Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Demand for Rare Earth Materials in Permanent Magnets

    By S. Constantinides

    "A major use for many of the rare earths is in permanent magnets. While alternate technologies are in research or already exist, rare earth magnets are unlikely to be supplanted as a major input to cl

    Jan 1, 2012

  • CIM
    Bench Scale X-Ray Fluorescence Sorting of Low Grade Copper Ores

    By Tugba Cebeci, Bahjat Khoshaba, Bern Klein, Libin Tong, Andrew Bamber

    "Sensor-based sorting technologies have potential to pre-concentrate low grade subeconomic ores through discarding the barren waste particles. However, the inability of sensors to accurately discrimin

    Jan 1, 2016

  • CIM
    Athabasca Basin Proterozoic Unconformity Uranium Deposits: Alteration, Deposit Geometry And Lithostructural Setting

    By A. Aubin, H. Yang, G. Zaluski

    The Athabasca Basin of northern Saskatchewan and Alberta is an exceptionally rich metallogenic region, hosting more than 2.8 B lb U3O8, of which over 927 M lb U3O8 have been mined out since extraction

    Jan 1, 2020

  • CIM
    Design of Packed Rock Bed Thermal Storage to Reduce Ventilation Heating and Cooling Demands in Underground Mines

    By A. Romero

    "Most underground mines require heating or cooling systems to meet health and safety standards in the working areas. In regions where daily or seasonal fluctuations of environmental conditions exist,

    Jan 1, 2019

  • CIM
    Evolution in Rare Earthmaterial Science, Production, and Resource Development: Themountain Pass Paradigm

    By J. T. Sims, C. E. Karayannopoulos

    Today's rare earth industry is undergoing significant and rapid evolutionary change toward greater reliability and diversity of supply, increased security of supply chains, and better price forec

    Jan 1, 2014

  • CIM
    Distribution and Solubility of Platinum Group Metals in Slags

    By K. Yamaguchi

    "This Precious metals content copper scrap is treated with a copper smelting process, and copper and precious metals are recovered. The precious metal lost in the slag is increasing with increasing of

    Jan 1, 2012

  • CIM
    Discussion of Some Fundamental Issues of Flac3D in Research of Dynamic Response of Rock Slope

    By S. F. Guo, Z. F. Zhan, X. L. Huang, Y. Zou, S. W. Qi

    "FLAC3D is an important numerical analysis software to study dynamic response of rock slope. In application of the program, the common issues such as absorbing boundary and the method to apply wave ha

    Jan 1, 2015

  • CIM
    Potash Discoveries in Western Canada

    By L. Heber Cole

    Introductory During the past few years, salt (sodium chloride) strata have been encountered in western Canada in a number of wells, while prospecting for oil and gas. The ever increasing number

    Jan 1, 1948

  • CIM
    Minor Element Tolerance and Control in Copper Smelting

    By A. E. Wraith, R. Harris, J. Qiu, R. Parra

    Small pilot scale experiments have shown that it is possible to almost fully eliminate the minor elements (ME), namely As, Sb, Bi and Pb contained in smelter dusts by vacuum calcination of mixtures of

    Jan 1, 2007

  • CIM
    The Future is Open - On-Equipment Computing at Teck

    By Peter Cunningham

    Teck Facts and Figures ? Employ more than 14,000 around the world, includes: ? Over 8,600 in Canada (close to 7,800 in British Columbia) ? Close to 2,000 in Chile ? Over 2,700 in Peru ? Approxima

    Aug 1, 2013

  • CIM
    The Adsorption of Dehydroabietylamine Acetate on Mineral Oxides

    By G. W. Smith

    "The adsorption of dehydroabietylamine acetate on quartz, hematite, rutile and baddeleyite has been deter-mined for concentrations ranging from 0.3 to 5,600 µ. moles/I and for pH values ranging from 2

    Jan 1, 1971

  • CIM
    The Tanco Pegmatite, Southeastern Manitoba

    By R. A. Crouse

    The Tanco pegmatite at Bernie Lake, in the Lac du Bonnet mining district of southeastern Manitoba, is a unique deposit of Li, Rb, Cs and Ta, with substantial reserves of Be and several industrial mine

    Jan 1, 1979

  • CIM
    Ore Dressing at Scully Mine

    By A. M. McKim, J. S. Ambler

    "The iron ore of the Scully Mine is upgraded from 36 per cent Fe to 66 per cent Fe through single-stage crushing, wet autogenous milling, sizing by vibrating screens and two-stage spiral separation, f

    Jan 1, 1969

  • CIM
    Mineral resource + engineering, economic and legal feasibility = ore reserve

    By M. Vallée

    Several reviews of mineral project performance in the past 35 years indicate a pattern of occasional, but recurrent, mining project failures due to shortcomings in geological information and estimatio

    Jan 1, 2000

  • CIM
    Gold Catalysts Prepared via Intermetallic Precursor

    By Elma van der Lingen

    Gold is considered the most inert of all metallic elements, but the metal can show catalytic activity when prepared by specific techniques. Preparation techniques being used to prepare gold catalysts

    Oct 1, 2003

  • CIM
    Gravity Gold Concentration at Newmont Mining

    The process of gold recovery by gravity concentration is incorporated in the metal recovery flowsheet at seven Newmont Mining Corporation owned mining operations in Australia, North America and Africa

    Jan 1, 2011

  • CIM
    1977 Federal Budget ? ?The Balancing Act?

    By R. D. Brown

    In his March 31, 1977 budget, Finance Minister Macdonald has attempted the delicate balancing act of stimulating the economy without reinforcing the inflationary pressures which Canada is continuing t

    Jan 1, 1977

  • CIM
    The Donalda gold deposit, Rouyn-Noranda, Quebec

    By Gérald Riverin, Bernard Boily, Daniel Bernard

    "The Donalda gold deposit is located in the southern part of the Noranda camp, approximately 2 /em east of the Horne deposit. Combined past production and current reserves total over 1.5 Mt grading 6.

    Jan 1, 1990

  • CIM
    The Optimization Journey Of The Harmony Gold’s South Uranium Plant Operation And The Uranium Contribution To The Gold Operation As A By-product

    By R. Jacobs, R. E. L. Pobe

    The Moab Khotsong Metallurgical Complex comprises a gold recovery circuit (Noligwa Gold Plant) and a uranium recovery circuit (South Uranium Plant). The metallurgical complex employs the reverse leach

    Jan 1, 2020

  • CIM
    Environmental management at Namew Lake

    By w. w. Fraser

    "In late 1985, Hudson Bay Mining and Smelting Co., Limited announced the Namew Mine/Mill project. Environmental baseline monitoring and planning began in early 1985 while a major drilling program was

    Jan 1, 1991