Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                    
                Increased TBM Mobility and Adaptations for Special ProjectsBy Dennis Ofiara
Several recent tunnel jobs have required special adaptations of hard rock TBMs. Some of the special job conditions are ?no blast? launch requirements, small shafts or launch pits, proximity to existin
Jan 1, 2008
 - 
                    
                On The Lateral Stiffness Of Gearless Mill BearingsBy R. L. Guerguerian
Nowadays, most grinding mills driven by a wrap-around ring motor are operating successfully. Some of the earlier problems could be attributed to the lateral stiffness and stability of their bearings.
Jan 1, 2000
 - 
                    
                Challenges And Triumphs Of A Large-Diameter Microtunnel Relief Interceptor Sewer In IndianapolisBy Jeremy Morris
The city of Indianapolis has more than 25,000 homes currently on septic systems. Many of these systems do not function well because of their age and surrounding soil conditions. As Indianapolis has wo
Jan 1, 2011
 - 
                    
                Preventive Maintenance Policy Supported By A Quality Control Chart And Kolmogorov-Smirnov Tests: Emet Colemanite Mineral Processing Plant, TurkeyBy S. Yerel
In a mineral processing plant, the determination of a preventive maintenance schedule is one of the most important maintenance policies. In this study, to determine the preventive maintenance schedule
Jan 1, 2007
 - 
                    
                Ground-Penetrating Radar for Karst Detection in Underground Stone Mines Mining, Metallurgy and Exploration (af91ef88-58ad-45be-8f21-58666827bf43)By Jonathan Baggett, Nino Ripepi, Amin Abbasi, Richard Bishop, Juan Monsalve, John Hole
This work focuses on the operational and safety issues associated with karst voids in large opening underground mines. Issues include water inrush, structural instability, and engineering uncertainty
 - 
                    
                Cyprus Coppertone Gold Benefits From Computerized Ore Control ProceduresBy Rodrigo Jerez
Advances in inexpensive computer automation led to the development and use of a computerized ore control system at the Cyprus Copperstone Gold Mine near Parker, AZ. These new ore control practices imp
Jan 1, 1991
 - 
                    
                La Estimacion De Costes De Capital PreliminaresBy A. L. Mular
Se revisan brevemente varios procedimientos para el cálculo de coste de capital; no obstante, se discute en preferencia el método del factor estimado. Se proporciona una tabla de costes frente a los d
Jan 1, 1982
 - 
                    
                Evaluation of deep-seated crib block fire tests (7bc9e718-229c-42f8-a8a2-7a3b0ae77860)By M. A. Trevits
The National Institute for Occupational Safety and Health (NIOSH), in partnership with the Mine Safety and Health Administration (MSHA), is conducting research to test, evaluate, improve or modify coa
Jan 1, 2009
 - 
                    
                Mining 1986By J. D. Morgan
Introduction In 1986, the US economy passed the $4 trillion mark. However, the value of domestically processed materials of mineral origin fell slightly to $240 billion. The value of metals produced
Jan 5, 1987
 - 
                    
                Minnesota Iron Mining Industry Remains OptimisticBy William R. Yernberg
The combined 78th Annual Minnesota Section of SME Meeting and 66th Annual University of Minnesota Mining Symposium was held April 19 and 20, 2005, in Duluth, MN. More than 300 mining professionals, i
Jan 1, 2005
 - 
                    
                Selection, Design And Construction Of A Retaining Structure To Support The Primary Crusher Relocation Project At Round Mountain Mine - Preprint 09-022By O. MacIntosh
The Round Mountain gold mine, located 90 km (55 miles) north of Tonopah, Nevada began large-scale production in 1977. During 2008 Round Mountain Gold Corporation (RMGC) relocated the primary crusher
Jan 1, 2009
 - 
                    
                Integration Of Operations And Underground Construction: Sound Transit University LinkBy John Sleavin
As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove
Jan 1, 2010
 - 
                    
                Time to take advantage of SME’s newest member benefitBy None None
Use this month wisely — go online and take advantage of your new member benefit. As an SME member, you can read and download for free all of the full-text papers of the Mining, Metallurgy & Exploratio
 - 
                    
                New Developments In Ground Support Technology For Open-Type Tunnel Boring MachinesBy Steve Chorley
Open-type, or main beam, tunnel boring machines (TBMs) can achieve impressive rates of production. This type of TBM typically outperforms other types of TBMs currently in use around the world. In good
Jan 1, 2011
 - 
                    
                Estimating The Residual Inventory Of A Large Gold Heap Leach PadBy J. Winterton
Estimating the residual metal inventory of large heap leaching operations is desirable for many reasons. Several methods have been tried with limited success. Drilling data from the Valley Leach Facil
Feb 27, 2013
 - 
                    
                An Overview Of Imaging Technologies At Newmont Mine SitesBy A. Adu-Acheampong
Photogrammetry and laser scanning has been employed at a number of Newmont mine sites to mitigate risks associated with conventional structural mapping, determining the geometry of voids from old unde
Feb 27, 2013
 - 
                    
                Composite Materials - Feast Or Famine For Industrial Minerals?By R. C. Freas
Composite materials are finding new applications daily, ranging from automotive parts to synthetic lumber. The variety of applications seems almost limitless. However, these emerging products bring
Jan 1, 2000
 - 
                    
                Niagara Tunnel ProjectBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.
Jan 1, 2007
 - 
                    
                Yule Quarry Back in Business AgainBy Rex E. Loesby
The marble deposits of Yule Creek were first discovered in the late1870s. Minor quarrying occurred between that discovery and the early 1900s. Major development occurred in 1905, when Channing Meek,
Jan 1, 2003
 - 
                    
                Weinbach Soft Ground Tunnel: Lessons LearnedBy Raymond W. Henn, Kent A. Pease, Glen J. Rorison
The paper focuses on construction of a 2.55-km (8,365-ft) long, 2.4-m (8-ft)diameter storm drain tunnel in Evansville, Indiana. The tunnel was driven through saturated soft ground varying from clay to
Jan 1, 2001