                Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected PilesBy A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
 - 
                    
                Determination Of Pile Damage In Concrete PilesBy Gerald E. H. Verbeek
As the number of driven concrete piles with Embedded Data Collectors increases, it has become possible to compare the widely used Beta Method to assess pile damage (using the change of pile impedance)
Jan 1, 2011
 - 
                    
                Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, GujaratBy Ekhlaq A. Khan
"The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a
Jan 1, 2017
 - 
                    
                Analyses On Laterally Loaded Cast-In-Place Concrete Piles ? SynopsisBy Makoto Kimura
Failure tests on laterally loaded single and pile group are analyzed with a 3-dimensional elasto-plastic finite element program. In the analysis, the mechanical behavior of the ground is supposed to b
Jan 1, 1996
 - 
                    
                Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - SummaryBy Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
 - 
                    
                Comparison Of Static Load Test And Dynamic Pile Testing ResultsBy Patrick J. Hannigan
A comparison of 40 statically and dynamically load tested piles was performed to evaluate the variation between testing methods. This evaluation indicated an agreement of 10% to 15% could be obtained
Jan 1, 1987
 - 
                    
                Modelling For Consolidation Around The Pile TipBy Emöke Imre
A point-symmetrical linear coupled consolidation model with displacement boundary condition is suggested for the description of the consolidation around the pile tip after pile penetration. Analytical
Jan 1, 2002
 - 
                    
                The Quality Control Of Pile Foundations Of Tall Buildings In ShenzhenBy Li Keqiang
Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on
Jan 1, 1991
 - 
                    
                Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation RemediationBy Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
 - 
                    
                Application Study On Non-Destructive Static Test PileBy Han Xuanjiang
Through whole analysis of static testing piles information of a teaching building, this paper put for ward that when the ratioes of unload rebound amount to residual deformation and to total settlemen
Jan 1, 1991
 - 
                    
                Site Solutions For The Pisa Tower Remediation - 1 - IntroductionBy Paolo Heiniger
The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter
Jan 1, 2000
 - 
                    
                Wharf Reconstruction At Gasps Sandy Beach - HistoricPort Gaspé is located on the back side of Gaspé bay and is protected by a natural sand barrier with a length of 2,5 km, from which it got its name, Gaspé Sandy Beach (1). Since 1904 the Gaspé regi
Jan 1, 1987
 - 
                    
                Micropile-Supported Wall To Resist Lateral Deflection Of Existing Railroad Bridge AbutmentBy Samer R. Rabab?ah
As part of the PHX Sky TrainTM project at Phoenix Sky Harbor International Airport in Phoenix, Arizona, the existing traffic lanes at the 44th Street underpass below the Union Pacific Railroad (UPRR)
Jan 1, 2011
 - 
                    
                Practical Aspects Of Compensation Grouting ? SynopsisBy Philip J. H. Ball
The new application and development of grout jacking processes has combined, over the last decade in particular, to provide a method by which the effects of new underground construction on superficial
Jan 1, 2000
 - 
                    
                Application Of, And Experience With, An Electronically-Controlled Hydraulic Piling Hammer ? 1 ? IntroductionBy D. Arentsen
Changing environmental laws, new operating requirements and the increasing accuracy with which the bearing capacity of driven piles can be calculated have all led to the development of hydraulic pilin
Jan 1, 1987
 - 
                    
                Update Of Aashto Standard Specifications For Highway Bridges: Division II--Construction - Preliminary Draft Final Report Vol. II - Specifications And Commentary - Driven Foundation Piles - 4.1 DescriptionThis work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles
Jan 1, 1989
 - 
                    
                An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The ProblemBy M. Zanotto
[ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole
Jan 1, 1992
 - 
                    
                Man - Organisation - Technology - Proposals For Optimising Preventive WorkBy Walter Ensinger
Working safely means working cost-effectively. Every "dangerous occurrence" and - even more so - every industrial accident causes disruptions in the planned course of construction. Besides moral and l
Jan 1, 2006
 - 
                    
                A Cut And Cover In Stiff Clay In Eurre-France - SynopsisBy R. Stenne
This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly
Jan 1, 2000