Maritime Bulk Cargo Transportable Moisture Limit Requirements for Iron Ore ShipmentsBy K Williams, M Pender, T Honeyands, T Krull, D McCallum, R Holmes, R Orense
Bulk cargoes, including iron ore fines, must be shipped according to the rules agreed by the member states of the International Maritime Organization (IMO). One critical safety measure is the transpor
Jul 13, 2015
-
Leaching Behavior of Gold in Iodide SolutionsBy Qi P. H
Gold dissolution can be achieved with a number of complexing ligands, all with varying degrees of stability. Processes based on the use of halogens have been known for many years. Beside providing t
Jan 1, 1991
-
Influence of Section Intake Dust Levels as an Exposure Assessment Parameter in Dust Exposure Level Index (DELI) ModelBy H R. Phillips
Fresh air intake in an underground coal mine is of critical importance to the occupational health and safety of workers due to the dynamic, confined and dangerous nature of the mining environment. In
Jan 1, 2005
-
Optimising Project Value and RobustnessBy W Stange, N Hanson
An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based
Jan 1, 2007
-
A New Rock Bolting Concept for Underground RoadwaysThe Skybolt is a new bolt concept, point anchored with resin in large diameter holes of specific sizes 38 mm and 45 mm. The new design achieves the optimum annular spacing required for mixing the
Jan 1, 1992
-
Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters LimitedBy T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart
Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio
Aug 29, 2018
-
Note on the Occurrence of Calaverite and Petzite in the Phantom Lode, Great Boulder Mine, KalgoorlieThe report by Baker (1958, p. 27) of krennerite in contact with gold in a specimen from the 2500 ft level, Phantom South lode, Great Boulder mine, Kalgoorlie, led the writer to look into this further,
Jan 1, 1967
-
Grade Distribution and Grade Control Procedures, Great Lady Gold Deposit, Eastern Goldfields, WAThe Great lady gold deposit presented the challenge of providing a new grade control system for an usual type of orebody in the Eastern Goldfields. Mineralisation occurs as secondary enrichment about
Jan 1, 1990
-
The use of Conditional Simulation for Drill Hole Spacing Evaluation and Decision-Making in Telégrafo Project, Northern ChileBy O Rojas
The Telégrafo copper – gold deposit is located in the Centinela district of the Antofagasta region in northern Chile. Telégrafo is a porphyry copper deposit of Eocene – Oligocene age which h
Aug 22, 2011
-
Geometallurgy at Rio Tinto Iron Ore – a New Angle on an Old ConceptBy C M. W Boyle, E K. C Phuak, A Lewan, E Ryan, M D. Paine, P H. Mackenzie
"Rio Tinto Iron Ore (RTIO) has an extensive history in the application of geometallurgy to the iron ore value chain. Fundamental to this has been the geological logging of material types which are ass
Jun 15, 2016
-
Peak Particle Accelerations Induced by a Decked Column of ExplosivesBy Baird G. R, Jurak R. N
In this study Dynamic Finite Element Modelling is used to investigate the distribution of peak particle accelerations (PPA) induced in a rock mass by a vertical decked column of explosives. The rock
Jan 1, 1995
-
Modified Open Cut Equipment in Underground Mining at King Island ScheeliteBy McLaughlin R. G, Brammer R. A J
King Island Scheelite had been using dealer modified front end loaders for two years when in 1974 it started to increase production. Suppliers were then quoting long deliveries for underground die
Jan 1, 1977
-
Blasting for Reduced Process Plant Costs at Argyle Diamond MineBy Smallnone P, Walker B
Mining of the AKI lamproite pipe at the Argyle Diamond Mine (ADM) commenced in 1985. Originally designed to mine ore at a rate of 3.6 Mt per annum, the project has gone through two major plant expan
Jan 1, 1998
-
Dredger drop impact on slope stability – Hazelwood MineBy J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4
ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du
Jun 21, 2022
-
The Application of Seperate Conditioning to Improve Zinc Metallurgy at Woodlawn MinesBy Phelan JM
Poor selectivity in the separation of two sulphides generally arises because the flotation characteristics of the coarse sizes of the valuable mineral and finer sizes of non-valuable minerals are id
Jan 1, 1988
-
Gas Phase Sulphation of Nickel Laterite OresBy Rankin W. J
Increasing concern with the emission of sulphur dioxide from smelters and roasters has caused renewed interest in processes which can use waste sulphur dioxide, such as the sulphation of nickel late
Jan 1, 1996
-
Effect of calcium oxalate CaC2O4.H2O on the Reduction and phosphorus partition of a high-P Brockman oreBy S Hapugoda, H Han, L Lu
Charcoal produced from Syzygium Zeylanicum trees was widely used in ancient Sri Lankan iron smelting practices. Charcoal made from Syzygium Zeylanicum tree trunks, branches and leaves were analysed by
Sep 18, 2023
-
A Review of the Influence of Gas Pressure on Block Stability during Rock BlastingBlasting is an essential component of most mining operations, and is used to reduce the rock mass to a workable size distribution, as well as to create stable openings and pit walls. Frequently, there
Jan 1, 1999
-
Quantifying and Managing Environmental Financial Risk from Mining OperationsThis paper concerns a pragmatic approach to a problem that is common to many operations in the mining industry: how, over the short-term, to grasp the extent and distribution of long-term financial
Jan 1, 1994
-
Ore Reserve Estimation at the Feasibility Study Stage - The Period of Greatest RiskGold mineralization like other low concentration high value commodities has gained the notoriety of being difficult to sample. This adversely affects the confidence that can be placed in resource e
Jan 1, 1990