Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Dust Control in Surface MinesBy John W. Brown
"Adequate dust control in and around rock drills is a problem that must be solvedfor the health and safety of workers running the drill as well as those working around thedrilling operation This paper
Jan 1, 1999
-
Remotely Piloted Aircrafts (RPAs) as an Everyday Tool for Quarry Planning and Blast Design.By Jose Luis Pineda Villarreal
New technologies emerge every day with practical applications for open pit mining. For every operation, managers need to understand the best way to increase efficiency in drilling, blasting, fragmenta
Jan 1, 2018
-
Flyrock Elimination Program Part 1: Corporate InitiativeBy Scott Scovira
All flyrock incidents have the potential to result in injuries or fatalities that can result in loss of company reputation, license to operate with clients, and bear the exposure to high cost liabilit
Jan 1, 2012
-
Tehachapi, CA, Double-Track Project, Rock Slope Design and ExcavationBy Thomas Pallua, William C. Gates
"Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to im
Jan 1, 2017
-
Vibration Effects on Underground Concrete StructuresBy Frederick Kuhnow
In open pit blasting, energy is released and transmitted through the geology. Negative effects can impact operations and can affect mine production. This paper presents recommendations for blast desig
Jan 1, 2014
-
Ammonium Nitrate Incident at Beirut and Key Learning to Improve Supervision and Management of Explosives Materials in Indonesia ALS IN INDONESIABy Agung Wibowo
The incident of Ammonium Nitrate explosion in Beirut on August 4, 2020, became a wake-up call to Ammonium Nitrate stakeholders for mining and construction regarding the deadly risks associated with ex
Feb 1, 2020
-
Transforming Underground Blasting Operations into Primary Crushing OperationsBy Christopher Jon Preston, Troy Williams, Daniel Roy
There has been significant progress made with narrow vein gold mines in which a second option for crushing has begun to attract attention. To ensure the profitability of a mine that has based its econ
Jan 1, 2019
-
Optimization of Blast Evacuation Zones using the "Exclusion Zone" ModuleBy C. Morel, P. Fredes, L. Rojas
This article presents a comprehensive study on the development and application of the specific module called "Exclusion Zone" created by Orica to determine blast evacuation exclusion zones. This modul
Jan 1, 2024
-
Dispersion Signal Analysis in a Split-Hopkinson Pressure Bar at the University of KentuckyBy Jhon Silva-Castro, Russell Lamont
Understanding the behavior of materials subjected to high strain rate conditions is of fundamental importance to the mining industry. Several stages of the mining process involve high speed loading ra
Jan 1, 2017
-
Charleroi Locks and Dam - Old River Wall Explosive DemolitionBy David Harrison
The Charleroi Locks and Dam (Figure 1) was completed in 1932 and is located on the Monongahela River, approximately 22 miles (35 km) south of Pittsburgh, in Charleroi, Pennsylvania. It is comprised of
Jan 1, 2015
-
Evaluation Of Suitability Of Permitted Delay Detonators Vis-avis Their Delay Timing For Use In Underground Coal MinesBy Harsh Kumar Verma
Blasting off-the-solid is the most commonly used method during development of galleries in Bord and Pillar method of underground coal mining. In this method, only P5 explosives are used with permitted
Jan 1, 2008
-
Automation of Rock Fragmentation AnalysisBy Hairong Zeng, Matthew Baumann, Shahram Tafazoli, Edmond Chow
Measurement of rock fragmentation has evolved from a completely subjective and manual process to a statistically objective and semi-automated process. However, ultimately, the vision is to achieve a s
Jan 1, 2012
-
Federal Blaster Certificate ProgramBy Kenneth Eltschlager
Blasting represents the highest risk of any surface coal mining activity that could result in injury and/or property damage off the permit area. In addition, blasting related issues e.g. flyrock, vibr
Jan 1, 2010
-
Direct Stress Monitoring of Pipelines and Development of Limitations – A Case StudyBy Travis A. Davidsavor, David A. Provost
A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep
Feb 1, 2020
-
Journal: 100 Years / A PRIMER ON EXPLOSIVES FOR COAL MINERS Bulletin 17 by Charles E. Munroe & Clarence Hall U.S. Bureau of Mines, Washington, D.C.By Robert Hopler
Of the common causes of the larger mine accidents, such as falls of roof and coal, gas and dust explosions, mine fires, and the misuse of explosives, all of which are often closely related, each must
Jan 1, 2012
-
Direct Stress Monitoring of Pipelines and Development of Limitations – A Case StudyBy Travis Davidsavor, David Provost
A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep
-
Disposal of Old Munition - Part 1. - A Research Method for the Estimation of Heavy Metal Deposit Range of Open Sur-face Mass DetonationsBy Martti Hagfors, Mervi Hokkanen
The Finnish Defence Forces has destroyed obsolete and spoiled ammunition in open surface mass detonations at Hukkakero fell, in municipality of Kittilä, in Lapland since 1988. The de-struction method
Jan 1, 2011
-
Rock Fragmentation Modeling Using a Neural Network-Based Approach in a Gold Open Pit MineBy Cesar Guerra, Alejandro Rojas, Dr. Jhon Silva, Luis Velasquez
The ANN method is applied to predict the P_80 size in one open pit gold mine in Peru. The ANN was implemented in Matlab programming language, and the results from the ANN are compared with data obtain
Feb 1, 2020
-
Median and Mean in the Kuz-Ram ModelBy CVB Cunningham
"The Kuz-Ram model as originally proposed included an error in assuming that the mean fragmentsize predicted by Kuznetsov’s equation was actually the 50% passing size. In 2003 Spathis began discussion
Jan 1, 2016
-
The Effects of Run-up on an Explosively Formed ProjectileBy Jason Baird, Joshua Hoffman, Phillip Mulligan
The purpose of this report is to address the method of reducing the overall explosive weight of Explosively Formed Projectiles (EFPs) while still achieving satisfactory performance. This reduction is
Jan 1, 2010