Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Megablasts – Enabling Technologies in BHP Billiton Iron OreBy B Green
With a focus on safe productive tonnes, there has been an ongoing drive to increase the productivity of the mining fleet across BHP Billiton. In response, a team from the Iron Ore business was formed
Aug 24, 2015
-
Selection Sizing and Developing the Optimum Gravity Gold Circuit for Your ProjectGravity gold recovery has been practiced for thousands of years, making it one of the oldest forms of mineral processing. Gold is 19 times heavier than water although the barren rock is generally only
Aug 1, 2010
-
From Mt Goldsworthy to Area C ù Reflections on Forty Years of Iron Ore Exploration in the PilbaraBy D A. Kepert, I J. Tehnas, M A. Pudovsk
BHP Billiton (BHPB) was the first company to start iron ore mining in the Pilbara at Mt Goldsworthy in 1966 through Goldsworthy Mining Limited (GML - then Consolidated Goldfields Australia, Cyprus Min
Jan 1, 2002
-
Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?By R Jacobs
"The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile
Mar 8, 2016
-
Mid Sampling and Reserve Estimation Practice in the Base Metal OrebodiesThe Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr
Jan 1, 1987
-
A Logical Approach to Determination of Density and Porosity Values for Iron Ore DepositsThe importance of the accurate determination and interpretation of the bulk density and porosity of a given iron ore deposit is very often disregarded or neglected. Large amounts of time and money are
Jan 1, 2007
-
From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining visionBy A Maier, M Goldner, C Gimber
Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t
Aug 2, 2023
-
Computational Modelling Studies of Ventilation Management for Underground In-seam Drilling SitesBy F Hungerford, T Ren
"Gas management has always been a major concern for the ventilation officer of any gassy mine. With an increase of mining depth and gas content, there is a great demand for the development of in-seam
Aug 31, 2015
-
Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western AustraliaThe Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located
Jan 1, 2006
-
Will Your Mine Require Cooling?By A S. Derrington
In some parts of Australia, mine air cooling may not be needed until a depth of 1300 m below surface is reached. In other locations, it may be essential at a depth of only 300 m below surface. The rea
Mar 24, 2014
-
Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 MagnitudeBy R McIlwraith, B Breul
Two case studies are presented in this paper. The first one discusses a roller compacted concrete water supply dam that was constructed in El Mauro in Chile to provide water for agriculture activities
Jul 27, 2015
-
Discrete Fracture Network Modelling – Importance of Accounting for Data Uncertainty and VariabilityBy S Rogers, D Stead, E Eberhardt
The last decade has seen a major increase in use of the discrete fracture network (DFN) approach applied to cave mining problems, often integrated within more complex geomechanical simulations. Becaus
May 9, 2016
-
Selection Criteria for Open Pit Production Equipment û Payload Distributions and the æ10/10/20Æ PolicyBy R J. Hardy
The aim of this study is to examine the volumetric and mass movement characteristics of load and haul operations using statistical modelling of relatively large samples of bucket loads that are transp
Sep 26, 2011
-
Controlling Stope Ring Relief in Multi-Level Mass BlastingBy Q Liu
Open stoping is one of the widely adopted methods in underground bulk mining. In this method, fanned or parallel holes are often drilled from a top sill down to a sublevel in the ore zone and blasted
Jan 1, 2005
-
Ground Support Selection and Performance Considerations in Seismically Active MinesThis paper presents a rationale for selecting appropriate support elements which combine to form a support system to maintain stability in mines subjected to both strainburst and the shaking that occu
Nov 25, 2010
-
An Integrated Approach to Optimising All Concentrator Products, Including TailingsBy A Riles
"Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o
Jun 15, 2016
-
Recovery of Gold from Gravity Tailings by FlotationThe purpose of this study was to investigate the effectiveness of froth fl otation for the recovery of gold from the gravity tailing stream of the former Lihir Gold Limited (LGL) operation in Ballarat
Aug 1, 2010
-
Recent Development in Solution Purification at Outokumpu Zinc Plant, KokkolaBy JSrvinen A, Yll÷ E
At Cominco's Zinc Refinery at Trail, British Columbia impurities are removed from zinc sulphate electrolyte by a two-stage purification process using zinc dust. Copper, cadmium and thallium are
Jan 1, 1993
-
R<sub>70</sub> Relationships and Their Interpretation at a Mine SiteBy I Jabou, D G. Blazak, L C. S Hogarth
The R70 test is a good indicator of coal reactivity to oxygen and is commonly used to provide a rating of propensity for self-heating. Tests performed by The University of Queensland Spontaneous Combu
Jan 1, 2005
-
Optimising Underground Mining StrategiesBy A M. Ebbels
"Underground mine scheduling decision-making has been based on production requirements, equipment productivities and the mine planner’s instincts on the best scheduling strategy for the mine to optimi
Mar 8, 2016