 2015

  • CIM
    Throwing the Switch - The Planning, Process and Challenges of a Ventilation System Changeover

    By Arsalan Talebzadeh

    Construction -Surface ?First two intake fans constructed in 2007; third fan added in 2008 to reduce resistance in the system. 450 HP fans. ?Excavation for exhaust fans started in 2008. ?In parallel

    Oct 1, 2010

  • CIM
    Thunder Bay Terminals Ltd. - Terminal Plant Design

    By J. Carr

    This paper discusses: (1) the need for Western Canadian coal in eastern Ontario Hydro plants; (2) design parameters-unit trains, year- 'round receiving from trains, and shipping (Great Lakes seas

    Jan 1, 1979

  • CIM
    Thunder Bay Terminals Ltd. Site Selection to Operation - The Management Function

    By P. R. Cook

    Thunder Bay Terminals' plant, now in operation, cost about 70 million dollars and was completed on time and under budget. The paper is the project manager's account of this accomplishment. F

    Jan 1, 1979

  • CIM
    Tidal Power

    By G. C. Baker

    Despite the attention belatedly bestowed on tidal power in recent years, it remains largely a potential rather than an actual source of energy. The resource is, practically speaking, non-depletable. E

    Jan 1, 1972

  • CIM
    TIG Welding of Single Crystal CMSX-4 Alloy

    By J. Dupre, A. Gontcharov, H. Pepin

    Produced by the conventional TIG welding CMSX-4 welds had been studied. It was demostrated that microstructure of welds depended on filler materials, welding parameters and joint design. Epitaxial sol

    Jan 1, 2006

  • CIM
    Tile catenary idler as a means of energy absorption and spillage prevention

    By Douglas G. Jay

    "Transfer points on belt conveyors have long been a source of problems for both designers and users. Conveyors are generally given a low priority in new equipment layout, thus designers are often forc

    Jan 1, 1982

  • CIM
    Tile MAGNADET electric initiation system

    By W. B. Morrey

    "In recent years, the major effort in detonator development has been concentrated on ""non-electric"" systems. Existing types all involve some form of explosive reaction to transfer ignition energy fr

    Jan 1, 1982

  • CIM
    Tile use of stage curves in the design and operation of tailings impoundments

    By Jack A. Caldwell

    "This paper describes the nature of stage curves and the ways in which they have been used to study the construction sequencing of tailings impoundments. They provide a simple graphical method of repr

    Jan 1, 1983