Search Documents

  • NIOSH
    "Advance And Relieve" Mining, A Method To Mitigate The Affects Of High Horizontal Stress On The Mine Roof

    By D. R. Dollnar

    At a mine in central PA, high horizontal stresses have caused long running roof falls resulting in hazardous conditions for the miners and the premature abandonment of panels. Because of these conditi

    Jan 1, 2002

  • IIMP
    Sistematización de la información geológica en la UEA Yauli

    By Luis Valdivia

    Dado que el objetivo principal de un departamento de Geología de exploraciones es el de estimar recursos minerales en nuevos blancos de exploración identificados a través del análisis e interpretación

    Sep 24, 2008

  • AUSIMM
    Digital Terrain Modelling for Exploration and Mining

    By H North, J Barringer, S McNeill, D Pairman

    Models of ground surface elevation, slope, aspect, curvature, roughness, deformation, as well as other features are gathered together in the term Digital Terrain Model (DTM). DTMs can be generated fro

    Jan 1, 2000

  • AIME
    Drilling and Producing – Equipment, Methods, and Materials - Effectiveness of Gun Perforating

    By T. O. Allen, J. H. Atterbury

    Laboratory and field tests during the past five years indicated considerable variation in the penetrating power of commercially available gun perforators. Many of the guns which achieved inadequate pe

    Jan 1, 1955

  • NIOSH
    Estimated Sound Power Radiated By Surfaces On A Continuous Miner Tail Section Using Vibration Measurements

    By David S. Yantek

    Miners in underground coal mines experience prolonged exposure to high noise levels, often with A-weighted sound levels in excess of 90 dB. Field tests have shown that the continuous miner conveyor i

  • SAIMM
    Monitoring the lining of an ilmenite smelting furnace

    By K. Sørli, H. Elstad, I. M. Skaar, A. Hildal

    Generally, monitoring of refractory furnace linings is of interest to the metallurgical industry. The main issues are to control wear of the furnace lining and break out of molten metal. Penetration o

    Jan 1, 2003

  • IIMP
    Entre el manejo de residuos y el cierre de minas n Cia. Minera Coimolache

    By Angel Benjamín

    En Minera Coimolache se generan aproximadamente 700 Ton de residuos sólidos al año, de los cuales el 50 % corresponden a residuos orgánicos y a través de la fermentación anaeróbica con Microorganismos

    Sep 1, 2017

  • SME-ICGCM
    Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)

    By Gabriel S. Esterhuizen

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very

    Jan 1, 2006

  • AUSIMM
    Tungsten Carbide in Mining

    By Gunderson C. T

    The use of carbide tipped integral drill steels and detachable bits is discussed in relation to the means of drilling or cutting employed. It is stressed that only by correct use can the full value of

    Jan 1, 1958

  • CIM
    Upgrading Molybdenite Ores between Mine and Mill Using Microwave/Infrared (MW/IR) Sorting Technology

    By Eugen Gluck, Gus Van Weert, Peter Kondos

    "Microwaves have the capability to heat up sulphides, especially clusters of particles of approx. 1 mm. Some sulphides absorb microwaves more readily than others. Molybdenite is especially effective i

    Jan 1, 2009

  • AUSIMM
    Seismic Reflection Mapping of the Winton Basin, Southland

    The Winton Basin

    Jan 1, 1992

  • SME
    Rahmenbedingungen für eine nachhaltige Kohlenutzung in Deutschland

    By F. -J. Wodopia

    Sustainability of energy supplies has been an issue of general interest for a long time. Whilst in the past the continuous productive use of natural commodities was in the fore, its compatibility with

    Jan 1, 2011

  • SME-ICGCM
    Towards an Improved Stone Mine Pillar Design Methodology: Observations from a Mistake

    By Francis Kendorski

    The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech

    Jan 1, 2007

  • ISEE
    Investigation into Monitoring of Initiator Performance

    By Charles Deacon

    The mining industry is constantly taking greater cognisance of their operating costs as a strategy to counter the effects of falling commodity prices. As a result, optimal operating efficiency is more

    Jan 1, 2000

  • ABM
    Estudo Do Grau De Sensitização Do Aço Inoxidável Uns S31803 Envelhecido A 750°c

    By Luara da Costa Morais

    O objetivo deste trabalho compreende o estudo do grau de sensitização (DOS) do aço inoxidável dúplex (AID) UNS S31803 envelhecido a 750ºC por ensaios de DL-EPR. Para isto, corpos de prova do aço em es

    Aug 7, 2018

  • ISEE
    Experiences with Electronic Delay Detonators in Major Production Blasts

    By Claude Cunningham

    Ths oonoept of precise. eooursts timing with Elsotronic Delay Detonators (EDD’s) was first ssriously sddresssd in ths mid 80’s end much wss made of the cheapness end profusion of digital wstohes in te

    Jan 1, 1994

  • SME-ICGCM
    Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)

    By Holger Witthaus

    Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci

    Jan 1, 2009

  • SAIMM
    Reconstruction time of a mine through reliability analysis and genetic algorithms - Synopsis

    By M. Kumral

    A mining system consists of many sub-systems such as drilling, blasting, loading, hauling, ventilation, hoisting and supporting. During mining operation, these sub-systems may experience various probl

    Jan 1, 2009

  • IIMP
    Estudio tecnico económico de remoción de carga de sulfato en efluentes industriales y mineros

    By Cristian Marquez S., Mochita Ramirez O. Payano L.

    En el presente trabajo técnico se evalúan procesos de remoción de sulfato de unos efluentes de tipo industrial y minero con una alta carga de sulfatos (5000 a 1500 pm) hasta valores menores de 1000

    Sep 1, 2017

  • DFI
    Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? Introduction

    By Thomas A. Printz

    The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac

    Jan 1, 2013