Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mineralogical and Microstructural Investigation of Dead-Burned Magnesite from Eastern Iran

    By Khosrow Ebrahimi

    We document the occurrence, mineralogy and firing properties of magnesite from hydrothermal deposits in the upper Cretaceous ophiolites of Eastern Iran. These deposits occur as thin veins of nearly pu

    May 1, 2004

  • CIM
    Institutional Assessment: Emerging Practice in Sustainable Community Investment

    By Roxanne Scott

    Outline ? Overview of Community Investment in the Mining Sector ? Emerging Good Practice: ?Strategic Integrated Community Investment? ? Assessing Local Context: ? Institutional Assessment ? Partn

    May 1, 2010

  • CIM
    Expert System Technology at the Polaris Mine

    By G. A. Kosick, C. A. Harris

    "Metallurgy at the Polaris Mine is approaching an impasse, with lead and zinc concentrate grades and recoveries approaching their theoretical maximums. In an effort to increase productivity, plant thr

    Jan 1, 1988

  • CIM
    Energy Efficient Grinding of Ores and Minerals with High Pressure Grinding Rolls

    "Polycom, a new approach to ore processing based on pressure comminution, is obviously a very attractive alternative to conventional processing methods.Since a full-scale pilot plant was commissioned

    Jan 1, 1991

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • CIM
    Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for Prediction

    By N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante

    "The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of

    Jan 1, 2004

  • CIM
    Flotation as Part of Grinding Classification Circuits

    By M. Tarvainen, J. Kallioinen

    "Depressed metal prices coupled with increasing production costs have presented a great challenge for operators to control and reduce the costs of production to maintain profitability. Depleting ore r

    Jan 1, 1984

  • CIM
    Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mine

    By D. Ouellet, G. Gagnon, B. Simser, V. Falmagne

    The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli

    Jan 1, 2004

  • CIM
    On The Floatability of Gold Grains

    By Stephen L. Chryssoulis, Daniela Venter, Stamen Dimov

    "Comparative surface analysis of floated and rejected free gold grains from a number of full scale benefication plants and from pilot plant testwork, has shown silver (the most common impurity in gold

    Jan 1, 2003

  • CIM
    Island Copper Mine Milling for Copper and Molybdenum

    By Chris Brown

    "The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil

    Jan 1, 1975

  • CIM
    The Texasgulf Concentrator Expansion

    By A. M. Hill

    "This is an account of the expansion of Texasgulf's Timmins concentrator by the building of a fourth circuit.The original capacity of the mine and concentrator was 3.6 million tons per year of ore. In

    Jan 1, 1979

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • CIM
    Mineralogical Evaluation of Au-Sb-As Mineralization from the ADMW Zones, Clarence Stream Property, New Brunswick

    By Louis J. Cabri, Donald Hoy

    "Samples with contrasting gold mineralization were studied quantitatively prior to metallurgical tests. The AD samples are coarser-grained and characterized by abundant Sb minerals (jamesonite, berthi

    Jan 1, 2007

  • CIM
    Leaching Concentrates without Leaching Iron

    By M. Maccagni, J. Nielsen

    "Engitec developed the EZINEX® Technology some years ago to recover zinc from oxidized secondary sources. This process works at neutral pH and can take into solution any kind of metal, but iron is re

    Jan 1, 2016

  • CIM
    Stacking of Potash Mill Tailings (a53a3fa3-c9c5-495d-81ff-6d030f92ec59)

    By P. G. Roden, G. A. Maki, P. J. Fullmann

    "In October 1984, Rocanville Division began using a stacking system to handle potash mill tailings. Previous to this date, mill tailings were slurried to the top of the tailings pile and allowed to de

    Jan 1, 1986

  • CIM
    A Novel Approach to Recover Precious Values from Low-Grade Canadian Ores

    By V. I. Lakshmanan, D. A. Mackie

    "1. INTRODUCTIONIn the past two decades, low-grade gold and silver ore bodies in the United States have been exploited by heap leaching, primarily with sodium cyanide solutions. This method has proven

    Jan 1, 1989

  • CIM
    Early Age Development of Cemented Paste Backfill

    By D. Simon

    This paper studies the effect of binder type and content on the early age development of cemented paste backfill (CPB). The early age development of the mixtures is analyzed using scanning electron mi

    May 1, 2007

  • CIM
    Principal Components Analysis of ToF-SIMS Data: Application to Mineral Recognition, Surface Reaction and Separation by Flotation

    By Brian Hart, Roger St. C. Smart, James Francis, Mark Biesinger

    "There are a number of challenges involved with the surface analyses of different mineral phases from process streams in a flotation facility. The first of course is to collect samples that are repres

    Jan 1, 2007

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Expansion of the Crushing and Milling Facilities of Dome Mines Limited, South Porcupine Ontario

    By R. H. Coloquhoun

    "INTRODUCTIONDome Mines Limited is located on 3,149 acres in Tisdale, Whitney and Shaw Townships in the City of Timmins in Northern Ontario. The mine and mill facilities are two miles from the town of

    Jan 1, 1984