Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Large Chamber Test for Toxic Fumes Analysis of Permissible Explosives

    By Dennis J. Viscusi, James H. III Rowland, Lon D. Santis, Mark H. Weslowski

    This paper describes the procedure for analysis of toxic fumes from the detonation of high explosives using the Large Chamber at the U.S. Bureau of Mines (USBM), Pittsburgh Research Center (PRC). This

    Jan 1, 1995

  • ISEE
    Testing Environmental Guidelines for Subaqueous Blasting Operations

    By A Lance McAnuff, Andrew Curic

    Until relatively recently, underwater blasting operations for channel deepening, dock construction and pipeline crossings of lakes, rivers and streams were conducted without much regard for the potent

    Jan 1, 1997

  • ISEE
    Use of Corrtex to Measure Explosive Performance and Stem Behavior in Oil Shale Fragmentation Tests

    By Gerald G. Schmitt, Richard D. Dick

    Continuous Reflectometry for Radius vs Time Experiments (CORRTEX) was used to monitor several conditions of blasts such as the detonation velocity of the explosive column, the functioning of different

    Jan 1, 1985

  • ISEE
    Implementation of High Density Ammonium Nitrate Prill in Emulsion Blends in an Open Pit Coal Mining Application

    By Winston Wilches B., Scott Scovira

    This paper discusses recent changes to the emulsion blend blasting agent used at the Drummond Pribbenow Mine in Colombia, one of the world’s largest open pit coal mines, and the resulting improvements

    Jan 1, 2014

  • ISEE
    Regression Model for Surface Vibrations from Underground Operations

    By Tristan Worsey, Nathan Rouse, Daykin Schnell

    The authors were retained by a proposed underground metals mine operation to evaluate the potential blast vibration amplitudes that could be generated at surface structures above the proposed mine. Li

  • ISEE
    The Effect On An Adjacent Tunnel From Blasting

    By Liu Hui Yang Nianhua Feng Shuyu

    The paper analyzed the dynamic stress in the rock around the tunnel and the effect on the stress variation for the different blasting parameters. Also, the paper verified the theoretical results by dy

    Jan 1, 1998

  • ISEE
    Loading Explosives in Large-Diameter Upholes

    By D K. Joyce

    Large diameter boreholes have become increasingly popular in underground mining. Drilling equipment can drill full rings, including vertical upholes. Special techniques are required to load upholes of

    Jan 1, 1988

  • ISEE
    Digital Energy Control - A New Tool for Blasting

    By Andrew Stirling

    Quarry operators are under constant scrutiny by individual neighbors and neighborhood associations due to the environmental issues arising from daily quarry operations. Issues range from truck traffic

    Jan 1, 2002

  • ISEE
    Dugout Blasting for Livestock Water

    By Mike Cammack

    Western South Dakota is predominately an agricultural area, with exception of the mining and timber industries in the Black Hills region. With precipitation rates averaging below fifteen inches per ye

    Jan 1, 1993

  • ISEE
    The Renovation of Theodore Roosevelt Dam

    By Tom Hanke, Joe Strobbe

    The 80 year old Theodore Roosevelt Dam built in a scenic canyon near Globe, Arizona is currently undergoing a major renovation. The old stone dam, built by hundreds of skilled stonemasons, is being co

    Jan 1, 1993

  • ISEE
    Three Laboratory Tests for Explosive Ruggedness

    By Michael Wieland

    Three laboratory tests were developed for rating the wave-impact ruggedness of cap-sensitive explosives that are used for blasting in underground coal mines. Destructible pipe fixtures, called simulat

    Jan 1, 1996

  • ISEE
    High Precision Cap Accuracy - An Independent Study

    By Calvin J. Konya

    There have been many different brands of high precision caps introduced on the US market in the last five years. High precision timing definitely effects the performance of the blast. One should be ab

    Jan 1, 1989

  • ISEE
    Blasting Procedures at the Republic Mine

    By R C. Berglund

    Since the Republic Mine began production in the mid 1950's, drilling and blasting practices have continually changed. In recent years, progress has been achieved through the development of more precis

    Jan 1, 1980

  • ISEE
    Investigative Blast Programme on Check Lap Kok - Site for the New Hong Kong Airport

    By Alastair Torrance, George Boucher, Roger Keller

    An investigative blast programme has been carried out to provide information on the best blasting methods to excavate Chek Lap Kok island in Hong Kong for the new airport. The objectives of the progra

    Jan 1, 1992

  • ISEE
    Priming Procedures Employed at the Tallya Quarry

    By Janos Foldesi, Calvin J. Konya

    The determination of the number of primers necessary to efficiently initiate an explosive column charge is essential to good blasting. If the number of primer is insufficient, the total energy stored

    Jan 1, 1976

  • ISEE
    Determination of Flying Distance of Pieces in Demolishing Blasting

    By Zhang Qi

    For the most part, the flying piece is serious endangerment in the demolition blasting. To prevent the endangerment, a large number of materials are needed as the protection. Therefore, the determinat

    Jan 1, 1994

  • ISEE
    Risk Management for the Explosives User

    By J T. Patterson

    The mining, quarrying and construction industries are often blamed for causing damage to residential-type structures when explosives are used. The claim experience for blasting vibration damage has be

    Jan 1, 1978

  • ISEE
    Methods of Evaluating Exploxive Reactivity of Explosive-Contaminated Solid Waste Substances

    By Richard J. Mainiero, T S. Bajpayee

    The Bureau of Mines, U.S. Department of the Interior, has developed test procedures and criteria for evaluating explosive reactivity of explosive contaminated solid waste substances generated by U.S.

    Jan 1, 1988

  • ISEE
    Demolition of Reinforced Concrete Bridges during Reconstruction of the Motorway Zagreb-Krapina

    By Goran Cirkovic, Zvonimir Ester, Josip Krsnik

    During the reconstruction of the motorway Zagreb-Krapina three reinforced concrete bridges were demolished, for their width was not adequate for the new motorway. Demolition of the three bridges was c

    Jan 1, 1997

  • ISEE
    Controlling Backbreak with Proper Borehole Timing

    By Calvin J. Konya

    Backbreak behind the last row of boreholes can be a significant problem for blasting operations. Backbreak will interfere with the proper drilling and execution of the subsequent shot and can produce

    Jan 1, 1987