Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Century Discovery, Queensland, Australia - Is Exploration Ever Complete?The Century zinc-lead-silver deposit has a geological resource of 118 million tonnes averaging 10.2% zinc, 1.5% lead and 36 g/t silver. It lies approximately 250 krn NNW of Mt Isa in NW Queensland, Au
Jan 1, 1995
-
An Ammonia Leaching-Solvent Extraction-Electrowinning-Flotation Process for Copper Oxidised Ore TreatmentAn Ammonia Leaching-Solvent Extraction-Electrowinning-Flotation Process for Copper Oxidised Ore Treatment
Sep 13, 2010
-
Recent development and application of SLon vertical ring and pulsating high gradient magnetic separators in the iron ore and ilmenite processing industriesBy X Dahe
SLon vertical ring and pulsating high gradient magnetic separators (VPHGMS) possess the advantages of high efficiency and high reliability in beneficiating weakly magnetic minerals. In recent years, m
Jul 24, 2017
-
Optimisation Improvements in Whittle using Stope Optimisation SoftwareMining One (M1) is often challenged with the task of evaluating deposits considering open cut and/or underground (UG) mining methods. In many near surface deposits a combination of both methods result
Dec 6, 2010
-
The New Updraught Sinter Plant at Mount Isa Mines LimitedAs part or a programme to raise lead smelter capacity from 65.000 to 140.000 tons bullion per annum. one new 1000 sq. ft. updraught area sintering machine replaced eight small downdraught machines.The
Jan 1, 1968
-
Developments at the Rosebery Concentrator of the Electrolytic Zinc Co. of Australasia Ltd.Previous published papers by Fraser (1), Hey (2), and Stillwell (3), have given respectively, details of:-1. The practice in the pilot plant operated at Zeehan for the treatment of ores from the Roseb
Jan 1, 1949
-
Potassium-Bentonite from Mount Kaputar, New South WalesDevitrification of a glassy volcanic ash equivalent to an alkaline trachyte in composition has resulted in the formation of an interstratified illite-montmorillonite with an 1:1\1 content of 1:4 as th
Jan 1, 1967
-
Solar Drying of Laterite Ores at QNI Yabulu RefineryThis paper discusses the history and development of the system and the benefits that are being gained for Yabulu from Solar Drying. Following the end of mining of the local Greenvale and Brolga nickel
Jan 1, 2003
-
Tecnical note-lineament guidelines to mine development: a continuing case history, northeastern QueenslandLANDSAT imagery has renewed interest in linear features first recognised by E. S. Hills in a physiographic model of Australia. Certain of these lineaments are aligned with structures which control min
Jan 1, 1986
-
Rock Mass Excavatability Assessment for the Proposed Open Pit Mine at Globe-Progress, Near ReeftonThe excavatability of the rock mass in a proposed open pit mine at Globe-Progress has been assessed. The rock mass was initially evaluated by determining variations in seismic velocity and by using th
Jan 1, 1996
-
Theory of Sampling – what’s next?By K H. Esbensen
The Theory of Sampling (TOS) has made remarkable strides and has witnessed a suite of achievements over its ~65-year history; especially in the last 15 years, since organised work began for the erstwh
May 9, 2017
-
Electricity û Demand and Supply Conservation and the EnvironmentConservation and environmental issues are raising their profile with respect to both demand restraint and electricity supply options. In New Zealand, conservation pressures and energy efficiency need
Jan 1, 1990
-
How Particles Stick to Bubbles - The Influence of pH and Hydrophobicity in FlotationHow Particles Stick to Bubbles - The Influence of pH and Hydrophobicity in Flotation
Sep 13, 2010
-
Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New ZealandBy P E. H Gregg, R B. Stewart
Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both tai
Jan 1, 1995
-
A Preliminary Geotechnical Assessment for Re-Opening the Blackwater MineBy J Taylor, L Richards, M McKenzie
When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.
Jan 1, 1996
-
CSIRO Research for the Iron Ore IndustryAustralia's iron ore industry is entering a challenging period with the development of new orebodies, the introduction of new products and the push for further downstream processing. In additio
Jan 1, 1999
-
Volcanic Stratigraphy, Structure and Controls on Mineralisation, Golden Cross Mine, New ZealandBy P G. Rutherford, A W. McOnie
A volcanic sequence is described from the Golden Cross Mine, Waihi, New Zealand. The sequence includes seven lithostratigraphic units comprising flow and pyroclastic units of Coromandel Group andesite
Jan 1, 1995
-
Prospects for Gold in New ZealandNew Zealand has been a significant producer of gold for over a century. Total recorded production is over 850 tonnes. There were three major periods of production: the first and biggest was between 18
Jan 1, 1988
-
Underground Mining Methods at Mount Morgan, QueenslandOWING to two large falls of ground which resulted in serious accidents occurring towards the end of 1908, it became evident that the "open chamber" system then in use was unsuitable for the
Jan 1, 1910
-
The autonomous rail conveyor significantly reduces ore haulage costsBy T Graham
The invention of the traditional belt and idler conveyor system is attributed to Thomas Robins in 1892. This basic concept, ubiquitous in most mining operations, has not changed markedly in 125 years
Jul 24, 2017