Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Notes on Ore Dressing Practive at North Broken Hill Limited

    CONTENTSIntroduction.Ore Bodies.Variations in Ore Dressing Practices.Stage I .Gravity Concentration for the production of a Lead Concentrate. 1909-1918.Stage Il Gravity plus Flotation Treatment for th

    Jan 1, 1948

  • AUSIMM
    A Proposed Standard for the Objective Measurement of Muck Pile Profiles

    Blast Engineers frequently use the terminology "the blast showed good heave", or even "the heave was better this time". It is reasonably obvious that "good" and "better" are not the best terms to us

    Jan 1, 1990

  • AUSIMM
    Plant Design for Closure

    By D P. Murphy, R F. Dewhirst

    Traditionally closure has been seen by the Resource sector solely as a green or an environmental issue, focused primarily on the requirement to rehabilitate the site following cessation of production

    Jan 1, 2006

  • AUSIMM
    Experiences in Applying Computers for On-Stream X-Ray Analyzing and Development of Automation in Mineral Flotation Processes

    By Tarvainen M, Mattila O

    Outokumpu Oy has systematically developed the automation of mineral flotation covering the technology of both new devices and control methods, and as a practical result of this effort currently pr

    Jan 1, 1977

  • AUSIMM
    Characterization of Particulate and Composite Mineral Grains by On-Line Computer Processing of Sem Images

    By Hall J. S, Zuiderwyk M, Reid A. F

    A prototype version of a computer controll- ed on-line scanning electron microscope image analyser, employing the real-time signals ob tamed by digital control of the electron beam has been used to

    Jan 1, 1977

  • AUSIMM
    Above/Belowground Feedback May Facilitate and Sustain Mono-Dominance on Rehabilitated North Stradbroke Island

    By V Glenn, P McKenna, H Vickers, P Audet, M J. Gillespie, A Gravina, D R. Mulligan

    A requisite corollary of mineral sand mining on North Stradbroake Island (Queensland (Qld), Australia) has been the progressive rehabilitation of post-mined lands for the revegetation of native subtro

    Jul 10, 2012

  • AUSIMM
    Case Histories of Hard Rock Tunnelling Using a Multi-boom Hydraulic Drilling Jumbo

    By Wright R. J

    The Commission called tenders for a four boom hydraulic jumbo, plus basket, on an art- iculated carrier in Sept. 1977. Atlas Copco submitted the successful tender in Jan. 1978 for the supply of a th

    Jan 1, 1981

  • AUSIMM
    Venturi Scrubber System for Dust Control on a Longwall Face

    By Rao S. B, Baafi E. Y

    A venturi based multi-scrubber air cleaning system has been developed for dust control along a longwall face in coal mines. The system consists of a number of scrubbers. strategically placed along the

    Jan 1, 1995

  • AUSIMM
    Key Operating Parameter Comparison Ciurug Mine Design at Pongkor Gold Mine -- Java-Indonesia

    Pongkor Gold Mines is one of seven units of production owned by PT Aneka Tambang (State owned mining company). The mine is located in the western part of Java Island, Indonesia. It is in the Bogor Dis

    Jan 1, 1997

  • AUSIMM
    Holistic Management of Sulfides at Rio Tinto Iron Ore's Pilbara Mine Sites

    Rio Tinto Iron Ore (RTIO) manages eleven mines in the Pilbara region, Western Australia. Three of these mines have previously or are currently mining black shale that contains varying amounts of pyrit

    Jan 1, 2009

  • AUSIMM
    Open Stoping with Associated Caving at Mount Lyell

    Underground mining of the ore below the West Lyell open cut commenced in 1972 with the 10 Series stopes above rail haulage level. The third lift of stoping (30 Series) com- menced this year, and acce

    Jan 1, 1982

  • AUSIMM
    Evolution in Panel Caving Undercutting and Drawbell Excavation, El Teniente Mine

    By P Yß±ez, G Ferguson

    The El Teniente mine produces more than 340 000 tonnes of fine copper per year from an industrial complex of underground mine, concentrator and smelter. Mass caving methods are employed to deliver app

    Jan 1, 2000

  • AUSIMM
    Subsurface Environmental Engineering - A Look Into the Future

    Perhaps the only thing certain about an address that purports to look into the future of any human endeavour is that time will prove it :.o be inaccurate. In undertaking the dubious, but oft-times

    Jan 1, 1988

  • AUSIMM
    A new gas emission prediction model based on Australian longwall mining conditions

    By Q Qu

    Reliable prediction of longwall gas emission sources and rate plays a critical role in mine ventilation and methane drainage capacity planning. Over the years, Australian longwall mines have been usin

    Oct 12, 2022

  • AUSIMM
    The Selwyn Gold-Copper Mine

    By Dinuzzo P, Wychie J, Desoe C

    The Selwyn Gold-Copper Mine is located 150 km southeast of Mount Isa within Proterozoic units of the Mount Isa inlier (Figure 1). Mineralization in the mine area is associated with strongly sheared

    Jan 1, 1989

  • AUSIMM
    Direct Reduction Technology - The Western Titanium Process for the Production of Synthetic Rutile, Ferutile, and Sponge Iron

    By Clements R. J, Davey J. M

    Development of the process from the pilot stage to the current operation of the Capel, W.A. plant is briefly described. The design criteria for a larger sized plant are discussed together with fact

    Jan 1, 1979

  • AUSIMM
    Power Generation Utilising Mines Gas

    By Callinan AN

    Broken Hill Proprietary Company Limited have recently commissioned a 14 Megawatt power station adjacent to its underground coal mining operation at Appin NSW. The power station is fuelled by metha

    Jan 1, 1987

  • AUSIMM
    Assessment of climate risk in the Australian mining industry

    By M Allen

    By its nature, the mining industry is energy and emissions intensive. In the future, the world will still require the outputs of mining but the industry will need to adapt to the low emissions economy

    Jul 25, 2018

  • AUSIMM
    Factors Affecting Ground Support Performance in Mining

    By Dugan K. J

    Mine operators are currently in a situation where market forces are acting to reduce profit margins and at the same time, regulatory bodies are insisting on improved mine safety and stability. This me

    Jan 1, 1992

  • AUSIMM
    Simulating Intact Rock Behaviour Using Bonded Particle and Bonded Block Models

    By A Turichshev

    The synthetic rock mass (SRM) approach for modelling jointed and veined rock has been at the forefront of caving geomechanics research for years. A well-constructed and calibrated SRM model can captur

    May 9, 2016