Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Methods for Evaluating Explosion Resistant Ventilation Structures

    By E S. Weiss, S P. Harteis

    The Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) has conducted full-scale explosion experiments, to evaluate the strength characteristics o

    Jan 1, 2005

  • AUSIMM
    Optimisation Improvements for Narrow Vein Open Pit Deposits Using Mineable Shape Optimiser

    By C Mann, S Swapp

    "The mining industry is often challenged with the task of evaluating narrow vein open pit deposits. A realistic mineable solution from optimisation needs to accurately represent mining dilution and th

    Nov 15, 2016

  • AUSIMM
    Predictive Maintenance Using Simulation and Machine Learning

    By R Marchant, D Willingham

    "Predictive maintenance (also known as PHM or equipment ‘health monitoring’) refers to the intelligent monitoring of equipment to avoid future equipment failures. In contrast to conventional preventiv

    Oct 10, 2016

  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel Segments

    By M Wieloch, D Wimpenny, M Chappell

    Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in

    Sep 17, 2014

  • AUSIMM
    What’s Stopping You? The Role of Sheeting Material Selection in Safe Haulage Operations

    By R Thompson, D Tulloch

    "Wet-weather or 24×7 wet-trafficability is a commendable design objective for unpaved mine haul roads, but practically often difficult to achieve, due both to the road sheeting material selected, and

    Nov 15, 2016

  • AUSIMM
    An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western Australia

    By C F. Stokes

    The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)

    Aug 22, 2011

  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    Is the Python Right for Me? Python

    Gekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration of gold and sulfide ores. The Python plant has an established flow sheet including fine crushing, scr

    Aug 1, 2010

  • AUSIMM
    New Continuous Production System in Block Cave Mining – the Rock Flow System

    By M Frenzel

    At the last MassMin Conference in Sudbury, Caterpillar’s vision of a continuous mining concept for block caving operations was presented on the background of global raw material demand and its continu

    May 9, 2016

  • AUSIMM
    An assessment of the rate of construction of an upstream raised tailings dam

    By J J. Moreno, J Willis, P Garvey

    Many of the tailings storage facilities (TSFs) in Australia are upstream raised facilities for which the consolidation of the hydraulically deposited tailings is essential to the stability of the TSF.

    Jul 1, 2021

  • AUSIMM
    The Development of Small-Scale Tests to Determine Hydrometallurgical Indicies for Orebody Mapping and Domaining

    By L L. Kuhar

    The AMIRA International P843A Geometallurgical Mapping and Mine Modelling (GeMIII) project is an interdisciplinary research collaboration between 17 global mineral companies and four research organisa

    Sep 5, 2011

  • AUSIMM
    Current Situations, Problems, Countermeasures and Suggestions for ChinaÆs Metal Mine Development

    By L B. Zhou, S Li, B L. Wang, S B. Li, Q Wang

    The rapid development in ChinaÆs metal mine resources has caused a series of mine environment problems such as serious ecological damage and environment pollution, and secondary geological disasters.

    Jul 10, 2012

  • AUSIMM
    A New Tool for Extensometer Data Analysis and Improved Understanding of Geotechnical Risk Factors

    By M Szwec, P Corbett, P Sheffield

    Centennial Coal operates the Springvale and Angus Place longwall mining operations that extract coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale and Angus Place

    Nov 5, 2014

  • AUSIMM
    Transition of the Ernest Henry Mine from Open Pit to an Underground Sublevel Cave

    By J B Tucker, A T. McGrath

    Situated in north-west Queensland, Australia, the Ernest Henry Mine (EHM) has been producing copper and gold since 1996. Owned and operated by Glencore Xstrata, ore is currently sourced from a newly d

    Mar 24, 2014

  • AUSIMM
    Long hole plug – addressing the hazard of bogged rods in ‘upholes’

    By G Noonan, S Thomas, M Limbert

    Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of

    Oct 16, 2017

  • AUSIMM
    The Maragorik high sulphidation Au/Cu system, Papua New Guinea: an update

    By Hayward SB

    The Maragorik prospect is an example of high sulphidation, Cu/Au mineralisation occurring at a high level in the hydrothermal system. As extensive ash deposits blanket the region, controlled-source au

    Jan 1, 1994

  • AUSIMM
    How to Increase LHD Productivity in Hard Rock Mining

    The high maintenance of load-haul-dumps (LHDs) and front end loaders in hard rock affects mine planning with reduced availability and productivity. Intensive study of maintenance costs and availabilit

    Jan 1, 1991

  • AUSIMM
    Mineralogical Quantification of Iron Ore Sinter

    By S Hapugoda, J Manuel, E Donskoi, L Lu

    Sinter can constitute up to 80–85 per cent of the total ferrous burden in modern blast furnace ironmaking operations. The mineralogy and microstructure of iron ore sinter play an important role in det

    Jul 13, 2015