Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Procedures for Assessing Flow Capacity and Seepage-face Patterns of Linear Deposits of Mine-Waste

    By Ali Roshanfekr

    Linear mine-waste dumps at open-pit mine sites essentially represent expedient places to deposit large quantities of waste rock. Being in valleys in most cases, the effect of the water flowing through

    May 1, 2011

  • CIM
    A Computer Simulation of an Agitation Mill Abrasion Process for Waste Printed Circuit Boards

    By K. Torigoe, S. Owad, C. Tokoro, Y Tsunazawa

    The mechanism of an abrasion process to recover metal values by removing components from printed circuit boards (PCBs) is modeled using a discrete element method (DEM) simulation. To simulate the abra

    Jan 1, 2011

  • CIM
    Development Trend of Underground Rock Support

    By C. C. Li

    Traditionally, strong and stiff devices, such as fully encapsulated rebar bolts and concrete lining and arches, are preferred for underground rock support. The attention is paid to the strength of the

    Jan 1, 2015

  • CIM
    A Simple Chemical Method of Tracing Mineralization Through Light Non-residual Overburden

    By E. O. Chisholm

    Synopsis The colour changes effected in a solution of dithizone by trace amounts of copper, lead, and zinc mineralization provide a sensitive field test for these metals. The method has been used w

    Jan 1, 1950

  • CIM
    Improved Flotation at Strathcona Mill by New Washwater Spray Design

    By Gerhard W. Heinrich, Gerald V. Schroeder, Daniel A. Murphy, Daniel F. Suarez, Jamie B. Beauchamp

    "Washwater 'Finger' sprays were installed and tested in the copper/nickel separation circuit at Strathcona Mill to improve flotation capacities and related metallurgical performances. The new spray de

    Jan 1, 1994

  • CIM
    Where Are We Going In This Hand Basket?

    By Lawrence Devon Smith

    What is a Failed Project? For mining projects, some key indicators of a ?failed? project are: ? Cost is more than it should be (particularly capital) ? Schedule ? It takes longer to build than exp

    May 1, 2010

  • CIM
    Design of Energy Efficient Shaft Systems

    By W. J. Kempson

    In recent years, substantial progress has been made with respect to the definition and control of the primary energy requirements in underground mines. Little has, however been done to develop a more

    Aug 1, 2013

  • CIM
    Dynamic Tensile Failure of Rocks Subjected to Simulated In Situ Strsses Around Underground Openings

    By R. Chen, K. Xia

    In deep mining activities, blasting induced compressive stress wave would be reflected as tensile wave at a free surface around the openings, which would facilitate the tensile failure of the deep roc

    Jan 1, 2015

  • CIM
    Rock Mass Grouting For Dams, an Observational Design Approach

    By J. A. Espinosa-Guillen, J. A. Lopez-Molina, S. García, J. A. Valencia-Quintanar

    "The design and implementation of grouting treatments in rock masses are procedures that require continuous adjustment of parameters and criteria to optimize the results. In this proposal we describe

    Jan 1, 2015

  • CIM
    TIG Welding of Single Crystal CMSX-4 Alloy

    By J. Dupre, A. Gontcharov, H. Pepin

    Produced by the conventional TIG welding CMSX-4 welds had been studied. It was demostrated that microstructure of welds depended on filler materials, welding parameters and joint design. Epitaxial sol

    Jan 1, 2006

  • CIM
    Minéralisations aurifères de la partie centrale de la Province de Grenville, Bouclier Canadien

    By Michel Gauthier, Pierre Marcoux, Gaétan Morin

    "The recent opening of Muscocho's gold mine at Montauban, as weil as the discovery of several new copper-gold showings of a similar nature near the confluence of the Saguenay and St , Lawrence ha

    Jan 1, 1985

  • CIM
    Physical Characteristics and Choice of Tools For Drilling

    By Abdelhak Bentriou

    The choice of tool for the first well of an oilfield or gasfield is an important factor, given that we will be drilling with the same type of tool for the entire phase and explains why we need to have

    Aug 1, 2013

  • CIM
    Non-Destructive Determination of Refractory and Build-Up Thickness in Operating Furnaces Using an Acousto Ultrasonic Reflection Technique

    For the last few years, a new and innovative technique has been successfully used to determine refractory and castable thickness in various metallurgical vessels. The acousto ultrasonic-echo (AU-E) te

    Jan 1, 2005

  • CIM
    Advance in Mechanization in Collieries of the Sydney Coal-Field

    By A. S. MacNeil

    In the operation of any colliery, a factor of prime importance is power, of which there are three sources available--man, horse, and mechanical. It is obvious that man-power is by far the most expensi

    Jan 1, 1932

  • CIM
    A Proposal? on Safety Factors for Hoisting Ropes

    By L. O. Cooper

    IN THE operation of most mines, hoisting ropes, made of steel, play a very important part in the conveying of men and material between surface and the underground workings. It is obvious that, in orde

    Jan 1, 1951

  • CIM
    Interactive tools for learning basic geostatistical concepts

    By A. Vervoort, A. Govaerts

    Geostatistical concepts are often difficult for students to understand, even those with a strong mathematical background. One of the main problems is the link between the variation of the parameter va

    Jan 1, 2014

  • CIM
    Productivity improvement in mechanized cut-and-fill mining at Trout Lake Mine

    By F. P. Yungwirth

    "IntroductionTrout Lake Mine is located about 5 km north of the Hudson Bay Mining and Smelting Co., Limited complex at Flin Flon, Manitoba. The mine was brought into production in 1982at the onset of

    Jan 1, 1988

  • CIM
    Kinetic study of methanol oxidation at different temperatures using a new and improved electrochemical cell design

    By R. Baker

    A novel electrochemical half-cell and corresponding working electrode were designed to evaluate the electro-catalytic activities of catalysts in an environment close to that of an operating proton exc

    Jan 1, 2005

  • CIM
    Statistical design for material and process optimization

    By G. Pouskouleli, T. A. Wheat

    "The role and benefits of using statistical methodology in the development and optimization of materials and processes is examined. It is shown that considerable benefits accrue from the use of an app

    Jan 1, 1992

  • CIM
    Longwall Mining in Thin Seams

    By N. T. Avard

    THE Joggins coal field, Cumberland county, Nova Scotia, is on the easterly side of Chignecto bay, at the head of the bay of Fundy. In area, so far as proven, the field extends easterly from the town o

    Jan 1, 1944