Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    The quality of Canadian coal - a petrographic approach to its characterization and classification

    By David E. Pearson

    "There are many tests that can be used to characterize and classify coals, and describe their quality. One of the easier tests, and most versatile in its application, is petrography. Rank and coal typ

    Jan 1, 1985

  • CIM
    The quality of Western Canadian coking coal

    By David E. Pearson

    "Western Canadian coking coals are located in the Rocky Mountains arid foothills of British Columbia and Alberta. They are typical of non-marine coals, characterized by total sulphur contents of less

    Jan 1, 1980

  • CIM
    The Quebec Asbestos Industry Mining and Milling

    By J. L. Gartshore

    PRACTICALLY all of Quebec's chrysotile asbestos production derives from twelve mining and milling operations located in the "Eastern Townships" area of the province. The annual output of these twelve

    Jan 1, 1962

  • CIM
    The Quebec Asbestos Testing and Quality Industry Control

    By J. P. Wiser

    THIS paper discusses testing and quality control of milled asbestos fibre. It has been composed with the intention of: (I) Summarizing past, present and probable future methods of testing and classify

    Jan 1, 1962

  • CIM
    The Quebrada Blanca Copper Project

    By B. R. McEwen, A. N. Samis, J. H. Gray

    "The Quebrada Blanca Copper Mine is an open pit copper project located at 4200 m elevation in the Chilean Andes. The deposit is a world-class supergene enriched porphyry with a mining reserve of 89 Mt

    Jan 1, 1994

  • CIM
    The Quinsam Coal Project

    By Doug Barnstable

    "Quinsam Coal Ltd. is assessing the potential of developing a thermal coal deposit near Middle Quinsam Lake on Vancouver Island. The coal reserve outlined is classified as a high-volatile, bituminous

    Jan 1, 1980

  • CIM
    The Quintette Coal Project

    By D. C. Rance

    "The Quintette Coal Limited property is located in the northeast coal area of British Columbia.A basic agreement with the Japanese steel industry was executed on January 27, 1981 for the sale of 69.5

    Jan 1, 1983

  • CIM
    The Quintette coal project (96ee627b-a342-4ea7-a0e8-7394b1a8b815)

    By D. C. Rance

    "The Quintette Coal Limited property is located in the north east coal area of British Columbia. A basic agreement with the Japanese steel industry was ex ecuted on January 27, 1981 for the sale of 69

    Jan 1, 1985

  • CIM
    The Quintette Coal Project Plant Design and Operational Experience

    By G. B. Bosworth, M. J. Lake, J. W. Hogg

    The Quintette Coal operation in northeastern British Columbia has one of the world's largest Preparation Plants, with a design capacity of 6.5 million tonnes per year of clean coal.This paper will dis

    Jan 1, 1987

  • CIM
    The Quintette Project

    By W. R. Leeder

    "The Quintette coal property lies in the Rocky Mountain foothills of northeastern British Columbia (see Figure 1). Quintette and the adjacent Bullmoose property of Teck Corporation are soon to become

    Jan 1, 1983

  • CIM
    The Rabbit Lake Mill -Twenty Years of Milling

    By Lam. E. K., J. W. Jarvi, B. P. Bharadwaj

    "The Rabbit Lake Operation is located in Northern Saskatchewan on the western shore of Wollaston Lake approximately 800 km north of Saskatoon, Saskatchewan.The Operation is owned by a joint venture of

    Jan 1, 1996

  • CIM
    The Rabbit Lake Mill Operation Past, Present and Future

    By K. Wyper

    "Gulf Minerals (Canada) Limited' s Rabbit Lake Uranium Operation is located in the northern portion of Saskatchewan, 198 miles southeast of Uranium City and 134 miles northwest of Lynn Lake Manitoba.T

    Jan 1, 1982

  • CIM
    The Rabbit Lake story

    By M. R. Babcock

    "The Rabbit Lake story began in the late sixties and will continue well into the twenty-first century. It is a story of success, of multiple ore body discoveries, of unique systems, and new methods ma

    Jan 1, 1989

  • CIM
    The Radiogenic Concentration of Uranium Ores

    By L. A. Kaufman

    "AbstractThe Bureau of Mines, Ottawa, in conjunction with Eldorado Mining and Refining (1944), Limited, has developed an automatic concentrator for uranium ores.A brief review of radioactivity is give

    Jan 1, 1950

  • CIM
    The Railway's Part In Coal Mining

    By D. W. McDonald

    Coal mining and railway transportation are so closely en-twined and so dependent one upon the other that the failure of one would mean the total collapse of the other. With this indisputable fact in m

    Jan 1, 1924

  • CIM
    The Raising Of No. 7 Shaft At Britannia Mines

    By E. C. Roper

    THE Britannia Mining & Smelting Company, Limited, have been operating their property at Britannia Beach, B.C., continuously for nearly forty years and have mined over 33,000,000 tons of ore from orebo

    Jan 1, 1945

  • CIM
    The Rate of Gold Dissolution in Concentrated Cupric Chloride Solutions

    By R. von Bonsdorff

    Electrochemical and quartz crystal microbalance (QCM) methods were used to investigate the dissolution rate of gold in a solution similar to those utilized by the Outokumpu HydroCopper® process. The m

    Jan 1, 2007

  • CIM
    The Re-Development of the KOV, Kananga and Tilwezembe Copper-Cobalt Deposits in the Democratic Republic of the Congo

    By L. Treadgold

    The KOV, Kananga and Tilwezembe copper-cobalt deposits in the Democratic Republic of the Congo have lain dormant for over ten years due to lack of funding by the State-owned mining company, Gecamines.

    Jan 1, 2007

  • CIM
    The Re-emergence of Resin in Pulp with Strong Base Resins as a Low Cost, Technically Viable Process for the Recovery of Uranium

    By Chris Fleming, John R. Goode, James Brown

    "Data will be produced from two uranium feasibility studies that were conducted in 2008, both involving uranium recovery from leached slurry by resin-in-pulp (RIP) with strong base resins. Excellent m

    Jan 1, 2010

  • CIM
    The Real Cost of Material Handling Problems – And How to Avoid Them

    By T. Holmes

    Investigations reveal that the throughput difference between a perfect production day and the average is often on the order of 40%, and that bulk solids handling system deficiencies are the largest (>

    Jan 1, 2019