Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improvement of the grade control procedure in open pit mine, at the Oyu Tolgoi copper-gold deposits, Southern Mongolia

    By O Otgonbayar, B Bayarmaa, D Batbyamba, S Amar-Amgalan, K H. Natsagdorj, J Nomin-Erdene, B Boldkhuu, T S. Sainzaya

    The Argyle deposit in the Kimberley region of Western Australia was the world’s largest accumulation of natural diamonds. Following its discovery in 1979, the mining of associated alluvial diamonds co

    Mar 22, 2022

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • AUSIMM
    Mining Reconciliation in Long Hole Open Stopes at George Fisher Mine

    By J J. Grobler

    The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified

    Mar 21, 2011

  • AUSIMM
    Development, Simulation, Economic and Environmental Evaluation of a Coal Processing Flow Sheet

    By J Tien, J Huang, N Haque, M O’Brien

    Coal preparation is an integral part of producing coal for thermal powerplants and metallurgical processing plants. Coal processing plants use various unit processes to separate gangue and ash content

    Jun 28, 2016

  • AUSIMM
    Building and Maintaining Effective Project Teams

    By J A. Wells, K G. Thomas, R F. Dewhirst

    "One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.

    Mar 8, 2016

  • AUSIMM
    The Cannington Deposit

    By Thomas MJ

    The Cannington silver-lead-zinc deposit is located at latitude 21¦ 52' 9" South, longitude 140¦ 55' 10"" East, on the south-eastern margin of the Proterozoic Mount Isa Block (Figure 1), 135

    Jan 1, 1993

  • AUSIMM
    Haul Truck Maintenance Procedures at Bougainville Copper Limited

    The procedure used for Truck Maintenance is described systematically in this paper. Emphasis is given to manpower required, work facilities, daily maintenance and oil sampling procedure. Scheduled

    Jan 1, 1982

  • AUSIMM
    Fluid Inclusion Study of the Martha Gold-Silver Deposit, Waihi

    By S B. Martin, M P. Simpson, J L. Mauk

    The Martha deposit in Waihi, New Zealand, is a giant adularia-sericite epithermal gold-silver deposit that formed 6.0 to 6.1 Ma, and has produced over 6.4 Moz gold and 39.9 Moz. Fluid inclusion analys

    Jan 1, 2007

  • AUSIMM
    Management of dilution and mining recovery to maximise value

    By R Urie

    Dilution and loss of ore during the mining process invariably occur in all underground mining operations. This dilution and ore loss can have a significant effect on the performance and value generate

    Mar 29, 2023

  • AUSIMM
    Effects of Open Fire on Ventilation in Coal Mines

    By S K. Ray

    Open fire in a mine gallery causes large-scale damage to property and sometimes precious lives. Such fires produce two distinct effects, the throttle effect and the buoyancy effect. These effects dist

    Jan 1, 2005

  • AUSIMM
    The Partition of Sulphur and Silicon in the Iron Blast Furnace

    By Cripps-Clark CJ

    Sulphur partition between metal and slag has been examined on a cast-by-cast basis for BTIP furnaces. Partition values. were calculated from thermodynamic equilibrium data together with oxygen act

    Jan 1, 1980

  • AUSIMM
    Autonomous Haulage Systems – the Business Case

    By R Price

    "Technology has the potential to revolutionise industries, work functions or businesses. One such technology in the mining industry is the deployment of automation in a modern autonomous haulage syste

    Nov 15, 2016

  • AUSIMM
    Terratec Universal Raiseborer ù Raisebore Machine Technology

    Drilling underground can be a hazardous undertaking in many circumstances. Raiseboring and boxhole boring underground could form an integral part of the block caving production methodology and getting

    Jan 1, 2000

  • AUSIMM
    Water Supply at the Warrego Mine, Tennant Creek, Northern Territory (533fe125-f87f-451f-a8a7-f8cc9efcc262)

    By Ride G

    The provision of a water supply is a major consideration in planning mining developments particularly in remote areas. The evaluation and development of adequate water supplies in and areas of Aust

    Jan 1, 1980

  • AUSIMM
    Dust Management - Thinking Outside the Square

    Dust emissions from mining, material processing and ship loading operations (fugitive dust sources) are an environmental issue of increasing concern to both government regulators and the community. Th

    Jan 1, 2009

  • AUSIMM
    The Buka Zinc Process - A Major Step Forward in Zinc Processing?

    By C R. Fountain, R J. Sinclair

    The zinc industry is dominated by the electrolytic zinc (EZ) process. The EZ process has a low tolerance for impurities, resulting in tight concentrate specifications. Many mining companies sacrifice

    Jan 1, 1998

  • AUSIMM
    Design Developments of the Jameson Cell

    By S Bourke, R Stone, B Hill

    Since Jameson Cell flotation technology was first installed in a coal flotation application in 1988/89 at Newlands Coal Handling and Preparation Plant (CHPP) there have been fundamental improvements t

    Jan 1, 2005

  • AUSIMM
    Description of the Sulphuric Acid, Nitric Acid, and Superphosphate Plants

    THE following paragraphs represent an endeavour to describe, briefly the equipment used for the manufacture of sulphuric acid and superphosphates by the Corporation.SULPHURIC ACID PLANTS.Two separate

    Jan 1, 1918

  • AUSIMM
    Integration of the Beneficiation Process into Iron Ore Resource Utilisation

    This paper describes the technical development of the Newman beneficiation plant over its 23 years of operation and how this development relates to the mine ore reserves of high-grade and low-grade or

    Jan 1, 2002

  • AUSIMM
    Enhancing geoscience model confidence via digital twins – integrated modelling, simulation, and machine learning technologies

    By M Liang, C Putzmann, D Gokaydin

    The mining industry faces numerous challenges in swiftly evaluating and exploiting new mineral deposits to meet the escalating demand for critical minerals and metals. These challenges necessitate the

    Sep 1, 2024