    Computer Control of Flotation at Mattagami Lake Mines

    By D. W. Hendriks, C. Daoust, K. V. Konigsmann

    "The concentrator of Mattagami Lake Mines Limited commenced operation in 1963. It had been designed with instrumentation proven at that time. New control techniques were added in subsequent years.An o

    Jan 1, 1976

  • CIM
    The Use of Aurix®100 Resin for the Selective Recovery of Gold and Silver from Copper, Gold and Silver Solutions

    By Tim Hughes, A. H. (Sandy) Gray, Jennifer Abols

    "The selective recovery of gold and silver from solutions containing other metals such as copper is possible using AuRIX®100 resin in conjunction with the Gekko Resin Column. Selectivity is driven by

    Jan 1, 2006

  • CIM
    Freeport McMoran El Paso Refinery Steam Control

    By Bradford C. Wesstrom, Ricardo Parra

    The Freeport McMoRan El Paso Refinery uses co-generation to produce some of its electricity and all of its steam. This paper will cover the operation of the co-generation plant natural gas turbine at

    Jan 1, 2019

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    The Impact of Grinding Chemistry on Galena Flotation at Rosh Pinah Zinc Corporation, Namibia

    By Marco Lombard, Paulus Kapolo, Christopher J. Greet

    "The conversion of a concentrator from one grinding media type to another is a major undertaking in terms of both financial and technical risk. So, a strategy of completing sufficient laboratory and f

    Jan 1, 2013

  • CIM
    Lead Circuit Flotation at the Red Dog Mine

    By M. J. Fairweather, Keith Lee, Naseem Mian

    "The initial metallurgical response of the lead flotation circuit at Cominco Alaska's Red Dog Mine was substantially below feasibility expectations. A program of diagnostic mineralogical analysis poin

    Jan 1, 1997

  • CIM
    American Barrick Goldstrike Operation in Elko Nevada - A Summary of the Operation and Future Expansions

    By R. H. Colquhoun, A. W. Bolland, H. J. H. Pieterse

    "American Barrick Resources Corporation acquired the goldstrike property in north eastern Nevada in early 1987. Since that time, the company has undertaken an extensive development program. This paper

    Jan 1, 1992

  • CIM
    The Paracatu Expansion Project III ? Building the Largest Gold Concentrator of the World

    By Luis A. Tondo

    The Paracatu Expansion Project III in Brazil was implemented between 2006 and 2008 to increase the existing capacity from 20 to 61 Million tons per year of gold ore treatment. This expansion led the B

    May 1, 2009

  • CIM
    A Simple Method to Estimate Tensile Strength and Hoek-Brown Strength Parameter mi of Brittle Rocks

    By M. Cai

    A practical simple method is proposed to estimate the tensile strength (st) of strong brittle rocks from the strength ratio of R= sc/st = 8 sc/sci, where sc is the uniaxial compressive strength and sc

    May 1, 2009

  • CIM
    Circuit Consolidation at Pine Point Mines Limited Pine Point, N.W.T.

    By R. E. Jones

    "INTRODUCTIONCominco Limited, one of the free world's largest producers of lead and zinc having majority ownership in Pine Point Mines Ltd., operates a mining and concentrating complex on the south sh

    Jan 1, 1982

  • CIM
    Gold Gravity Recovery in Copper Circuits at BHP Tintaya

    By Valentin Choquenaha Bombilla, Oscar Alvarez Muiloz

    "Tintaya’s basic production line is copper concentrate, which has an important gold content. The process used is flotation; the objective of the metallurgical department is to obtain the best results

    Jan 1, 2002

  • CIM
    Introduction to technology transfer - Universities to industry

    By John C. McKay

    "The five papers which follow, under the heading of ""Technology Transfer-Universities to Industry"", were originally presented at the 20th Annual CIM Conference of Metallurgists in Hamilton, Ontario.

    Jan 1, 1982

  • CIM
    The Use of Enhanced Gravity Concentration for Precious Metal Recovery

    By Steve McAlister, Colin Sprake

    "Enhanced gravity concentration machines have been applied successfully in the following areas of precious metal recovery flowsheets:1. Primary Grinding Circuits2. Shaking Table Tailings3. Pre-Concent

    Jan 1, 2003

  • CIM
    Experiences in the Installation and Commissioning of Semi-Autogenous Grinding Circuits

    By M. J. Allan

    "The paper describes the author's experiences in the startup of autogenous and semiautogenous grinding circuits gained over the last twenty years on both large and small grinding circuits. Typical pha

    Jan 1, 1992

  • CIM
    Aeration in Plant Practice

    By K. V. Konigsmann

    "The results of Mr. Klymowsky's research confirm the essential role played by oxidation products in the flotation of base metal sulphides. They invite a discussion on the subject of aeration which I m

    Jan 1, 1973

  • CIM
    Grinding Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of an SABC grinding circuit using CEET technology applied to grindability data produced from testing 100 samples and distributed across the blocks of a mine plan using

    Jan 1, 2007

  • CIM
    Evaluation of Environmentally Friendly Collectors for Xanthate Replacement

    By J. Dong

    "Xanthate is a sulfide collector that has been widely used in flotation for almost a century. It is inexpensive, easy to synthesize and apply, and produces good metallurgy in the right applications. H

    Jan 1, 2011

  • CIM
    Design and Development of an LHD for Narrow-Reef Mining

    By Patrick F. R. Murphy

    The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a

    May 1, 2003

  • CIM
    The Sizing and Operation of Crushing and Screening Plants

    By R. E. Jones

    "Crusher sizing and application in mining operations is the selection of a crusher or a series of crushers to reduce run of mine ore to a size suitable for either autogenous or conventional grinding.

    Jan 1, 1974

  • CIM
    A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves

    By D. Hatfield

    "Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting

    Jan 1, 2013