Search Documents

  • TMS
    Analysis of Light Hydrocarbon Gases in the Pyrolysis and Combustion Processes of Waste Tires

    By Joner O. Alves

    The disposal of scrap tires has been a serious environmental problem. The treatment of this waste by pyrolysis and combustion has advantages since the landfill space is dwindling and the production of

    Jan 1, 2010

  • SME
    Development And Comparison Of Subsidence Prediction Methods For The Eastern U.S. Coalfields

    By P. Schilizzi, A. Jarosz, M. Karmis

    This paper is concerned with subsidence prediction methods and in particular with two techniques, one based on profile functions and the other on influence functions. Profile function methods provide

    Jan 1, 1986

  • IIMP
    Recuperación de las aguas de la mina cobre para la flotación de la blenda en la concentradora de la Compagnie des Mines de Huarón

    By Georges Viala

    El siguiente texto señala que la recuperacíón de las aguas de la mina a través de los reactivos de flotacíón, en vez de cemento de cobre, resulta más económico, encontrándose que la lb de Cu contenid

    Jul 20, 1960

  • CIM
    Automating Delay Reporting to Deliver Effective Maintenance

    By Shaun Booth

    Automating Delay Reporting to Deliver Effective Maintenance Corporate Background: Technology Company: Matrikon Inc. Global software and service provider of Information Technology and Control Solut

    May 1, 2003

  • SME
    Profitable copper production from low-grade waste ores (9ed38e1e-baf5-48ca-b79e-12daf9fc8dca)

    By P. I. James, M. R. Baker

    Este artículo analiza la nueva producción de cobre a partir de "minerales de desecho" de baja ley usando la tecnología de Blue Planet Strategies DEMET™ (Dynamic Electrode Mining Effluent Treatment, po

    Jan 1, 2014

  • SAIMM
    Localized Uniform Conditioning (LUC): Method and Application Case Studies

    A new method, localized uniform conditioning (LUC), was proposed in 2006 for modelling grades of small blocks of ore when data spacing is too broad for their accurate modelling by the linear regressio

    Jan 1, 2014

  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • CIM
    Slurry Rheology and Grinding

    By Alain Langlais, Caroline Boudrias Chapleau, Claude Bazin, Ahmed Bouajila

    "Slurry «viscosity» has been recognised for several decades as a variable that significantly influences the operation of grinding mills. This paper describes an instrument that can be used in a labora

    Jan 1, 2003

  • ABM
    Potencial Uso De Resíduos Agrícolas Como Material Pulverizado Para Injeção Em Altos-fornos

    By Lays Augusta Leal Carvalho, Luiz Filipe Cardoso de Oliveira, Alex Milton Albergaria Campos, Paulo Santos Assis

    O agronegócio movimenta a economia de muitos países, sendo que sua produção representa um terço do PIB mundial. Desde a colheita até o processamento de seus produtos, a atividade agrícola gera uma gra

    Oct 1, 2019

  • AUSIMM
    Presidential Address. Some Applications of Geology to Mining and Metallurgy

    Professor Skeats said: I wish at the ,outset to express my appreciation of the h0!-l0ur conferred on me by my election as President of this Institute for the ensuing year. The selection of a geologist

    Jan 1, 1924

  • CIM
    Gold Mineralization at the Anomaly A Deposit, Clarence Stream Area, Southwestern New Brunswick: Distal Deposits of a Syn-Deformational Intrusion-Related Gold System?

    By M. J. McLeod, S. Watters, G. G. Lutes, S. Castonguay

    "Gold-bearing mineralization at Anomaly A occurs in polydeformed Ordovician turbidites of the Kendall Mountain Formation of the St. Croix belt in southwestern New Brunswick, and is hosted by WSWtrendi

    Jan 1, 2008

  • ABM
    Sistema De Controle Da Produção Siderurgica Baseado Em Transferência Do Conhecimento

    By Leonardo Matsumota

    Este trabalho aborda um estudo de caso sobre a transferência do conhecimento siderúrgico de colaboradores da empresa para o sistema que realiza o controle de produção da Usina de Cubatão. Este process

    Jul 30, 2018

  • DFI
    Short Comparison Of The Determination Of Allowable Loads Of Steel H-Piles Following The Practice Applied In Different European Countries - Synopsis

    By L. P. Weber

    During the years 1983-1987, a research programme, jointly performed by the steel producers ARBED, British Steel Corporation, Peine-Salzgitter, Unimetal, and co-sponsored by the European Community for

    Jan 1, 1991

  • ABM
    Adequação Do Processo De Fabricação De Juntas Aluminotérmicas Para Trilhos Ferroviários - Caracterização

    By Rodolfo Dal Alva Pinto

    Uma linha contínua não só melhora o conforto aos usuários, mas também melhora as condições de desgaste, fadiga e manutenção dos equipamentos ferroviários. Porém os parâmetros de soldagem devem ser bem

    Aug 16, 2017

  • SME
    Performance Of The Lorraine Mine Site Cover To Limit Oxygen Migration

    By Bruno Bussière, Michel Aubertin, Anne-Marie Dagenais, Johanne Cyr

    A five steps remediation program was commissioned in 1998 for the acid generating Lorraine mine site, located in the Témiscamingue region, Quebec, Canada. It included, as the main expenditure, a cover

    Jan 1, 2005

  • IIMP
    Incidencia de la geomecánica en los procesos de perforación y voladura en labores mineras subterráneas

    By Rubén Maza Rubina

    El presente trabajo describe el uso de la geomecánica como herramienta de ingeniería utilizada en las principales actividades unitarias de minado subterráneo como son la perforación, voladura y sosten

    Jul 31, 2003

  • SME
    The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 Months

    By Refik Elibay, Lawrence A. Williamson, George D. Barnes

    Under an extremely aggressive schedule, final design of 13.5 km (8.4 miles) miles of 8.2 m (27 ft) diameter deep rock tunnel, 322 ML/day (85 million gallons / day)submersible pumping station and assoc

    Jan 1, 2005

  • CIM
    A comparison of thermally alloyed Zn-Fe coatings produced by mechanical wiping to those produced by post-coating annealing

    By J. P. Landriault, F. W. Harrison

    "Zinc-iron alloy coatings can be produced by either thermally alloying hot-dipped galvanized steel or by electro deposition. Stelco Inc. produces a thermally alloyed Zn-Fe alloy-coated steel, which is

    Jan 1, 1987

  • SME
    South Cobb Tunnel - Cobb County?s Solution To Meeting Future Waste Water Capacity

    By Wojciech Klecan

    Cobb County, located on the northwest side of Atlanta, GA, is continually growing and, like many other metropolitan areas, it needs to increase the capacity of its waste water system to meet future de

    Jan 1, 2009

  • CIM
    Cyanide Recovery and Detoxification Study on Seabridge Gold’s KSM Project

    By Dean Lindsay, Inna Dymov, Mariam Melashvili, Jim Smolik, Chris Fleming

    "This paper presents results from the proposed cyanide detoxification circuit for Seabridge Gold’s KSM project. The proposed flowsheet uses a two-stage CCD (counter-current washing/decantation) circui

    Jan 1, 2015