Search Documents

  • SME
    Coping with Boulders in Soft Ground TBM Tunneling

    By Peter B. Dowden, Robert A. Robinson

    Boulders, frequently found in tunnels excavated through soils, can pose major problems for full face TBMs in terms of slowing or halting the tunnel advance, cutter damage, and abrasive wear. The paper

    Jan 1, 2001

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • IIMP
    Diseño y simulación de un Controlador Predictivo parametrizado para circuitos de molienda de minerales

    By Manuel Manyari

    El presente trabajo tiene como objeto implementar un controlador predictivo aplicado al proceso de molienda de minerales, totalmente personalizado y con capacidades de expansión en su número de variab

    Sep 1, 2017

  • IIMP
    El Tajeo Mitchell (c52b1c98-c6d3-4e82-a2ee-0896ed2579d6)

    By Kenneth Allen

    El presente artículo describe el tajeo Mitchell como método para recuperar los pilares angostos de mineral dejados entre los tajeos de escuadras ya explotados. El tajeo Mitchell fue empleado durante u

    Aug 1, 1955

  • IOM3
    Dispersion of platinum, palladium and gold from the Main Sulphide Zone, Great Dyke, Zimbabwe

    By D. M. Evans, D. L. Buchanan

    Paper presented at the IAGOD international symposium on mineralisation related to mafic and ultramafic rocks, held in Orleans, France, 1-3 September 1993. The Zinca area was chosen as a suitable locat

    Apr 1, 1994

  • IIMP
    Aplicación del sistema operación continua en la optimización de la productividad mina Xstrata Tintaya-Antapaccay

    By Germán Rodolfo Ocampo Castillo

    El presente texto señala la incrementación de la productividad de la mina Xstrata Tintaya -Antapaccay a través del contrato de personal adicional, donde se reemplace a los operadores titulares durante

    Sep 12, 2011

  • AIME
  • SME
    Regrind Mills: Scaleup Or Screwup

    As ore deposits become finer grained the requirements for regrinding before cleaning or leaching have increased substantially. Despite this increasing need, there is no standard test to predict grind

    Jan 1, 2011

  • NIOSH
    Acid-Mine-Drainage Problems - Anthracite Region Of Pennsylvania - Summary

    By S. H. Ash

    NO MORE important question has come before the coal-mining industry in many places, especially in the anthracite region of Pennsylvania, than prevention of stream pollution by mine drainage. Available

    Jan 1, 1951

  • AUSIMM
    Fragmentation Characteristics of Iron Ores from Anshan, China

    Fragmentation Characteristics of Iron Ores from Anshan, China

    Sep 13, 2010

  • SAIMM
    Viscosity and flow behaviour of TiO2-containing blast furnace slags under reducing conditions

    By Y. Mao, D. Xie

    The viscosity of TiO2-containing blast furnace slags may increase rapidly (commonly referred to as thickening) under strong reducing conditions in the blast furnace. To elucidate the mechanisms for sl

    Jan 1, 2004

  • DFI
    Modern Procedures For The Design Of Driven Pile Foundations

    By G. G. Goble

    Significant progress has been made in the past decade in determining the load bearing capacity of pile foundations. Developments in the means of prediction of pile capacity as limited by soil strength

    Jan 1, 1988

  • SAIMM
    Blast optimization at Kriel Colliery - Synopsis

    By A. M. Neale

    Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is expe

    Jan 1, 2010

  • SAIMM
    The Practical Application Of The Wemco Hms Drum Separator In The Mining & Metals Recycling Industries - 1. Introduction

    By K D. Wilkes

    The WEMCO Heavy Media Drum Separator was first introduced by WEMCO in California in the 1940`s, initially from their base in San Francisco and later when the company moved to Sacramento. The WEMCO Co

    Jan 1, 2006

  • SAIMM
    Metallurgy From Above ? A Google Earth Perspective

    By Q. C. Reynolds

    Keywords: Pyrometallurgy, plant, photography, GIS, satellite images, Google Earth Google Earth is a piece of software able to display an interactive three-dimensional map of the world, combining a

    Jan 1, 2006

  • IOM3
    Kinetics of Cu(II) adsorption by Penicillium sp.

    By S. P. Mishra, G. R. Chaudhury

    The adsorption of Cu2+ ions by Penicillium sp. displayed a dual rate, with an initial faster phase followed by a slower one. The adsorption rate increased with increasing pH due to chemical and bioche

    Aug 1, 1995

  • SME
    A Slope Stability Analysis For The Trojan Pit Expansion At The Wharf Resources Mine, Black Hills, SD

    By V. L. Franzen, Z. J. Hladysz, C. A. Kliche

    The Wharf Resources mine, located in the Bald Mountain Mining District approximately 6.4 km (4miles) west of Lead, South Dakota, has operated a surface gold and silver mine and heap leaching processin

    Jan 1, 2000

  • ABM
    Fatores Que Influenciam A Variação Da Massa Linear Na Produção De Arames Ca60

    By Enrico Tosolini

    O controle da massa linear dos arames CA60 vem sendo tratado com máxima prioridade, devido ao constante esforço da indústria nacional de reduzir os custos e melhorar a eficiência de produção. O trabal

    Aug 16, 2017

  • CIM
    Small-scale mining using the modular gold processing unit at the Granada mine, Rouyn-Noranda, Quebec (d2911615-1db3-4ddc-ae0e-f3be18f048cf)

    By P. Trudel, É. Cabot, L. Cabot

    "A modular gold processing unit (MGPU) was designed, installed and operated over an eight-month period by RSW-Béroma at the Granada mine located near Rouyn-Noranda, Quebec. A description of the projec

    Jan 1, 2003

  • AUSIMM
    Undercutting to Surface Breakthrough – Cadia East Panel Cave (Stage 1)

    By B Mobilio, M Secheny, J Rachocki, G B. Sharrock, A Jäger, J L. Lett, I Brunton, G W. Capes

    Establishment of the Cadia East Panel Cave Stage One (PC1S1) commenced with the firing of the first bell in early 2011. Production began with the completion of the undercut in May 2014. PC1S1 used a p

    May 9, 2016