A Tall Slender Tower Rises On Secant Piles and Drilled ShaftsBy Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet
Jan 1, 2016
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
Sheikh Jaber Al-Ahmad Causeway Project in Kuwait - A Case StudyBy Paolo Cavalcoli, Federico Pagliacci, Marco Chiarabelli
"The Sheikh Jaber Al-Ahmad Causeway Project in Kuwait is estimated at approximately $US3.7 billion and consists of constructing a causeway across the Kuwait Bay, connecting the Shuwaikh Port with the
Jan 1, 2016
-
Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - SynopsisBy Anupam Saxena
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U
Jan 1, 1996
-
Virtual Imaging Technologies as Decision-Making Tools for Geo- HazardsBy Arpana P. Sabu, Themis Vaxevanis, Sissy Nikolaou, Guillermo Diaz-Fanas
Geo-failures from extreme events (landslides, wild fires, earthquakes, floods, etc.) have increased exponentially in recent years around the world and within the USA. When catastrophic failures occur,
Jan 1, 2019
-
Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike RehabilitationBy Michael Arnold
"BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d
Jan 1, 2015
-
Staged Construction of an Interstate I69 Embankment: Coupled Hydromechanical Numerical SimulationBy Malek Smadi, Yazen A. Khasawneh
"New embankments were constructed mostly on soft clays as part of interstate I69 extension in southern Indiana. The embankments serve as bridge abutments and as part of the fill sections along the int
Jan 1, 2017
-
Drilled Displacement Piles - An Innovative Alternative to Typical Steel Driven PilesBy Patrick Granitzki, Alicia Plinio, Janitha Batagoda, Peter Howell
The City of Newark is making a comeback with new mixed-use multi-storied Residential Development projects. The majority of developers tend to use driven H-pile deep foundation systems to support their
Sep 8, 2021
-
Underpinning and Temporary Earth Retention for the ReTRAC Trench in RenoBy K. Ronald Chapman, Claus Ludwig, Doug Jenevein
"In the spring of 2005 Schnabel Foundation Company completed a $15.2 million Design/Build subcontract to underpin 11 structures, and provide 202,800 square feet of earth retention for the Reno Transpo
Jan 1, 2006
-
Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off WallBy James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016
-
Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank ErosionBy Brandon Smith, William Bohlen
Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al
Jan 1, 2019
-
Philadelphia Dock Story—Pile Challenges at Delaware RiverBy Craig H. Olson
"A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at
Jan 1, 2008
-
Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)By Craig H. Olson
"Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t
Jan 1, 2008
-
Liner Piles Used As Support To Kentledge For Initial Compression Load TestBy Venugopal B, M Kumaran, Thomas John, Vetriselvan A
The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t
Nov 1, 2022
-
Performance Analysis Of Fly Ash Stabilized, Highly Saline Unsaturated Expansive Clays: A Case StudyBy Mohini Patel, Jahnavi Parmar, Pranav R. T Peddinti
Expansive clays pose a variety of geotechnical problems. Although the admixture stabilization is proven to address their problematic swelling and shrinkage characteristics, the influence of unsaturate
May 1, 2022
-
Static Behavior of Steel H-Piles under Axial Load using Scale Models in Very Soft ClaysBy Francisco A. Flores, Rigoberto Torres
The Complementary Technical Standards of Mexico’s City Building Code do not mention the criteria to compute the bearing capacity of Steel H-piles. It is necessary to increase knowledge in using steel
Sep 8, 2021
-
Urban High Capacity Deep Foundation Solutions in Sites with Complex History and GeologyBy Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t
Jan 1, 2019
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019
-
Pile Design Philosophies For Coralline And Weak Carbonate RocksBy Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar
Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks
Sep 1, 2022
-
Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BCBy Keith MacKay, John Carter, David Siddle, Fernando Faminia
"The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands
Jan 1, 2016