Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Terrace Mining Operations in Stratified Deposits
By A C. Carter
The increasing need for alternative energy sources as well as the less clearly perceived but equally increasing demand for non-fuel minerals has resulted in extensive exploitation of near surface depo
Jan 1, 1980
-
Terrace Mining Operations In Stratifield Deposits
By Carter A. C
The increasing need for alternative energy sources as well as the less clearly perceived but equally increasing demand for non-fuel minerals has resulted in extensive exploitation of near surface d
Jan 1, 1980
-
TerraFlowing_TM – an innovative and flexible method for tailings dewatering
By D Stephenson, N R. Steward
“TerraFlowingTM” is a dewatering process that addresses both the value proposition of Tailings as a Resource™, and the safe storage of tailings. “TerraFlowingTM” incorporates two stages of cyclone dew
Jul 1, 2021
-
Terranes of the New Guinea Orogen
By KenGemar P, Perembo R. C B, Winn R. D
The New Guinea orogen comprises terranes that have accreted to the northern margin of the Australian craton. The history of the accretion of terranes begins earlier (in the Late Cretaceous) and is
Jan 1, 1997
-
Terranes, Tectonics and the Pacific Rim
The movements of the major continental cratons and the distribution of the principal tectonostratigraphic terranes are reviewed in the Circum-Pacific region during Phanerozoic time. It is concluded th
Jan 1, 1990
-
Terratec Universal Raiseborer ù Raisebore Machine Technology
Drilling underground can be a hazardous undertaking in many circumstances. Raiseboring and boxhole boring underground could form an integral part of the block caving production methodology and getting
Jan 1, 2000
-
Tertiary Training - Non-degree Courses
In addressing the need for non-degree tertiary training, let us examine some recent reviews of engineering and geoscience education. The Finniston Report (1) criticised the formation of engineers in
Jan 1, 1989
-
Test Method To Assess Engineering Geology Of Coal Mines From Bore-Hole Data
The task of designing stable high walls and spoil piles in strip coal mines, and stable openings with controlled roofs and floors in underground collieries - within the constraints normally imposed
Jan 1, 1977
-
Test Work and Design of a Gravity Circuit for Iron Road’s Central Eyre Iron Project
By G J. Showers, P Botman, A G. Hunt
Iron Road Limited (Iron Road) is currently evaluating the feasibility of producing 21.5 Mt/a of high-grade (>66 per cent Fe) magnetite concentrate from a 3.7 Bt resource (JORC) located at Warramboo
Jul 13, 2015
-
Test Work on High Throughput Diamond Tracer Recovery from Alluvial Recovery Tailings with a Containerised Optical Sorter Under Real Production Conditions
Test Work on High Throughput Diamond Tracer Recovery from Alluvial Recovery Tailings with a Containerised Optical Sorter Under Real Production Conditions Worldwide alluvial diamond deposits are tradi
Sep 13, 2010
-
Testing Acid Generation in Cemented Paste Backfill
By B Arthur, K Sexsmith, D Hockley, S D
At the proposed Crandon Project, mill tailings would be depyritised for upland disposal. The resulting pyrite concentrate would be disposed of in the underground workings as a cement-amended paste bac
Jan 1, 2003
-
Testing and modelling of diverse iron ore slurries for pipeline friction and pump head derate
By V Matousek, A Sellgren, R Visintainer, G McCall
A 4-component model for settling slurry pipe flow has been previously described by Wilson et al (2006) and Sellgren et al (2014) to predict pipeline friction loss (hydraulic pressure gradient) over a
Nov 8, 2021
-
Testing and quantifying geological uncertainty (or a gram of drill data is worth a kilogram of geological interpretation)
By M P. Murphy, C M. D Barton
When developing a new underground mine, the geological interpretation that guides the mineral resource is crucial to the preparation of a reliable ore reserve. In preparing a robust geological model t
May 24, 2023
-
Testing and Sampling Requirements for Input to Spontaneous Combustion Risk Assessment
By B Beamish
"All underground coal mines in Australia are required to develop a Spontaneous CombustionManagement Plan (SCMP). The New South Wales Government has developed a guideline (MDG1006) to assist operations
Jun 1, 2012
-
Testing for the Selection of Comminution Circuits to Prepare Concentration Feed
What is the best circuit to comminute primary crusher product to make beneficiation feed? Finding the best circuit to crush and grind minerals to beneficiation sizes is a complex problem that can l
Jan 1, 1978
-
Testing for the Selection of Comminution Circuits to Prepare Concentration Feed (a815d937-44c4-4647-9f91-461932a0c73e)
The selection of the best comminution circuit for the preparation of concentration feed is a compromise based on economics, energy efficiency, labour costs, steel consumption, availability and other f
Jan 1, 1984
-
Testing new estimation techniques – rank and replace: a stockwork case study
By D Finn, D Kentwell
Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-
Sep 20, 2017
-
Testing of Bunton Wall Connection Characteristics
A series of physical tests have been conducted to determine the actual performance of bunton to shaft side wall connections typically used in new shaft construction in South Africa. The test set-up is
Jan 1, 2005
-
Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine Closure
By S Jahn, M Noel, E M. Rykaart, M Pau
Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m
Jan 1, 2003
-
Testing Rig for Fracture Grouting
By Shuqing L
The application of single liquid cement for fracture grouting in base rock may have history more than 120 years. The disadvantage of it is difficult to increase the grouting efficiency, because the
Jan 1, 1988