Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Treatment Of Copper Ores And Concentrates With Nitrogen Species Catalyzed Pressure LeachingBy C. G. Anderson
Today, with a stringent economic and environmental climate prevailing in the copper business, there is increased interest in evaluating new processing alternatives for production. Hydrometallurgical p
Jan 1, 2001
-
Planning and Preliminary Design of the North-South Bypass Tunnel, Brisbane, AustraliaBy Tony Peglas, Harry Asche, Eva Wood
The North-South Bypass Tunnel is a new $AUD1.5 billion underground traffic route in Queensland, Australia, a project of the Brisbane City Council. The tunnel is approximately 5.2 km long, bypassing th
Jan 1, 2005
-
Mechanized Mining of Narrow Veins – Problems and Equipment OptionsBy Jacek Paraszczak
Numerous problems encountered in the mining of narrow vein deposits challenge the productivity, competitiveness and profitability of many mines. Mechanization of mining operations is one of the most i
Jan 1, 1992
-
Kenya- A New Source Of Titanium MineralsBy J. C. Potvin
Although the occurrence of deposits of titanium minerals on Kenya’s present day beaches and adjacent dune systems has been well documented, the potential for older formations to host economically viab
Jan 1, 2001
-
The borehole monitoring experiment: field measurements of reservoir conditions and responses in longwall panel overburden during active miningBy S. J. Schatzel
In order to better understand the effects of longwall mining on the methane reservoir overlying the panel, the National Institute for Occupational Safety and Health/Pittsburgh Research Laboratory (NIO
Jan 1, 2009
-
Mining 1993In 1993, the United States' economy grew at a rate of about 3%. The Gross Domestic Product rose to $6.4 trillion. With more than 258 million people - 599,000 in mining including petroleum - the U
Jan 1, 1994
-
Stress, Geologic, And Support Design System (SGSSM) For Underground Mine SlopesBy J. C. Stankus
Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a slope entry, the problem is more difficult because a slope will transverse
Jan 1, 2011
-
Cliffs And Associates Limited Circored® Iron PlantBy E. C. Dowling, S. A. Elmquist, L. A. Kipfstuhl
The Cliffs and Associates Limited (CAL) 500,000 tpy HBI plant located in Trinidad was commissioned after modifications in early 2001. This plant employs the novel Lurgi Circored® process to reduce iro
Jan 1, 2002
-
Second Avenue Subway—Tunneling Beneath ManhattanBy Geoffrey Fosbrook, Donald Phillips, Anil Parikh
The Second Avenue Subway is a $16.8 billion project planned by the Metropolitan Transportation Authority (MTA) in New York City. It will reduce overcrowding and delays on the Lexington Avenue Line, im
Jan 1, 2005
-
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels ProjectBy Chris Tattersall, Tomyuki Kudo, Peter Raleigh, Nestor Garavelli, Steve Redmond, Michael J. Lehnen
Twin bore running tunnels driven approximately 4,500 route feet by a Mitsubishi Heavy Industries (MHI) EPB Tunnel Boring Machine link the West Portal and East Portal on this complex Light Rail Project
Jan 1, 2007
-
Conditions For Making Direct Reduced Iron, Transition Direct Reduced Iron And Pig Iron Nuggets In A Laboratory Furnace - Temperature-Time TransformationsBy B. Anameric
The pig iron nugget process is gaining in importance as an alternative to the traditional blast furnace. Throughout the process, self-reducing?fluxing dried greenballs composed of iron ore concentrate
Jan 1, 2007
-
Image Issues Could Hurt Canadian Oil Sands PlansWhile the United States and the rest of the world struggles with record-setting oil prices Canadian oil sands producers are ramping up production to meet demand for oil while also fighting against a h
Jan 1, 2008
-
SME Annual Meeting and Exhibit – Suppliers Display Latest in Mining Technology at SME 2007 ExhibitBy Georgene Renner, William R. Yernberg, William Gleason
American Commercial (ACI) offers a selection of ground control solutions. Beginning with steel liner plates installed in the Gratiot Avenue sewer system in Detroit, MI 1920, ACI is one of the leading
Jan 1, 2007
-
Microtunneling For Utilities Under Harold Railroad InterlockingBy William Reininger
Microtunneling provides a necessary solution for multiple utility crossings associated with the New York Metropolitan Transportation Authority Capital Construction Company?s (MTACC) Eastside Access Pr
-
New Minnesota Mining Projects Remain On Track Despite EconomyDespite the current economic downturn that is now decimating iron ore production, Minnesota?s mining operators remain optimistic about the long-term prospects for the industry. Reflecting this optimis
Jan 1, 2009
-
Barrick’s Gold Production to Increase by 40 PercentBarrick Gold plans to have four new gold mines in production by 2006. Together, the mines would increase the company’s output by 40 percent. The projects include Veladero in Argentina, Alto Chica
Jan 1, 2004
-
Assessing dilution, ore loss and profit differences from various hand-drawn dig limits compared to optimal ore-waste delineations in deposits of variable heterogeneityBy Fouad Faraj
For every blast pattern, zones of unique material types need to be classified before mining. Most material types can be summarized into different kinds of ore and waste. Blocks generated from blasthol
Oct 1, 2024
-
Design, Construction And Start-Up Of The Ilo Smelter Modernization ProjectBy H. Walqui, C. Noriega
Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000
Jan 1, 2007
-
Aboveground Testing Of Three Coal Mine Face Ventilation SystemsBy N. S. Tanious
Three water-spray ventilation systems were tested to determine their effectiveness in diluting methane at a room and pillar coal mine face. These systems were: the shrouded nozzle, the spray fan, and
Jan 1, 1987
-
Design and Construction of REM Tunnels and Underground Structures - RETC2023By Verya Nasri, Agustin Rey
Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill
Jun 13, 2023