Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Copula-Based Spatial Modelling of Geometallurgical Variables

    By G N. Musafer, M H. Thompson, R C. Wolff, E Kozan

    The most important aspect of modelling a geological variable, such as metal grade, is the spatial correlation. Spatial correlation describes the relationship between realisations of a geological varia

    Sep 29, 2013

  • AUSIMM
    Pike River Coal - Project Management Challenges

    The Pike River Coalfield is located on the West Coast of the South Island of New Zealand near the top of the Paparoa Range approximately 45 km north east of the coastal town of Greymouth. The Pike Riv

    Jan 1, 2005

  • AUSIMM
    Development of the Sao Chico Gold Project, Brazil - ABSTRACT ONLY

    The Sao Chico gold project is located on the Tocantinzinho trend which is the most mineralised zone in the Tapajos Mineral Field of Brazil (see Figure 1). The Tapajos goldfi eld was the site of the bi

    Aug 1, 2010

  • AUSIMM
    Putting Geology and Engineering Back into Resource/Reserve Determination

    By M Darvall And R Fare, D Dormer

    The Argo Archaean lode gold deposit is hosted within a structurally complex shear zone system, 70 km south of Kalgoorlie, and 3 km west of the crustal-scale Boulder û Lefroy Fault. Argo is an active u

    Jan 1, 2006

  • AUSIMM
    Geology and Ore Estimation at the Callie Underground Gold Mine, Tanami, NT

    By J Emslie

    Newmont AustraliaÆs Callie Underground Gold Mine is located on the Dead Bullock Soak Mining Lease, approximately 600 km NW of Alice Springs, NT, in the Granites-Tanami Goldfield. Dead Bullock Soak is

    Jan 1, 2003

  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014

  • AUSIMM
    Origin of Sedimentary Rock-Hosted Gold Mineralisation at Kyaukpahto, Kawlin-Wuntho District, Northern Myanmar

    The Kyaukpahto gold deposit is located at latitude 23¦ 47Æ 55" N and longitude 95¦ 56Æ 35" E in the Kawlin-Wuntho district, Sagaing Division, Myanmar. Gold mineralisation is hosted in sandstone of the

    Jan 1, 2008

  • AUSIMM
    The Bunyip Lateritic Nickel-Cobalt Deposit, Cawse Nickel-Cobalt Operations, Kalgoorlie, Western Australia

    By S M. Denn

    The Cawse nickel-cobalt operation is situated 50 km NW of Kalgoorlie in Western Australia, at latitude30o22'30'' south and longitude 121o08'30'' east on the Kalgoorlie 1:

    Jan 1, 2000

  • AUSIMM
    A Methodology for Measuring the Floatability of Ores û The Floatability Index Test

    By D A. Collins

    The floatability methodology developed by the AMIRA P9 project through research contributions by the Julius Kruttschnitt Minerals Research Centre (JKMRC, Brisbane, Australia), University of Cape Town

    Jan 1, 2008

  • AUSIMM
    Improved recoveries and environmental outcomes from complex ores utilising EcoTechnology

    By M Noakes

    EcoTechnology refers to a series of potential metallurgical processes for complex ores, concentrates, tailings and slags that are all based on an initial chlorination step at low to moderate temperatu

    Nov 21, 2018

  • AUSIMM
    Diesel Vehicle Research at BHP Collieries

    By Davies B, Rogers A, Grainger A, Todd J, Brenman R, Jones L, Horton B, Eager L

    Research into the control of diesel particulates (DP) has been. conducted by BHP Coal for more than 7 years. Personal monitoring of employee exposures (n = 480 full shift samples) conducted at nine un

    Jan 1, 1998

  • AUSIMM
    Current Studies of Practical Rock Mechanics in Underground Mining in Australia

    By K J ROSENGREN

    Underground rock mechanics was initiated as a formal discipline in Australia by early studies for underground structures for the Snowy Mountains Scheme in the 1950s. These techniques were quickly e

    Jan 1, 1992

  • AUSIMM
    Textural Evaluation of Nickel Sulphide Gossans

    By Travis G. A

    The Mons Cupri Cu-Pb-Zn deposit is situated within a complex Archaean volcanic sequence dominated by rhyolitic fragmental rocks. This sequence is underlain by a 150 m group of rhyolitic ash flow t

    Jan 1, 1973

  • AUSIMM
    Is Zero Discharge a Viable or Useful Concept in Mine Water Management?

    By S Vink, A Wolhuter

    Increasingly the community and government regulators are calling for æzero dischargeÆ mines. Some mining companies are beginning to explore ways in which they can transition to zero discharge. When st

    Nov 26, 2013

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • AUSIMM
    The Application of Air to the Working Face in Coal Mines

    By Hayes J. A

    The satisfactory ventilation of an extensive coal mine is a subject which requires continual attention from all concerned.It must be remembered that a colliery contains many miles of workings, extendi

    Jan 1, 1947

  • AUSIMM
    Practical and Strategic Technology Choices for Advanced Mining

    By I Gipps

    The mining industry has come through a period of major change in community expectations regarding safety and environmental impact and these changes can be expected to continue in the future. These cha

    Jan 1, 2003

  • AUSIMM
    Processing carbonate hosted zinc-lead ores

    By R Shaw

    There are many small to medium carbonate hosted complex zinc containing deposits where the zinc is not economically recoverable either as concentrate or metal. High grade (>20% Zn) run of mine ore

    Nov 21, 2018

  • AUSIMM
    Zooming Out – Learning to See Rehabilitation through Stakeholders’ Eyes

    By J L. Merritt

    The mining industry seeks to engage with and respond to stakeholders through open consultation processes during the various phases of a mining project (Department of Industry, Tourism and Resources, 2

    Jun 28, 2016

  • AUSIMM
    Mineral Processing Beyond 2000- Education for New Technology

    The demand for minerals will grow strongly to satisfy the needs of an increasing world population for materials and energy. The technical problems involved in producing these minerals will be daunti

    Jan 1, 1993