Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Improvements in Zinc Leach Residue Treatment by the Waelz Process at the Annaka Refinery

    By Y. Kusuda

    Since 1981, the Annaka refinery has recovered zinc from zinc leach residues by the Waelz Process. The important considerations of this process are the prevention of the growth of coating accretions in

    Jan 1, 2006

  • CIM
    Arsenic Distribution in Smelting Via Teniente Converter

    By C. M. Acuna, M. Sherrington

    In high temperature processes thermodynamic equilibrium is assumed and therefore chemical potential of elements, among the condensed phases, have to be the same. In such situation impurities distribut

    Jan 1, 2007

  • CIM
    Selection of Smelting Process for High Cu/S Ratio Copper Concentrate

    By Wei Ye, Lei Li, Xianjian Guo, Feng He

    The purpose of the paper is to study the smelting process of copper concentrate with high Cu/S ratio produced in Africa or other areas around the world and theoretically analyze the influence of slag

    Jan 1, 2019

  • CIM
    Towards Improving Gearless Mill Drive Availability

    By P. R. Warner

    This paper reviews the development of certain aspects of the electrical specifications of Anglo American?s suite of specifications for gearless mill drives (?GMDs?). These specifications are based on

    Nov 1, 2011

  • CIM
    Towards Improving Gearless Mill Drive Availability (8130f4b0-7b8b-4d03-8ef0-64e205ed7248)

    By P. R. Warner

    This paper reviews the development of certain aspects of the electrical specifications of Anglo American’s suite of specifications for gearless mill drives (“GMDs”). These specifications are based on

    Jan 1, 2012

  • CIM
    An Overview of Biological Treatment Concepts for Nickel and Cobalt Recovery, and SO, Removal

    By J. L. Huisman, G. Schouten

    After pyrometallurgy and hydrometallurgy, bio(hydro)metallurgy is the latest development in the ongoing search for efficient and economic metal winning processes. In addition to bioleaching, other bio

    Jan 1, 2005

  • CIM
    Measuring, Predicting And Managing Grinding Media Wear

    In 2009 Newmont Mining Corporation?s annual global spend on grinding media reached $94M USD, having doubled in the five years since 2004. The major contributing factor to the spend escalation during t

    Nov 1, 2011

  • CIM
    Measuring, Predicting and Managing Grinding Media Wear (e15526b0-be53-4d79-8a8c-92734f77c994)

    By J. Seidel

    In 2009 Newmont Mining Corporation’s annual global spend on grinding media reached $94M USD, having doubled in the five years since 2004. The major contributing factor to the spend escalation during t

    Jan 1, 2012

  • CIM
    Development and Implementation of an Expert System for Grinding Control at the Dome Mine

    By John Eggert, Paul Benford

    "Since 1982, Placer Dome Inc. -Dome Mine has steadily increased mill throughput. Tonnage has increased from a nominal design capacity of 3000 short tons per day, attained in 1985, to 4130 stpd by the

    Jan 1, 1994

  • CIM
    Discrete Event Simulation and Scheduling Algorithms for the Development of Copper and Nickel Converting Operational Modes

    By Alessandro Navarra

    Discrete event simulation provides a computational framework in which the use of smelting equipment can be analyzed and optimized, leading to the development of alternative modes of operation. Much of

    Jan 1, 2014

  • CIM
    Electric Furnace Smelting of Tin Concentrate from Sullivan Ore

    By E. L. Jones

    THE concentration of tin in the tailing from Sullivan ore has been de-scribed by H. R. Banks, superintendent of the Sullivan concentrator, in a paper presented at the annual meeting of the B.C. Divisi

    Jan 1, 1944

  • CIM
    Collaring a Shaft in Deep Overburden at Chimo Gold Mines Limited

    By J. S. Redpath

    Eighty feet of overburden, thirty feet consisting of fine, water-bearing sands, was encountered during the construction of a shaft collar for Chimo Gold Mines Limited at its Louvicourt, Quebec, proper

    Jan 1, 1966

  • CIM
    Air Granulation of Copper Slags for Iron Silicate Production Part 2: Drawing Parallels from Air Granulation of PGM Converter Slag

    By M. Mahdi, L. So, A. MacMillan, D. Metcalfe, J. Woloshyn, D. Sauter, N. Uys, JP. Janse van Rensburg

    For city smelters, with limited real estate, efficient slag cleaning furnaces followed by water granulation to produce an iron silicate product is the preferred process approach. Water granulation, ho

    Jan 1, 2019

  • CIM
    EcoNomics?? Delivering Profitable Sustainability

    By Ken Woloschuk

    ??Owners?Perspective ??Owners?Challenges ??EcoNomics?Delivery Model ??Projects ??Project Outcomes ??Questions ??Balancing the triple bottom line initiative: ?shareholders expectations of econo

    May 1, 2008

  • CIM
    Virtual Modeling in Tube Hydroforming Process of Complex Aluminium Parts

    By Mihaita Matei

    An adaptive approach to control the deformation in tube hydroforming process is presented. This requires: the use of an existing non-linear FE software (ABAQUS) that incorporates a user material model

    Jan 1, 2011

  • CIM
    Study of Separation of Terbium and Dysprosium from Other REE by Solvent Extraction

    By Carlos Antônio de Morais, Renata Dias Abreu

    The present work describes a study of the separation of terbium and dysprosium from heavy RE concentrate through a solvent extraction circuit in a counter-current system. As the efficiency of the REE

    Jan 1, 2014

  • CIM
    Characterizing Pitting Corrosion of 90/10 Cupro-Nickel Chiller Tubes

    By G. P. Gu

    The in-service 90/10 cupro-nickel tubes in a water-chiller system suffered from severe corrosion damage during their relatively short service life causing unexpected down time. In addition to downtime

    Jan 1, 2005

  • CIM
    Quasi-Real Time Seismic Hazard Maps for Mining (336da3c3-b002-41ab-b591-f666f29da050)

    By Marty Hudyma

    Mining-induced seismicity and rockbursting is one of the primary risks in deep mines. Seismic data management software has been created to facilitate analysis of mining-induced seismicity. The Mine Se

    Oct 1, 2009

  • CIM
    Integrating Work Index into Mine Planning at Large Scale Mining Operations

    By Jose A. Caceres

    Mine planning and mineral processing optimization are usually treated as two unconnected problems, especially at open pit and panel caving mines where the cut-off grade is practically the only variab

    May 1, 2004

  • CIM
    Compilation of geology theses, 1991-1993. Part IIA-C: Abstracts of selected theses at Canadian Earth Science Departments

    By Wouter Bleeker, Isabelle Cadieux

    "Abstracts of theses related to mineral deposit studies and exploration, completed at geology or earth science departments of Canadian universities, have been compiled for the period 1991 to mid-l993.

    Jan 1, 1994