Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Simplified Creep Analysis for Low Strength Seams in Rock Pillars

    By M Habte

    This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a

    Mar 8, 2011

  • AUSIMM
    Planning, Investigation and Design of the Burwood Beach Ocean Outfall, Newcastle NSW

    By Osorio J. D C, McMahon M. D

    Burwood Beach Sewage Ocean Outfall is being constructed by the Hunter District Water Board as part of an amplification scheme to eliminate pollution from adjacent bathing beaches. The outfall cons

    Jan 1, 1987

  • AUSIMM
    How economics drive the application of ore sorting

    By W Kendall

    Ore sorting has the potential to reduce the feed to wet plants and in the case of complex orebodies that can significantly reduce the water, energy and reagent consumptions and resulting operating cos

    Nov 21, 2018

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    Separation and enrichment of copper, nickel and cobalt from acidic leach solution of smelter slag using solvent extraction and selective precipitation

    By K Haga, G Danha, A Shibayama, L L. Godirilwe

    The hydrometallurgical separation and enrichment processes provide an effective way to selectively recover metals from relatively dilute multicomponent sulfuric acid leach solutions. The multicomponen

    Aug 24, 2022

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Data Mining Mining Data - Ordered Vector Quantisation and Examples of its Application to MIne Geotechnical Data Sets

    By B L. Dickson, E, M F. Lee, P A. Mikula

    Computational techniques are needed to assist in the analysis and interpretation of the increasing amounts of geoscientific and mining related data and information that are routinely gathered at mine

    Jan 1, 2006

  • AUSIMM
    A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West Queensland

    By K George

    The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The

    Sep 20, 2017

  • AUSIMM
    Methods and Approach to Exploration for Hard Rock and Alluvial Gold in Indonesia

    By Dods G. H, Hewitt W. V

    Ashton Mining Limited is currently one of the active companies undertaking gold exploration in Indonesia. Presently 7 Contract of Work areas are being explored for hard rock and alluvial gold. Hard

    Jan 1, 1991

  • AUSIMM
    Structural Controls and Strain Partitioning in the Red October Gold Mine, Western Australia

    By D Howe, J Conn, J G. McLellan, K Gates

    The Red October Gold Mine, owned by Saracen Gold Mines Pty Ltd, is located approximately 80 km south of Laverton, Western Australia. It is considered to be of a similar nature to many of the Archaean

    Aug 18, 2014

  • AUSIMM
    The Marvel Loch Crusher Product Sampling System

    The Marvel Loch Operations (MLO) plant was treating ores from up to six MLO sources and in addition needed to blend externally sourced ores with its own ores. This presented a metallurgical accounting

    Mar 1, 2010

  • AUSIMM
    Exploration and Innovation – The Discovery and Evolution of the 2 Moz Vogue Gold Resource, Sunrise Dam Gold Mine, Western Australia

    By T Blenkinsop, A Jenkins, H Moore, L Fisher, N Oliver, J Cleverley, M Nugus, J McLellan, J Hill, N Brunacci

    The 2 Moz Vogue mineral resource is a recent discovery at the Sunrise Dam gold mine (SDGM), lying approximately 600 m vertically below the Sunrise Dam open pit. Unlike most other lodes, which are domi

    Aug 18, 2014

  • AUSIMM
    Maintaining and Improving Grade Control at New Celebration Gold Mine

    New Celebration Gold Mine is located 35 km SE of Kalgoorlie, Western Australia, in the Archaean Kalgoorlie-St Ives Greenstone belt. The leases total 119 sq kms and arepart of a joint venture between

    Jan 1, 1991

  • AUSIMM
    Identifying and Dealing with Outliers in Resource Estimation

    By C De-Vitry

    In skewed distributions seen in many geochemical data sets, samples at the extreme ends of the distribution are often termed ‘outliers’. Samples considered as outliers can often make exploratory data

    Aug 18, 2014

  • AUSIMM
    Blast movement monitors or polypipe? A study into cost-effective blast movement monitoring at White Foil gold mine, Western Australia

    By M E. Watson

    Minimising dilution and ore loss is an important part of ensuring profitability of a gold mining operation. White Foil open pit gold deposit is a low-grade deposit and therefore managing ore quality i

    Sep 20, 2017

  • AUSIMM
    Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, Sweden

    By M Svartsjaern, D Saiang and K Mäkitaavola

    The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The

    May 9, 2016

  • AUSIMM
    Through Seam Blasting – Leighton Wahana Experience

    By S Agdaca

    Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500&#16

    Nov 8, 2011

  • AUSIMM
    Application of Tagging Systems for Personnel and Vehicle Access Control

    By S Barrow, D Kent

    Controlling the access of equipment, and people, has become more critical over the last few years for improving productivity and to meet safety responsibilities imposed by legislated obligations to ha

    Jan 1, 2005

  • AUSIMM
    Application of Vertical Centrifugal Screen (V3 Separator) in Two-stage, Closed-Circuit Crushing System (CPC Process)

    In sizing of wet coal by the horizontal vibrating screen, screen openings to be used is much restricted, because coal is sticky and its bulk density is little. The electrically heated screen and o

    Jan 1, 1984

  • AUSIMM
    Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes

    By M Lovitt, T Hewitt

    The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside

    Jan 1, 2005