Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Excavating the First Underground Gyratory Crusher at the Deep Mill Level Zone Mine, PT Freeport Indonesia
By E Hernandez, I Agustian, W Kusumohastuti
PT Freeport Indonesia is completing the first underground gyratory crusher excavation at their Deep Mill Level Zone (DMLZ) mine located in the mountains of Jayawijaya, District of West Papua, Indonesi
Mar 24, 2014
-
Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine
By T A. Carter
In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he
Mar 24, 2014
-
Challenging the Norm – Alternative Excavation Method in Mining
By R Burke, G Ramage, C Donnelly
Over the decades, Redpath has undertaken a multitude of tunnelling and underground excavation projects for civil and mining clients both domestically and internationally. These projects have been unde
Mar 24, 2014
-
Precharging Sublevel Shrinkage Production Rings in Hot and Reactive Ground with Electronic Blasting Systems
By B Crowdey, J Wall
The particular underground operation relating to this paper is a gold producer and has an orebody predominately consisting of rhyolite and marcasites pyrite. The ore has been identified as being react
Mar 24, 2014
-
Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine
By L Sandery, S Light
Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w
Mar 24, 2014
-
Development – Back to Basics
By I T. Ross
In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic
Mar 24, 2014
-
Use of a Pre-existing Microseismic Monitoring System to Detect Trapped Miners (with Reflections on Beaconsfield 2006)
By D Cumming-Potvin
Incidents that trap miners in underground mines have serious consequences for the miners and the mine operators involved. It is of utmost importance that mine operators utilise all available tools whe
Mar 24, 2014
-
A Remotely Operated Robotic Rock-breaker with Collision Avoidance for the Mining Industry
By A Boeing
Rock-breaker automation and remote operation improves the safety and efficiency of mining operations. This paper presents an overview of the Rocklogic rock-breaker automation system architecture that
Mar 24, 2014
-
Reduction of Airborne Dust on the E48 Extraction Level at Northparkes Mines
By C Vejrazka, A Wyllie
A common problem faced by underground mining operations around the world is airborne dust sourced from production and auxiliary processes. In most underground mining methods, air is generally directed
Mar 24, 2014
-
Exclusion Zone Calculation for Underground Explosives Storage
By M B. Lovitt
At present there exist few engineering calculations and principles to determine exclusion zones for personnel in the vicinity of underground explosive storage areas. This paper is written to encourage
Mar 24, 2014
-
A Miner’s Journey
By S Coughlan
"A personal account of my journey from a student from suburban Melbourne in the 1970s through 40 odd years in and around the mining industry including the important events that have moulded my thinkin
Mar 24, 2014
-
Management of High-pressure Groundwater in Underground Development at Ernest Henry Mine
By T Purvis, J Calverd, A-K Greve
The Ernest Henry Mining (EHM) underground mine is situated adjacent to the Great Artesian Basin in North Queensland and within a fracture zone. Underground development commenced in February 2008 and h
Mar 24, 2014
-
Understanding the Role of Production Drilling and Drilled Stocks in Efficient Operation of a Sublevel Cave Mine
By C Beal
Proper understanding and management of production drilling in sublevel cave (SLC) mines is essential for meeting production targets and for avoiding inefficiencies that could lead to costly bottleneck
Mar 24, 2014
-
Perspectives on Mineral Commodity Price Cycles and their Relevance to Underground Mining
By J P. Sykes, A Trench
Mineral commodity prices are subject to volatility over both the short and longer run – driving fluctuating operating margins for mining companies over time. Such market dynamics influence mine operat
Mar 24, 2014
-
Alignment and Differences between the Australian Water Accounting Standard and the Water Accounting Framework for the Minerals Industry
By A Woodley, A N. Danoucaras
In 2012 the Bureau of Meteorology, under the banner of the Water Accounting Standards Board, released the Australian Water Accounting Standard 1 (AWAS 1). This standard has been in development since 2
Nov 26, 2013
-
Challenges and Opportunities for Constructed Stream Diversions in the Bowen Basin, Central Queensland
By K White, R Hardie, J Merritt, B Kirsch, R Lucas
Constructed stream diversions are a common element of mine sites across Australia. A review of constructed stream diversion performance in the Bowen Basin funded by the Australian Coal Association Res
Nov 26, 2013
-
The Effects of Increased Salinity on Microbially Mediated Ecosystem Processes in Ephemeral Streams
By J L. Kerr, J Beyer-Robson, S Vink
Driven by an increasing need for water conservation, coal mine operators in the upper Isaac River catchment have placed significant emphasis upon the reuse of water. This initiative led to an overall
Nov 26, 2013
-
High-Density Sludge Process for Treating Metal Bearing Acid and Metalliferous Drainage Wastewaters
By A Dal-Corobbo
Traditional acid and metalliferous drainage (AMD) wastewater treatment focuses on the iron co-precipitation/adsorption process as this is a very effective method of reducing heavy metals, including co
Nov 26, 2013
-
Water Conservation at Construction Projects
By B Hannah, M Uriarte, F Labarca, C Madore, G Ganapathi, L Martin, T Haase
BechtelÆs Mining and Metals projects across the globe are executed in remote arid and semi-arid countries where providing even basic water supplies impose considerable challenges. Opportunities for wa
Nov 26, 2013
-
A Statistical Approach for Deriving Project Design Rainfall
By R Millar
A frequent challenge in mine water management and mine design is estimation of precipitation and extreme rainfall given a short record of site meteorological data. For remote mine projects, typically
Nov 26, 2013