Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Pilot Plant Pressure Oxidation of Refractory Gold-Silver Concentrate from Eldorado Gold Corporation’s Certej Project in RomaniaBy J. Stiksma, J. Dennett, R. Kalanchey, J. Ji, M. Collins, T. Chan, R. Berezowsky
A pilot plant campaign has been conducted by Sherritt Technologies in support of Eldorado Gold Corporation’s evaluation of pressure oxidation technology for the treatment of refractory gold concentrat
Jan 1, 2014
-
Slope Stability in Jointed RockBy Peter N. Calder
The orientation of planes of inherent weakness (joints) with reference to an excavation in rock is the critical factor determining stability. The purely frictional 'residual' strength remaining follow
Jan 1, 1970
-
Successful Project ImplementationBy Kenneth G. Thomas
Since approximately 2003 we have witnessed the unprecedented escalation in commodity prices. Coupled with economic chaos following the 2008 economic downturn this has caused difficulties in controllin
Jan 1, 2011
-
The Current Immsa Jarosite CircuitBy C. Moctezuma
Since the start up of the IMMSA electrolytic zinc refinery in 1982, the dissolved iron coming from the acid attack of the ferrites has been precipitated by the jarosite process. At the beginning of op
Jan 1, 2006
-
A New Era in Pressure HydrometallurgyBy Fathi Habashi
A new era in pressure hydrometallurgy is marked when the roasting - leaching - electrowinning process in the zinc industry was replaced by direct pressure leaching of zinc concentrate. Since then, the
Jan 1, 2014
-
Automatic Control at East Malartic Part 2By A. Gillis
"In order to obtain the equipment necessary to automate the equipment it was decided that the Department of Mines and Milltronics would jointly survey the circuit. This survey involved a metallurgical
Jan 1, 1965
-
Phase Equilibria Studies to Support the Technology Development for the Recycling of Lithium Ion BatteriesBy E. Haccuria
Due to the growing share of electrical cars, the use of lithium ion batteries significantly increased. Recycling of these batteries is essential to safely dispose hazardous materials as well as to rec
Jan 1, 2014
-
Effect of the Concentration of the Solution of Gold on the Preparation of Active Catalysts with HAuCl4.By S. Ivanova
The results presented in this paper show that the gold solution dilution is a key parameter to control the dispersion of gold on ?-Al2O3 the selected support. The variation of concentration leads to c
Oct 1, 2003
-
The Urbangold Technology for Enhancing Metals Recovery and Efficiency in WEEE RecyclingBy S. Konetschnik, Lux Degel, R. Degel, T. Haslinger
UrbanGold and its partners from Mettop and SMS group have developed a novel technology for the recovery of valuables from all non-ferrous metals’ fractions of WEEE (Waste Electrical and Electronic Equ
Jan 1, 2019
-
Kupol Mill Leach Operation In 2008-09By G. Kolosay, J. Rajala, G. Deschênes, A. Romanov
ABSTRACT: The Kupol project, located in Far East Russia, treats a high-grade, free-milling ore containing 25.5 g/t Au, 298.3 g/t Ag, and 0.5% pyrite,with a P70of 53 microns. Most of the gold occurs as
Jan 1, 2011
-
Pilot Test Of Emew® Technology Application To Copper Electrorefinery Bleed Streams With High Arsenic ContentBy L. Byszynski
The results of a three month evaluation of the application of EMEW® technology at the KGHM Glogów II Smelter tank house bleed stream are presented. The current, conven¬tional electrolyte decopperizati
Jan 1, 2007
-
Development of Buzwagi Mine in Tanzania Feasibility Study, Permitting & Project ExecutionThe Buzwagi Project is owned by Barrick Gold Corporation and located in the Lake Victoria Goldfields of central Tanzania in the District of Kahama in the Region of Shinyanga. The property is 6 km Sou
May 1, 2009
-
The Operation of a 30kt/A Copper L-Sx-Ew Plantproject in the DR CongoBy Wei Wang
The SMCO copper plant is located in DR Congo, and was designed by China NERIN Engineering Co., Ltd. The process is a typical hydrometallurgical plant with Leach-SX-EW, with the project treating the ox
Jan 1, 2014
-
Minerals Liberation Management of Lead-Zinc Flotation OreBy N. Valkanov
This paper presents results of an investigation into the connection between minerals liberation management and flotation, responding to lead-zinc concentrator ?Erma reka?, in Bulgaria. Monitoring of a
Aug 1, 2013
-
Forming a View of the Rock Mass Strength of Hawkesbury Sandstone from Tunnelling Case Histories"This paper presents results of ongoing research being carried out at the University of New South Wales into improved methods for estimating rock mass strength. In this paper the rock mass strength of
Jan 1, 2015
-
Attenuation measurements of ear muffs at Falconbridge Limited, Canadian Nickel Division, Sudbury Operations, 1984By K. J. K. Weglo, M. U. Savich
"At the Falconbridge Limited, Canadian Nickel Division, Sudbury Operations, we investigated the ""NO NOISE"" ear muffs model NN3-F which is a Swedish product with foam-filled sealing rings (the Hellbe
Jan 1, 1986
-
Copper Canyon porphyry copper-gold deposit, Galore Creek area, northwestern British ColumbiaBy L. R. Bottomer, G. M. Leary
"The Copper Canyon property is located in the Galore Creek area of northwestern British Columbia. Porphyry copper-gold mineralization on the property is notable for its high gold content and close spa
Jan 1, 1995
-
Adaptation of Mining Methods for Low- and Micro-gravity Environments: Part 1By Leslie Gertsch
Outline First progress report ? ?Introduction ?Non-terrestrial mining ?Near-term targets ?Stages of mining ?Study procedure Capabilities needed for non-terrestrial mining ?Mining methods ?M
May 1, 2013
-
Lac Otelnuk Iron Project Nunavik, QuébecBy Frank Condon
?Location ?Background ?Drilling Program ?Mineral Resources ?Geology ?Economic Assessment ?Strategic Partner ?Located in Nunavik, Québec ?160 km northwest of Schefferville ?240 km south of K
May 1, 2011
-
Experimental and Numerical Analysis to Determine the Transition from Mode-I to Mode-II FractureBy Rakesh Kumar, Rajabrahma K., A. K. Verma, V. Mukesh
"In this study, laboratory investigation as well as numerical investigation is carried out to ascertain the transition from one mode to another for Semi-circular bend setup. Laboratory investigation i
Jan 1, 2015