Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Introduction and Application of Carbon-in-Pulp in a Heap Leach Project
By Mann LD
The Haveluck gold deposit, located 2.5km north of Meekatharra, contained 1,284,000 tonnes at an average grade of 1.8 g/t gold of drill delineated proved and probable ore prior to commencement of pro
Jan 1, 1982
-
The Introduction and Use of a Mine Monitoring System at Isa Mine
By Budd B
this paper outlines the operating advantages gained through applying a mine processor (MISA), to various underground and surface operations. On the surface, MISA monitors and/or controls ventilati
Jan 1, 1988
-
The Introduction of Axis at Black Star Open Cut
By M Gabbitus, B Young, T Lukins, M Slater
This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ
Sep 18, 2012
-
The Introduction of Full Face Multiple Shotfiring at Collinsville State Coal Mine
By Hargraves A. J
The paper outlines events at the Collinsville State Coal Mine, Queensland, leading to the practice of full face multiple shotfiring in bord and pillar development places. The 1954 disaster is referred
Jan 1, 1960
-
The Introduction of Self Contained Self Rescuers into the South African Mining Industry
The Government Mining Engineer of South Africa has decided to legislate that Self Contained Self Rescuers (S.C.S.R.) become a mandatory piece of equipment for all those persons proceeding undergro
Jan 1, 1988
-
The Investigation of a Gold Prospect
This paper deals chiefly with the preliminary examination, when a decision has to be made as to whether a prospect has a chance of developing into a mine or not. At this stage it is important to have
Jan 1, 1950
-
The Investigation of Atmospheric Dusts at North Broken Hill Limited
For many years the mining industry at Broken Hill, New South Wales, Australia, was carried on with just sufficient attention to underground ventilation and hygiene conditions as to keep pace with nece
Jan 1, 1940
-
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa
By K Kuganathan, Y Potvin
Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the deepe
Jan 1, 1998
-
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)
By Kuganathan K, Potvin Y
Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee
Jan 1, 1998
-
The Invisible Mine - Zero Environmental Water Impacts
The desire for minimising impacts of mining activities on the environment, and in particular, water resources; is usually tempered by the costs and practicalities of implementing æbest practiceÆ measu
Jan 1, 2006
-
The Iron Bridge magnetite deposits
By C Simpson
The Pilbara region of Western Australia is well known for its abundant exports of hematite-goethite deposits, which have been mined and exported since the 1960s. Magnetite has also been mined in Austr
Jul 24, 2017
-
The Iron Magnet Deposit
By G Bubner, C Gaughan
Magnetite mineralisation within the South Middleback Range has been known since the early 1930s; however, it was not until 1989 that BHP (then owners of the Middleback Ranges mining leases) drilled 10
Jan 1, 2005
-
The Iron Ore Deposits of the Mount Goldsworthy Area, Port Hedland District Western Australia (9bab30fb-7bc0-409c-9d77-1b7866dfa5ed)
The iron ore deposits of the Port Hedland district of North Western Australia are associated with band'ed sedimentary iron formations that form part of the local succession of folded and faulted
Jan 1, 1964
-
The Iron Ore Deposits of the Mount Goldsworthy Area, Port Hedland District Western Australia
The iron ore deposits of-the Port Hedland distract of North-Western Australia are associated with banded-sedimentary iron., formations that.form part of the local succession. of folde.d..and faulte
Jan 1, 1964
-
The Iron Ores of the Middleback Ranges, South Australia
The Middleback Ranges are a series of parallel northsouth ridges on the eastern side of the Eyre Peninsula, South Australia, about 20 miles inland from the Spencer Gulf, as shown in Fig. 1. They exten
Jan 1, 1936
-
The Iron Ores of Yampi Sound, Western Australia
By Edwards A. B
Yampi Sound is a small channel in the Buccaneer Archapelago (latitude 16° 10' S.; longitude 123° 40' E.), on the northern coast of Western Australia (Fig. 1), about 90 miles north
Jan 1, 1938
-
The irrefutable value of introducing a dynamic transport term into mill modelling
By D K. Weatherley, A N. Mainza, I Govender, L M. Tavares, M S. Powell
It is understood that rocks do not instantaneously transport along a grinding mill and are consequently not perfectly mixed, but this is conveniently overlooked in mill modelling. A lack of understand
Aug 24, 2022
-
The Isa Sizer - High technology Vibrating Screen
Mount Isa Mines Limited commissioned the Heavy Medium Plant in August 1982. The first processing stage using Mogensen Sizer 2056 dry screens, experienced unresolvable cloth blinding problems in atte
Jan 1, 1988
-
The Isasmelt Pocess doe Copper Smelting.
By Fountain C. R
In April 1987, Mount Isa Mines Limited (MIM) commissioned an ISASMELT reactor to smelt 15t/h of copper concentrate at the Mount Isa Copper Smelter. This unit was based on the Sirosmelt lance techno
Jan 1, 1989
-
The Jacobs Sliding Floor: Current Competitive Applications
The Jacobs Sliding Floor (Floor) is experiencing a surprisingly long competitive life. The first Floor was used on the Camino Tunnel in California in 1960. At that time the Robbins Company had bui
Jan 1, 1987