Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Red Dog VIP mill optimization project. Part B: An integrated approach to modelling and design of the flotation plant

    By B. K. Gorain, A. W. Stradling

    "The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h

    Jan 1, 2003

  • CIM
    LKAB Green Pellets

    By F. Lindroos

    A cornerstone in the LKAB Green Pellet concept is to produce pellets with a small footprint in terms of energy con-sumption, CO2 emission and emission of other elements harmful to the environment, lik

    May 1, 2011

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    The Effect of Lump Ablation on Pressure Gradient in Oil Sand Hydrotransport Pipelines

    By D. Wolfe, K. Reid, T. Nunn

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. In order to minimize front-end rejects, and to allow for high throug

    Jan 1, 2014

  • CIM
    Improving Mining & Minerals Plant Performance ? Operations and Maintenance Working Together using new Information Technology

    By Gregory A. Johnson

    Operations and Maintenance departments have long had an adversarial relationship. The widespread evolution and adoption of modern management techniques such as Reliability Centered Maintenance (RCM) a

    Feb 1, 2008

  • CIM
    Rock Mechanics Aspects of the Use of Underhand Cut-and-Fill Paste Sill Pillars: Case Studies

    By Paul Hughes

    This paper summarizes current underhand paste backfill mining as applied to Goldcorp Inc?s Red Lake Mine, Newcrest Mining Ltd?s Kencana Mine and the Lanfranchi Nickel Mine as well as ongoing research

    May 1, 2011

  • CIM
    A Techno-Economic Assessment of the Coal Gold Agglomeration Gold Recovery Process

    By I. G. Townsend, S. A. Buckley, C. I. House

    "SummaryBritish Petroleum plc is developing a new gold recovery process known as coal gold agglomeration (CGA) for the recovery of gold from its ores. Liberated gold grains are recovered with high eff

    Jan 1, 1989

  • CIM
    Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill Optimization

    By Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby

    "Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel

    Jan 1, 2004

  • CIM
    The Importance of Efficient Mass Flow Balance in Crushing and Screening Plants

    By Fernando Romero Lage

    The purpose of this paper is to analyze detailed crushing and screening configurations and the interrelationship as they relate to mass flow balance, operating efficiency, plant availability and final

    May 1, 2010

  • CIM
    The Application of the Stackcell Technology for Fine Coal Recovery

    By E. S. Yan, R. Graley

    "The StackCell was developed to overcome the engineering and design challenges that are commonly associated with existing flotation technology such as pneumatic, self-aspirating cells, mechanical cell

    Jan 1, 2013

  • CIM
    Comparison of Ore Hardness Measurements for Grinding Mill Design for the Tenke Project

    By David Meadows, John Starkey

    "As part of the ongoing project development for the Tenke Fungurume Copper-Cobalt Project in the Democratic Republic of Congo, Phelps Dodge Corporation has examined methodologies for determining the s

    Jan 1, 2007

  • CIM
    Mine ventilation fan specification and evaluation

    By J. S. Stachulak, K. A. Mackinnon

    This paper deals with specifying and evaluating fans for mine ventilation projects. Topics such as fan and equipment design life, operating points, and operating conditions are discussed. Common opera

    Jan 1, 2004

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • CIM
    Detection of Kaiser Effect in Marbles Under Tensile Stresses

    By Xie Qiang

    It is known that the stress state inside rock discs under Brazilian tests is neither simple compression nor tension, but a complex combination of both stress types, as well as for a beam subjected to

    May 1, 2009

  • CIM
    Decommissioning Pits with Ecological Engineering

    By M. Kalin

    "Ecological Engineering, a biotechnological approach to the decommissioning of base metal mining wastes, is being tested on two pits (Gloryholes) in Newfoundland, Canada. Pit #2 has an average pH of 3

    Jan 1, 1992

  • CIM
    Gravity Concentration from Bench Scale to Plant

    By R. O. Burt

    "Gravity Concentration, the oldest form of Mineral Processing, remains of major importance to the Industry. Current applications of Gravity Concentration are briefly examined.The Paper details one app

    Jan 1, 1984

  • CIM
    Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of Canada

    By Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie

    "A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im

    Jan 1, 2009

  • CIM
    Environment Driven Innovation of Hydraulic Excavators

    By Axel Doelcken

    ?? Liebherr excavators in standard configuration are generally designed to operate in an ambient temperature range between -12°C and +55°C (10.4 °F and 131°F). ?? To operate effectively and efficient

    May 1, 2008

  • CIM
    Technological Advances in Telecommunications for Mines

    By Patrick M. Y. Waye

    As mines utilise more automation in mining operations to improve efficiency and safety, a corresponding increasing demand is placed on the transport of information. Some of the recent technological ad

    May 1, 2001

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976