Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected PilesBy A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
-
Slurry Walls Executed with the Cutting Soil Mixing Technique: A Case HistoryBy Carnevale Francesco, Bracci Laudiero Alberto, Pampanin Piero
"SummaryIn the Port of Naples a slurry wall has been realized through a sandy layer up to a deep tuff layer using the Cutting Soil Mixing technique.The executed panels have dimensions of 2.8 m x0.65 m
Jan 1, 2014
-
Challenges Associated with the Construction of a Cofferdam – A Case StudyBy Eric S. White, Thomas J. Sabourin, Khuram R. Mohib
"This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init
Jan 1, 2017
-
The Impact Of Vibro Compaction Adjacent To Large Vertical Maritime Retaining StructuresBy Barry C. Slocombe
The development of new ports, extensions of existing facilities and reclamation of former docks will involve consideration of a variety of geotechnical problems. This paper presents data including in
Jan 1, 2008
-
Determination Of Pile Damage In Concrete PilesBy Gerald E. H. Verbeek
As the number of driven concrete piles with Embedded Data Collectors increases, it has become possible to compare the widely used Beta Method to assess pile damage (using the change of pile impedance)
Jan 1, 2011
-
Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation RemediationBy Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
-
Practical Aspects Of Compensation Grouting ? SynopsisBy Philip J. H. Ball
The new application and development of grout jacking processes has combined, over the last decade in particular, to provide a method by which the effects of new underground construction on superficial
Jan 1, 2000
-
-
Integrity Testing - Friend Or Foe?By Bernard H. Hertlein
Transportation system structures have come under very close scrutiny in the last couple of years, largely due to the damaging effects of disasters, both natural and man-made. In the Pacific northwest
Jan 1, 1998
-
Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NYBy M. D. Riegel, Brian T. Felber
"Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high
Jan 1, 2016
-
An Unusual Permanent Shoring JobBy Gordon Demetrick
3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi
Jan 1, 1987
-
Use Of Nondestructive Testing To Evaluate Defects In Drilled Shafts: Status Of FHWA Research - BackgroundBy Clyde Baker
Drilled shafts for many situations offer an economical alternative to driven piles. The Federal Highway Administration (FHWA) has spent considerable time and money in research and developing design an
Jan 1, 1989
-
Shoring And Caissons At The Air Canada Centre/Raptors StadiumBy Dawn C. Tattle
[ ] Panoramic View of Completed Facade Supports The following case history describes the installation of earth retention systems, historical facade supports and structural caissons by Anchor Shor
Jan 1, 1997
-
Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON ProjectBy Elizabeth M. Smith
The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss
Jan 1, 2009
-
New Technology For An Old Seawall: Micropile Installation At Ellis Island National Park In New York HarborBy Helen D. Robinson
The seawalls that surround Ellis Island were constructed in the early 1900s and now show varying degrees of deterioration. An innovative approach to the structural repair of the seawalls was develope
Jan 1, 2008
-
New Piling System With Multi-Head Hammer Drill Capable Of Drilling Including 35,000 Psi Rock "Mach Drilling System" And Some Construction Examples - 1. Incentive Of DevelopmentBy J. Nakayama
For drilling large diameter holes for deep foundations, the common and distressing difficulty of long standing has been in coping with ground containing rocky formations and boulders. Where geological
Jan 1, 1988
-
Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, GujaratBy Ekhlaq A. Khan
"The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a
Jan 1, 2017
-
Bi-directional Load Testing Using Donut Super Cells For Hangzhou West Railway StationBy Antonio Marinucci, Robin Mao
The new Hangzhou West Railway Station, which is currently in the early stages of construction, will be located in the city of Hangzhou, China. To accomplish the ambitious goals of the project, the con
-
Analysis Of Load Tests Of Drilled Shafts. For Support Of Overhead SignsBy Roy H. Borde
The design of foundations to support overhead signs is primarily based on providing adequate resistance against horizontal wind loads. The typically used subgrade reaction model for the load-deflectio
Jan 1, 1988
-
Practical Soil Nail Wall Design And Constructability IssuesBy Walter G. Kutschke
Four significant soil nail wall projects in the eastern United States were recently completed with a combined area of 175,000 square feet of finished shotcrete surface. These projects required the us
Jan 1, 2007