Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Resonant Pile Driving - Part I - The Promise & The Reality - Part II - Soldier Pile Installation - Light Rail Transit - Buffalo, New York - 1. Historic Background.

    By D. R. Dance

    The Resonant, or as it has more commonly come to be known the 'Sonic' Pile Driver, dates back to the early 1960's, when prototypes were produced by Charlie Guild, of Providence, Rhode I

    Jan 1, 1987

  • DFI
    Application Of CFA Piles For Foundation Of A Shopping Centre On Long-Standing Dumping Ground

    By Joanna Bzówka

    Nowadays, there are some new requirements for the supermarket floors. The floors are loaded by high point- and moving-loads. In spite of this fact, it is necessary to ensure the stiffness of the floor

    Jan 1, 2006

  • DFI
    Rapid Vibratory Pile Driving Hammer For Deep Foundation

    By Li Tiemin

    It is one of important tasks in research of vibratory pile driving to increase speed of pile driving and depth of pile driving -- this means to increase capability of penetrating hard layer. In genera

    Jan 1, 1991

  • DFI
    Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us

    By Gustavo E. Armijo

    This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose

    Jan 1, 2002

  • DFI
    Route 49 (Penns Neck Bridge) Over Salem River

    By James E. Maccariella

    Replacement of an existing movable bridge with a new low level fixed bridge would not accommodate potential future navigation traffic. In order to replace the existing bridge in a cost effective m

    Jan 1, 2005

  • DFI
    Building The High-Pressure Jet-Grouting Curtains For Deep Foundation Ditch In The Seaside Area

    By Lin Daoyi

    In this paper, we have adopted the high pressure jet-grouting curtains to seal the sea-water, and to consolidate the wall of the well for deep foundation diteh, make a pladge of building and construct

    Jan 1, 1991

  • DFI
    Interpreted Residual Load In An Augered Cast-In-Place Pile

    By Timothy C. Siegel

    Accurate representation of the geotechnical resistance distribution is critical in evaluating the performance of piles and pile groups for design. A current practice is to infer the geotechnical resi

    Jan 1, 2009

  • DFI
    Working Platforms In Geotechnical Jobs: Recommendations For Execution And Maintenance

    By Gustavo Armijo

    Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha

    Jan 1, 2006

  • DFI
    An Analysis Of Interaction Between Laterally Loaded Structure And Soil

    By Zhu Tonghao

    A method of calculating anti-slide pile, sheet pile, underground diaphragm and structure with anchors etc. is proposeed in the paper. The effect of the various layers of soil, anchors and bracings etc

    Jan 1, 1991

  • DFI
    Non-Linear Analysis Of Laterally Loaded Piles: Calibration Of A New Method

    By Vasileios A. Drosos

    The response of pile foundations to lateral loads is an important factor for the successful performance of several critical structures. A new numerical code for the analysis of single piles under late

    Jan 1, 2006

  • DFI
    Wave Equation Technique For Estimating Driven Pile Capacity

    By Luo Yang

    A one-dimensional wave equation based algorithm for estimation of shaft and toe resistance of driven piles using High Strain Testing (HST) data is presented. The pile is represented by a uniform elast

    Jan 1, 2006

  • DFI
    Drilled Piers With Base Preloading By Grouting - 1. Introduction

    By Boleslaw A. Klosinski

    Drilling of a pier hole is accompanied with stress releasing in the surrounding soil and often with loosening of soil at the pier base. In effect the drilled piers are more deformable than driven pile

    Jan 1, 1995

  • DFI
    Lower Risks With ECR®/EFT®-Measurements In Underground Constructions

    By Patrick P. A. Wolfs

    In the summer of 2000, the ECR®/EFT® was first introduced in the Netherlands. After the first project a field test was performed together with other geophysical methods to prove the liability of these

    Jan 1, 2006

  • DFI
    Effect Of Slope On P-Y Curves; Under Passive Loading

    By K. [Muthukkumaran

    An extensive program of laboratory model tests was undertaken to study the effect of slope on p-y curves under passive loading in dry sand. The paper concerns the method developed in a series of labor

    Jan 1, 2006

  • DFI
    Skilled Operative Training For The Foundation Industry - Summary

    By Geoffrey Birch

    A skilled and efficient workforce is a pre-requisite for the success of modern construction companies. The drive for improved performance, innovation and best value must be matched by the enhanced ski

    Jan 1, 2000

  • DFI
    Ground Improvement Design and Construction for Seattle’s Elliott Bay Seawall Replacement and Retrofit

    By Andrew Malinak, William Perkins

    Seattle’s Elliott Bay Seawall protects the 1½ miles of downtown waterfront between South Washington and Broad streets. The seawall supports the urban waterfront and infrastructure, including the Alask

    Jan 1, 2018

  • DFI
    Design Optimization - Drilled Shafts Installed In Sand, Gravel And Cobble Formation

    By Emad Farouz

    The resistance of very dense glacial outwash formations consisting of sand, gravel and cobble formations can be quite high, and techniques for measuring the strength and deformation properties often c

    Jan 1, 2006

  • DFI
    Resonance Test On Piles - Synopsis

    By Y. Z. Xu

    This paper presents a new dynamic method called Resonant Pile Test (HPT) for evaluating bearing capacity of pile. The basic conception of RPT is given in brief and the measuring system is also introdu

    Jan 1, 2010

  • DFI
    A Review Of Diaphragm Wall Construction-White Swan Hotel ? Synopsis

    By Q. M. Huang

    In 1979 our company undertook the project of infra-structural work of White Swan Lake Hotel, (International class ) Guangzhou. Visit to the site showed that it was situated at the riverside, covering

    Jan 1, 2010

  • DFI
    Design Of Deep Foundations Over Shallow Mine Workings

    By Tianfei Liao

    Extensive site investigations revealed that abandoned shallow mine workings exist under a site planned for construction of a major new facility. Since the mine voids were susceptible to collapse, they

    Jan 1, 2009