    Convergent Bitumen Recovery

    By Lee Nichols

    Convergent Bitumen Recovery Context of discussion It should be noted that the CBR process is a conceptual bitumen recovery feed methodology, designed to provide supplemental bitumen to the oil sand

    May 1, 2007

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i

    Jan 1, 2016

  • CIM
    Suitability of PEM Fuelcells for Underground Mining Vehicles

    By Marc C. Bétournay

    Hydrogen fuelcells are a known technology, having been applied to stationary (e.g equipment, buildings, power plants) and vehicle applications (e.g transit buses, space shuttles). There is currently a

    May 1, 2003

  • CIM
    Portraying Geological Structure of Canadian Coalfields

    By B. R. MacKay

    Introduction Of all Canada's mineral resources, its coal deposits have probably received the most continued attention by the Geological Survey since its inception ninety years ago. A casual revi

    Jan 1, 1932

  • CIM
    Mining of the Ming Orebody by the Consolidated Rambler Mines Limited

    By H. Sahay

    This paper summarizes the history and ore-grade statistics of mining the Ming orebody, and then details the mining methods. Included are raising, stoping, drilling and blasting techniques. Particular

    Jan 1, 1979

  • CIM
    Decision Support Programs

    By Hamid Butt

    Information Technology ??Advanced Information Technology is dramatically changing information flow within organizations. This enables employees to have information at their fingertips to make informe

    May 1, 2006

  • CIM
    Gold Passivation: Some Fundamental Issues to Highlight

    By A. Azizi, P. Blatter, A. Bouajila

    "Due to the high reactivity of sulfide minerals in alkaline cyanide solutions, some parasitic reactions inflict a heavy gold surface passivation and excess cyanide consumption resulting in a dramatic

    Jan 1, 2012

  • CIM
    Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance Techniques

    By S. Makni, A. Faucher, F. Robichaud, A. Bouajila

    "Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge

    Jan 1, 2012

  • CIM
    Ground Control Aspects of Mining Deep Remnant Panels at Falconbridge Lockerby Mine ? A Case Study

    By J. Ran

    There are challenges in mining deep tabular ore deposits using the open stoping method, particularly mining remnant panels towards the end of mine life. The remnant panels have experienced stress conc

    Apr 1, 2005

  • CIM
    Social indicators for mining in Ancash, Peru: combining community objectives, technical considerations and community relations insight to design a practical framework.

    By Carol J. Odell

    As a mining social practitioner, social indicators are within the purview of required competencies. A situation, where the ER manager requested assistance in quickly deriving a few social indicators f

    May 1, 2010

  • CIM
    Goldcorp Inc., Red Lake Mine Design and Commissioning

    By R. Tyreman, G. Ritson

    "The Red Lake Mine is situated in Balmer Township, Red Lake area in northwestern Ontario. It is an underground mine that has been in production since 1948. The property was originally known as the Dic

    Jan 1, 2001

  • CIM
    Selective Highwall Mining at the Dome Open Pit Mine

    By J. G. Henning

    Following completion of planned mining operations at the Goldcorp Dome Open Pit Mine, a high-grade Shaft Pillar located in the pit highwall was recovered. Mining of this Shaft pillar faced numerous ro

    May 1, 2009

  • CIM
    Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest Queensland

    By Patrick J. Williams, Peter J. Pollard

    "Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a

    Jan 1, 2001

  • CIM
    Dense Medium Separation and its Importance to Canada’s Diamond Mining Industry

    By Dave Price

    "Canada is scheduled to become the 4th highest diamond revenue producing country in the world by year 2004 with the already operating Ekati Mine and the anticipated operation of the Jericho Mine in 20

    Jan 1, 2000

  • CIM
    On-Site Daily Mineralogy - SIDMIN Program

    By Fuzail Siddiqui

    "The SIDMIN program aims at filling the mineral processor’s need to know the deportment of ‘minerals of interest’ not just ‘elements of interest’ that pass through the processing plants. Generally, ch

    Jan 1, 2000

  • CIM
    The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)

    By C. R. Edwards

    "The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U

    Jan 1, 2002

  • CIM
    On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’

    By Phillip Cancilla, Daniel Roy, Frank Rosenblum

    "The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti

    Jan 1, 2001

  • CIM
    Notes on Fire Prevention and Fire Insurance for Mine Buildings

    By W. G. Millar

    Until a fire occurs, insurance and prevention work are often looked on as unavoidable necessities, but as insurance is back of all business credit, it is essential to know that in case of damage money

    Jan 1, 1928

  • CIM
    The Onça Puma Nickel Project

    By Ruy L. Rodrigues

    Vale is in the early stages of commissioning its Onça Puma nickel operations. The project is meant for the production of 58,000 tpa of nickel contained in ferro-nickel, substantially contributing to t

    May 1, 2010

  • CIM
    On-Line Flotation Simulator at Pyhäsalmi Mine

    By K. Zenger, J. Kaartinen, J. Huuskonen, S. Torttila, S. Lähteenmäki, J. Pietilä

    "Pyhäsalmi Mine in Finland has a long history of continuous process development. The concentrator processes Cu-Zn-sulphide ore with high recoveries. An on-line flotation simulator has been developed t

    Jan 1, 2015