                A Case Study of Topography?Related Stress Rotation Effects on Multi?seam StabilityBy Ihsan Berk Tulu
The complex interaction between multiple seam pillar extraction panels and variable topography can generate unexpected ground control problems. This case study describes stress-related damage in multi
Jan 1, 2014
 - 
                    
                The Design of Primary Ground Support during Roadway Development Using Empirical DatabasesBy Ry Stone
"There have been many design practices utilised within the coal mining industry to arrive at the minimum densities of primary ground support required during roadway development. This paper demonstrate
Jan 1, 2015
 - 
                    
                Controlling Subsidence Effects Using Partial BackfillingBy Yingzin Zhou
Partial backfilling can be used to reduce and control surface subsidence damage caused by longwall mining or pillaring operations in room-and-pillar mines. The use of partial backfill as opposed to to
Jan 1, 1990
 - 
                    
                Radon Detection of Mining–Induced Fractures in Overlying Strata of Shallow Coal Seams in ChinaBy Dongsheng Zhang, Xufeng Wang, Wei Zhang, Gangwei Fan
"Large-scale longwall mining of shallow coal seams could cause mining-induced fractures to communicate with the surface immediately in Northwest China, leading to a series of mine safety and environme
Jan 1, 2015
 - 
                    
                Axial Performance of a Modified Fully Grouted Cable Bolt Tested with a New Laboratory Short Encapsulation Pull TestBy Paul C. Hagan, Jianhang Chen, Serkan Saydam
"Modified cable bolts are commonly used in underground mines due to their superior performance in preventing bed separation when compared with plain strands. To better test the axial performance of a
Jan 1, 2015
 - 
                    
                Economic Impact of Ascending Mine?Waters in GermanyBy Axel Preusse
Due to a political decision, German hard coal mining will come to an end in the year 2018. By then, there will have been more than 150 years of industrial grade mining activities. Located in the weste
Jan 1, 2013
 - 
                    
                Gob Canopy Roof Support for Difficult Natural ConditionsBy Jay Hilary Kelley
This paper proposes a modification of longwall roof support to meet new difficult mining conditions that are anticipated in the future. A gob canopy is a movable appendage attached on the rear of a lo
Jan 1, 1997
 - 
                    
                Recent Experience Using Telltale Roof Monitoring SystemsBy David Bigby, Tim Ross, David Conover
"Extensive arrays of telltale roof monitoring instruments were recently installed in a Mexican copper mine and a large underground mined storage facility in the eastern U.S. The data were used to eval
Jan 1, 2010
 - 
                    
                Study on the Modified Model of Probability Integra MethodBy Zhang Hongzhen
The fast convergence of boundary is a major problem of probability integral method, especially for the prediction of mining under thick alluvium, abandoned mine goaf, etc. To solve this problem and im
Jan 1, 2014
 - 
                    
                A Comparison Of Overburden Response Due To Longwall MiningBy David K. Ingram
The objective of this U.S. Bureau of Mines (USBM) investigation was to characterize overburden response due to longwall mining. Subsurface strata and surface deformations were monitored at two sites i
Jan 1, 1994
 - 
                    
                Geotechnical Investigation For A Single Entry Design For Longwall MiningBy Madan M. Singh
Currently longwall coal mining operations require at least 3 entries on both the headgate and tailgate ends because of ventilation and safety requirements. Driving of entries, however, is a slow and c
Jan 1, 1982
 - 
                    
                Application Of Mechanical And Groundwater-Flow Models To Predict The Hydrogeologic Effects Of Longwall Subsidence - A Case StudyBy Danny J. Van Roosendaal
An investigation was undertaken to determine hydrogeological effects of subsidence over a longwall coal mine in the Illinois Basin. At this mine, approximately 200 ft of bedrock overburden is overlain
Jan 1, 1995
 - 
                    
                A Method For Estimating Western Coal Strengths From Point Load Tests On Irregular LumpsBy K. Y. Haramy
This report describes the development of an equation for predicting the crushing strength of 2-inch (5.08-cm) cubes of coal from point load tests made on irregular lumps. The equation was developed fr
Jan 1, 1982
 - 
                    
                Geological Conditions At Continuous Miner Sections; Examples From Marrowbone Development Company, Mingo County, West VirginiaBy J. Marc Coolen
Marrowbone Development Company operates a large drift mining complex in the central Appalachian coal field. In 1997, five continuous miner supersections produced close to 9 million tons of raw plant f
Jan 1, 1999
 - 
                    
                Roklok Polyurethane Binder: A Chemical Injection System For The Consolidation Of Severe In-Mine Ground ConditionsBy Kirk W. McCabe
RokLok binder is a two-component polyurethane system consisting of a polymeric isocyanate (Component A) and a polyol resin (Component B). The two chemicals are mixed and injected into the mine rock un
Jan 1, 1981
 - 
                    
                Monitoring Consolidation Settlement Deformation in Deep Borehole of Unconsolidated Strata USing Fiber Bragg Grating SensingBy Liang Dong, Jinxuan Liu, Biao Qiu, Jing Chai
"The Cenozoic unconsolidated strata in the east area of China are composed of clay, sandy clay, fine sand, hardpan, etc. Numerous shafts of the coal mines in these areas have been damaged in various d
Jan 1, 2010
 - 
                    
                Study on the Top Caving Mining Technology in Thick Coal Seam beneath the Earth-Rock Dam and Its InfluenceBy Wenbing Guo, Yi Tan, Erhu Bai
"It is important to study the mining technology under structures for raising the coal resources recovery ratio. Based on the geological and mining conditions, the top coal caving harmonic mining techn
Jan 1, 2016
 - 
                    
                Development of An Online User’s and Training Manual for LaModelBy Keith A. Heasley, Christopher R. Newman
"Originally developed in 1993, LaModel has aided mining engineers and researchers alike in improving the design and safety of underground single- and multiple-seam mining operations (Heasley, 1998). T
Jan 1, 2015
 - 
                    
                Review and Estimation of the Hydraulic Conductivity of the Overburden above Longwall Panels. Experience from AustraliaBy Winton Gale
"The aim of this paper is to summarise the results and conclusions of Australian Coal Association Research Project (ACARP) Report Cl3013 which relate to water inflows into a mine which occur through t
Jan 1, 2010
 - 
                    
                Rib Access Boom for a Roof BolterBy Joe McQuerrey, William Kendall, Gene Wilson
"Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.
Jan 1, 2010