Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Engineering techniques to optimize an Arctic mine

    By Alan E. Renshaw

    "This paper is a practical overview of ways to reduce cost in the design and operation of an Arctic mine. The economically important issues of the Arctic mine that will be addressed include: permafros

    Jan 1, 1996

  • CIM
    The evolution of cut-and-fill mining at Inco?s Thompson Mine

    By R. B. Humphrey

    Cut-and-fill mining methods at the Thompson Mine have undergone significant changes since production began in 1961. Changes have been introduced in almost all aspects of the mining operation, from the

    Jan 1, 1979

  • CIM
    Friction Stir Technology - Recent Developments in Process Variants and Applications

    By P. J. Oakley, W. M. Thomas, S. W. Kallee, D. G. Staines

    A Friction stir welding (FSW) is now extensively used in aluminium industries for joining and material processing applications. The (FSW) technology has gained increasing interest and importance since

    Jan 1, 2006

  • CIM
    Spontaneous Combustion of Coal

    By T. Scully

    Since early days in coal mining, it has been known that some coals and the carbonaceous materials associated with them will heat and fire spontaneously. Many theories have been advanced to account for

    Jan 1, 1931

  • CIM
    Gold Analysis - Fire Assaying and Alternative Methods

    By James R. Yeager, Eric L. Hoffman, John R. Clark

    "Abstract -This paper describes fire assaying and ‘high tech’ alternatives for gold analysis, including advantages and disadvantages of each method. These ‘high tech’ methods include INAA (instrumenta

    Jan 1, 1998

  • CIM
    East Boulder Mine - A River Runs Through It

    By Ken J. Brouwer

    Stillwater Mining Company commenced construction and development of the East Boulder underground mine in 1998. This new PGM mine is situated adjacent to the East Boulder River approximately 35 miles s

    May 1, 2002

  • CIM
    Investigation into Laboratory Scale Tests for the Sizing of High Pressure Grinding Rolls (36201383-38b6-40ff-a8ef-b5e69088dfb5)

    By J. Drozdiak

    In this paper we present the results of preliminary investigations into the applicability of new laboratory scale tests for the prediction of operating gap and specific throughput in high pressure gri

    Jan 1, 2012

  • CIM
    Development of the New Oxygen-Enriched Bottom-Blowing Continuous Copper Converting Process

    By Yan Jie

    The oxygen-enriched bottom-blowing continuous converting process for copper matte was recently developed by the China-ENFI Engineering Corporation. The first commercial plant based on this technology

    Jan 1, 2014

  • CIM
    Processing Asbestos Fibres: Effects Upon Physical Properties

    By M. S. Badollet

    "IntroductionAsbestos as received by the manufacturer of asbestos products is •in the •form of either crudes or milled fibres processed to different degrees of texture. Frequently, the manufacturer fi

    Jan 1, 1950

  • CIM
    The Role of Oxygen in Xanthate Flotation of Galena, Pyrite and Chalcopyrite

    A study was made to determine the effect of increasing concentrations of dissolved oxygen on the floatability of galena pyrite and chalcopyrite. Adsorption, flotation and contact-angle tests were done

    Jan 1, 1970

  • CIM
    Lead Through the Ages

    By F. Habashi

    Lead is an ancient metal. The alchemists related it to the planet Saturn. It was largely obtained by smelting galena which generally contains small quantities of silver. That is why the metallurgy of

    Jan 1, 2008

  • CIM
    Northern Quebec’s Strange Lake Rare Earth Elements (REE) Deposit Rougher Flotation Study

    By Neri Roux, Ross Gilders, Yemi Oyediran, Leo Cheung

    Quest Rare Minerals Ltd. is developing their Strange Lake B Zone REE deposit located in Northern Quebec. An extensive batch bench scale testing program was launched to investigate open circuit rougher

    Jan 1, 2014

  • CIM
    Main Factors Affecting the Size of Hydrogen and Oxygen Bubbles Produced in the Electroflotation Process

    By H. J. B. Couto, J. G. S. Puelles, M. L. Torem, R. H. Rojas, A. G. Merma

    Understanding the limits of fine particle flotation is fundamental to achieving a significant and selective separation. Conventional flotation processes are not suitable to treat these particles becau

    Jan 1, 2016

  • CIM
    Advanced Control Technology for Mining to Improved Benefits, Support, and Sustainability

    By Robert K. Jonas

    Mining companies can improve production and reduce costs by using the best available technology to control their operations. Many mines are challenged to use multivariable predictive control due to li

    Oct 1, 2009

  • CIM
    Quantitative Modeling for Neutralization/Co-Precipitation Treatment of Acid Mine Drainage

    By S. Suzuki, C. Tokoro, S. Owada, T. Sakakibara

    Acid mine drainage (AMD) has been actively treated by neutralization from about 80 abandoned or closed mines in Japan. More efficient and cost effective treatment processes has been demanded for AMD d

    Jan 1, 2014

  • CIM
    Main Controlling Factors of the Mining-Induced Deformation and Failure of Surface Borehole and their Time-Space Effect

    By Jianzhong Liu

    Based on the characteristics of overburden rock strata movement, surface ground subsidence and casing deformation and failure, a tension-shear combination failure model of surface borehole was set up.

    Aug 1, 2013

  • CIM
    Management of Squeezing Ground Conditions at Laronde Mine

    By P. Turcotte, E. Karampinos

    "Construction of underground excavations in squeezing ground conditions faces several technical challenges that can result in delays in production and high costs due to rehabilitation. A review of the

    Jan 1, 2015

  • CIM
    Emergency Plan Methodology for Mine Fire Simulations in Chuquicamata Underground Mine

    By J. E. Carrasco, J. D. Stinnette, R. A. Alvarez

    "Chuquicamata Underground Mine is one of the main projects for the Chilean government copper company (CODELCO). Underground mine project has been under construction since 2013 and presents a solution

    Jan 1, 2019

  • CIM
    Towards a Comprehensive Model of the Flash Smelting Furnace

    By P. Taskinen, A. Jokilaakso

    The Flash Smelting Process for copper and nickel production has been one of the most successful new metallurgical process developments in the 20th century. The experimental data from laboratory scale

    Jan 1, 2019

  • CIM
    Gold Deposits: Establishing Sampling Protocols and Monitoring Quality Control

    By Dale A. Sketchley

    "Abstract - Large differences in gold content between rock fragments or small volumes of unbroken rock, commonly referred to as the nugget effect, are related to sample and subsample weights, crushing

    Jan 1, 1998