Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Integration Of CAD-Based Mine Planning And Subsidence Engineering Systems

    By Andrew P. Jarosz

    The present computerized mine planning systems use CAD-like and Data Base Management System (DBMS) environments for the handling of numerical, textural, and graphical data. These two environments are

    Jan 1, 1995

  • SME-ICGCM
    Risk Assessment of Surface Fracture Endangered Ranges Over Shallow Mine Workings

    By Peter Fischer, Heinz-Jiirgen Kateloe, Anton Sroka, Axel Preusse

    "Since mining in Germany has a long history, there are still many locations where the surface fracture problem has to be solved. Shallow mine workings from an earlier era can affect the surface in a d

    Jan 1, 2010

  • SME-ICGCM
    An Application Of Energy Release Rate

    By Morgan M. Sears

    In recent years, one large mine collapse and numerous smaller bump events have resulted in a renewed interest in coal bump research. With numerical modeling, the Energy Release Rate (ERR) calculation

    Jan 1, 2009

  • SME-ICGCM
    Sizing Of Final Stumps For Safer Pillar Extraction

    By Christopher Mark

    Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extr

    Jan 1, 2001

  • SME-ICGCM
    Longwall Shield Recovery Using Mobile Roof Supports (64264c53-830d-4e84-b91e-78532103884a)

    By Frank Chase

    Longwall mining has gained the reputation as being the safest extraction method in underground coal mines. However, one of the most difficult tasks associated with longwall mining is moving the face

    Jan 1, 2007

  • SME-ICGCM
    Mitigating the Effects of High Horizontal Stress on Ground Control in An Underground Stone Mine: A Case History

    By John Ellenberger

    The nature of a stone deposit is rarely defined through exploration and engineering design, but more through the actual experience encountered as the mine develops; hence, issues with ground control a

    Jan 1, 2012

  • SME-ICGCM
    Practical Consideration In Longwall Support Selection

    By Thomas M. Barczak

    This report examines practical considerations in longwall support selection that have evolved from Bureau of Mines ground control research. The scope of discussion includes trends in support selection

    Jan 1, 1990

  • SME-ICGCM
    Cable Bolting - Potential Applications For Variable Strata Conditions

    By David Allen

    Cable bolting is a relatively new strata reinforcement technique that has been used successfully in Australia and the United Kingdom. Jim Walter Resources, Inc. has examined the principles and can vis

    Jan 1, 1994

  • SME-ICGCM
    An Integrated Approach To Subsidence Modelling And Prediction In The Collie Coal Basin (Western Australia)

    By Ian Misich

    A research programme has been undertaken to evaluate and predict the effect of total extraction of coal by underground methods on the superimposed strata, aquifer systems and ground surface in the Col

    Jan 1, 1993

  • SME-ICGCM
    Rock Mechanics Issues In The Trona Patch

    By Archie Richardson

    The trona mines in the Green River Basin, commonly known as the "trona patch," present an interesting set of rock mechanics issues stemming from mining in a unique underground environment. Like other

    Jan 1, 1999

  • SME-ICGCM
    Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)

    By Gabriel S. Esterhuizen

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very

    Jan 1, 2006

  • SME-ICGCM
    Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mines

    By A. Wahab Khair

    Coal mining has evolved into extensive use of continuous mining machines for development and production. This has resulted in an increase in dependence on the versatile continuous miners. The present-

    Jan 1, 2008

  • SME-ICGCM
    The Development and Application of Polyurethane Injectable Cable Bolts

    By Dakota D. Faulkner

    Cable bolts have been very effective in mine ground control. Non-tensioned and tensioned cable bolts are now used for both primary and supplemental bolting (Suder, 2001; Mirabile, 2010). In the United

    Jan 1, 2012

  • SME-ICGCM
    A Method For Assessing The Potential Of Mine Subsidence At Abandoned Mine Sites Through The Assistance Of Finite Element Modeling

    By Richard E. Bischke

    Computer assisted finite element model analysis, originally developed to study stress distributions in aircraft, has been modified into a versatile mining program, that can be used to assist the engi

    Jan 1, 1984

  • SME-ICGCM
    What Factors Over and Above Those Included in the Existing Coal Mine Roof Rating (CMRR) Could Also Be Predictive of Roof Instability in Underground Coal Mines?

    By Elizabeth Holley, Meriel Young, Gabriel Walton

    "The coal mine roof rating (CMRR) was developed by Chris Mark and Greg Molinda to bridge the gap between geological variation in underground coal mines and engineering design. The CMRR accounts for th

    Jan 1, 2018

  • SME-ICGCM
    Sub-Surface Ground Movements Associated With Longwall Mining

    By P. Gaskell

    The paper examines the development of rock movement between a longwall extraction horizon and the surface for a fully caved mining situation. Physical modelling has been used to examine the mechanics

    Jan 1, 1988

  • SME-ICGCM
    Gate Entry Design For Longwalls Using The Coal Mine Roof Rating

    By Chris Mark

    Successful longwall mining requires a stable tailgate entry. Gate entry performance is influenced by a number of geotechnical and design factors, including: - Pillar size and pillar loading; - Ro

    Jan 1, 1993

  • SME-ICGCM
    Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)

    By Holger Witthaus

    Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci

    Jan 1, 2009

  • SME-ICGCM
    Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)

    By David Newman

    Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to

    Jan 1, 2009

  • SME-ICGCM
    The Fault At The End Of The Tunnel

    By S. S. Rowland

    Good afternoon, ladies and gentlemen. It is a pleasure, for several reasons, to be here at this 13th International Conference on Ground Control in Mining. Of course it's always a pleasure to be a

    Jan 1, 1994