Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Time Dependent Mining Induced Subsidence Measured by Differential Interferometric Synthetic Aperture Radar

    By Jessica M. Wempen

    Differential Interferometric Synthetic Aperture Radar (DInSAR), a satellite-based remote sensing technique, has been demonstrated as a potentially practical method for measuring mining induced surface

    Jan 1, 2014

  • SME-ICGCM
    "Void Fill Techniques for Stabilizing Roof Conditions during LongwallShield Recovery"

    By Rusty Mchenry, Craig Dickerson, Robin L. Oldham

    "It has been proven that longwall faces can be moved safely and efficiently. However, abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recentl

    Jan 1, 2015

  • SME-ICGCM
    Study of the Backfill Confined Consolidation Law and Creep Constitutive Model under High Stress

    By Zhikai Wang, Wensheng Lyu, Peng Yang

    "To better understand the mechanical behavior of the compression deformation of backfill under high stresses corresponding to large depths, consolidation compression tests were performed for cemented

    Jan 1, 2017

  • SME-ICGCM
    An Investigation Into The Effectiveness Of Support Systems Combining Steel Supports And Rock Bolts Within Coal Mine Roadways

    By D. Reddish

    The combination of free standing steel supports, such as arches, and rock bolts (mixed support) has Frequently been in used in UK coal mine roadways when it is considered that the strata and/or enviro

    Jan 1, 2004

  • SME-ICGCM
    Mine Panel Collapse - Two Case Studies

    By Hanjie Chen

    A mine panel collapse may occur when pillar sizes are too small or the surrounding rock strata (roof or floor) yields. After a small pillar fails, its loading is rapidly transferred to adjacent pillar

    Jan 1, 1999

  • SME-ICGCM
    Unanticipated Multiple Seam Stresses From Pillar Systems Behaving As Pseudo Gob - Case Histories

    By Michael Gauna, Christopher Mark

    "Underground coal mining in the U.S. is conducted in numerous regions where previous workings exist above and/or below an actively mined seam. Miners know that overlying or underlying fully extracted

    Jan 1, 2016

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013

  • SME-ICGCM
    Development of Road Header Roof Bolting Module

    By Sean C. Farrell

    In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P

    Jan 1, 2014

  • SME-ICGCM
    Ground Control Practice at Leeville Underground Mine

    By Changshou Sun

    The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo

    Jan 1, 2013

  • SME-ICGCM
    The Potential of Acoustic Emissions from Three Point Bending Tests as Rock Failure Precursors

    By Filippo Vallianatos, Michael Verigakis, Vasili Saltas, Kosta Kaklis, Stelio Mavrigiannakis, Zach Agioutantis

    "Development of failure in brittle materials is associated with microcracks, which release energy in the form of elastic waves called acoustic emissions. This paper presents results from acoustic emis

    Jan 1, 2015

  • SME-ICGCM
    Safe, Efficient, and Cost-Effective Support of Longwall Cut through Entries

    By John R. Poland, Benjamin Mirabile

    "There are significant ground support hazards to both personnel and equipment when longwall equipment must mine through cross-panel entries. Backfilling support strategies are often cost prohibitive.

    Jan 1, 2016

  • SME-ICGCM
    Support Strategy for Tailgates below Gob Edge Using Split-Level Longwall Panel Layout for Deep Inclined Coal Seams

    By Pengfei Wang, Guorui Feng

    With increase of cover depth, dynamic incidents, such as large gateroad convergences and coal bursts, are frequently encountered when mining deep longwall panels. It would be more adverse due to large

    Jan 1, 2018

  • SME-ICGCM
    Intersection Stability and Tensioned Bolting

    By Yunqing Zhang

    Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt

    Jan 1, 2003

  • SME-ICGCM
    Case Studies of Innovative Cable Bolt Technology

    By Ben Mirabile

    Over the past three decades, the U.S. coal mining industry has widely used cable supports to supplement traditional primary bolting systems, especially in difficult ground conditions. However, increas

    Jan 1, 2013

  • SME-ICGCM
    Salt Pillar Design Equation

    By Leo L. Van Sambeek

    Specification of properly sized pillars to support the overburden is one of the most challenging aspects of salt mine design. Interest in salt pillar design is heightened by the recent flooding of th

    Jan 1, 1997

  • SME-ICGCM
    Moisture–Induced Swelling of Illinois Mine Roof Shales: A Visualized Method

    By Long Fan, Shimin Liu, Guijie Sang

    "Weak shale roof falls have long been the main cause for fatalities in underground coal mines. Moisture-induced swelling is one of the root causes for the degradation of roof shales. In this study, sl

    Jan 1, 2017

  • SME-ICGCM
    Optimization of Chain Pillars Design in Longwall Mining Method

    By Kazem Oraee, Mehran Gholincjad, Navid Hosseini

    "Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the

    Jan 1, 2010

  • SME-ICGCM
    Load And Deflection Response Of Ventilation Stoppings To Longwall Abutment Loading - A Case Study (49571726-6a2d-49b8-8ef0-957c4421195c)

    By David C. Oyler

    Few studies have specifically measured and documented the large-scale loading behavior and durability of ventilation stoppings to mining induced movements, particularly from longwalls. Ventilation sto

    Jan 1, 2001

  • SME-ICGCM
    An Investigation Of Longwall Pillar Stress History

    By M. G. Schuerger

    The United States Steel Mining Company, Inc., (USM) Lynch District, operated the No. 37 Mine in the Harlan coal seam, Harlan County, Kentucky, from 19'2 until its sale to Arch of Kentucky in 1984

    Jan 1, 1984

  • SME-ICGCM
    Comparison of Pillar Strengths Calculated Using Empirical Equations and Finite Elements

    By Aarao de Andrade Lima

    Mechanical properties typical of coal are used in the comparisons of pillar strengths based on finite elements and the empirical equations of Holland-Gaddy, Salamon-Munro, Obert¬Duvall, and Bieniawski

    Jan 1, 1997