Search Documents

  • NIOSH
    RI 9448 - Seismicity and Stress Changes Subsequent to Destress Blasting at the Galena Mine and Implications for Stress Control Strategies (9844d375-659f-4a7e-a5c0-a9fa2020e7d7)

    By F. M. Boler

    The U.S. Bureau of Mines conducts research at the Galena Mine, Wallace, ID, with the aim of mitigating the effects of rock bursting. Destress blasting is commonly used as a stress control technique at

    Jan 1, 2010

  • AUSIMM
    Treatment of Wastewaters from Mining Projects

    Wastewaters from Mining Projects both gold mining and coal mining generally have minerals in solution or very fine material which does not settle out quickly. These waters in the past have been discha

    Jan 1, 1986

  • NIOSH
    Availability Of Federally Owned Minerals For Exploration And Development In Western States: Idaho, 1988

    By Paul C. Hyndman

    The U.S. Bureau of Mines inventoried Federal mineral lands in Idaho and classified them in detail, section by section, according to their availability for mineral exploration and development as affect

    Jan 1, 2012

  • ABM
    Distribuição De Weibull E Avaliação Abnt De Com Tijolo De Argila Para Alvenaria Estrutural Usado Em Construções De Até 5 Andares

    By Afonso Rangel Garcez de Azevedo

    Este trabalhou lidou com a avaliação de amostras de tijolo de argila para alvenaria estrutural com adição de resíduo cerâmico cujas dimensões nominais são 11,5x39,0x19,0 cm. As amostras foram queimada

    Oct 30, 2017

  • SAIMM
    Cokriging of compositional balances including a dimension reduction and retrieval of original units

    By V. Pawlowsky-Glahn, E. Pardo-Igúzquiza, J. J. Egozcue, R. A. Olea

    Compositional data constitutes a special class of quantitative measurements involving parts of a whole. The sample space has an algebraic-geometric structure different from that of real-valued data. A

    Jan 1, 2015

  • AUSIMM
    The Direct and Indirect Effects of the Reagent Suite on Froth Stability in Laboratory Scale Batch Flotation Tests

    The Direct and Indirect Effects of the Reagent Suite on Froth Stability in Laboratory Scale Batch Flotation Tests

    Sep 13, 2010

  • DFI
    Design, Construction and Monitoring of a Secant Pile Compression Ring

    By Jason Weck, Alper Turan, Ali Chehadeh

    "Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro

    Jan 1, 2014

  • AUSIMM
    Application of Multi-Slicing Highwall Mining System with Stowing at Surface Coal Mine in Thailand

    The Electricity Generating Authority of Thailand (EGAT) Mae Moh coal mine is an open-cut coal mine in Thailand that produces about 16 Mt of lignite annually to generate 2400 MW of electricity. The sur

    Dec 6, 2010

  • AUSIMM
    The Economic Potential of the Greymouth Coalfield

    The Greymouth Coalfield contains New Zealand's greatest known resource of bituminous rank coal. The coals are of very high quality, with low ash and sulphur contents and a range of other properti

    Jan 1, 1985

  • CIM
    40Ar/39Ar Geochronology of Alteration and Petrogenesis of Porphyry Copper-Related Granitoids in the Darreh-Zerreshk and Ali-Abad area, Central Iran

    By P. H. Reynolds, S. Liaghat, A. Zarasvandi

    "Darreh-Zerreshk and Ali-Abad are two relatively small porphyry copper-type deposits in Yazd Province in central Iran. They are located within the central Iranian volcano-plutonic belt, formed above t

    Jan 1, 2007

  • IIMP
    Nuevo marco para la prevención y resolución de conflictos sociombientales del sector minero extractivo en el Perú

    By Rafael Valencia-Dongo

    Se aborda una nueva metodología de resolución de conflictos en entornos minero-extractivos, que tiene como base la teoría de juegos aplicada a las interacciones de tres actores clave dentro de la diná

    May 22, 2019

  • IIMP
    La ordenación de los fondos documentales bibliográficos y cartográficos geológicos y mineros del Perú

    By Francisco Herrera R.

    El presente texto describe las técnicas de tratamiento en los bancos de datos y sistemas de información de la geología y minería en el Perú. En esta perspectiva, se muestra la organización del sistema

    Oct 14, 1980

  • SME-ICGCM
    Comparison Of Predictions And Measurements Of Subsidence Caused By Underground Mining In Northern Appalachia

    By H. J. Siriwardane

    This paper presents results from three case studies involving longwall mine panels at which the measured ground movements were compared with the numerical model predictions based on the finite element

    Jan 1, 1988

  • AUSIMM
    Regional Stability of Underground Mines ù A Core Risk

    The history of soft and hard rock underground mining is blemished with regional instabilities of mine workings. Whilst the potential consequences of regional instability events are recognised to be hi

    Jan 1, 2003

  • ABM
    Comportamiento De Cobre Conteniendo Plomo

    By Horacio Destaillat

    Desde hace aproximadamente 15 años se encontró por experiencia empírica que se puede “neutralizar” el efecto del plomo sobre la maleabilidad en caliente de cobre proveniente de la refinación térmica d

    Aug 7, 2018

  • SME
    Planning and Fast Track Tunnel Design in Historical Downtown Charleston

    By James McKelvey, Larry Drolet, Jason Swartz

    INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved

    Jan 1, 2005

  • IIMP
    Proceso Green Mining para extraer metales de forma ambientalmente sostenible

    By Francisco J. Cárdenas

    El Proceso Green Mining es una innovación tecnológica para la extracción de metales a partir de los concentrados de minerales sulfurados que los contienen, aplicando procesos y operaciones pirometalúr

    Sep 1, 2017

  • SAIMM
    Design Of Permanent Intruded Plugs At South Deep Gold Mine

    By G. S. Littlejohn

    In anticipation of the flooding of an adjacent dolomitic groundwater compartment, five rough parallel sided boundary plugs at 58 and 50levels have been designed to resist safely hydrostatic heads of 1

    Jan 1, 2006

  • SME
    The Next Step Change In The Size Of Mining Projects

    Many of the world?s largest existing mines are considering substantial step changes in production volumes, compensating for declining ore grades while trying to address increases in world demand for r

    Feb 27, 2013

  • SAIMM
    Optimisation Of SiMn Production At Transalloys

    By J. Griesel, P. H. F. Bouwer, K. Bisaka

    Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon

    Jan 1, 2004