Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine CaseBy S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan
"Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou
Jan 1, 2003
-
An Improved Definition of Rock Quality Designation, RQDcBy L. Li
The rock quality designation (RQD) was initially introduced by Deere (1963) for civil engineering. But, its application has been largely extended to rock mechanics and has become a fundamental paramet
May 1, 2009
-
Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.By Bruno Lemelin
Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther
May 1, 2004
-
pH Control of Mattagami Lake and Orchan Mines EffluentsBy K. G. Stowe
"1. Introduction Mattagami Lake Mines and Orchan Mines operate zinc copper mines adjacent to one another near Matagami, Quebec, situated approximately 300 kilometres north-east of Rouyn-Noranda. (Note
Jan 1, 1979
-
CANMET-MMSL Alternative Binder TechnologyBy Kristie Tarr
Portland cement is primarily used to solidify backfill in underground mine workings and it represents a major cost in mining operations. CANMET-MMSL has invented an alternative binder technology that
Oct 1, 2010
-
Carbon Dioxide Use for pH Control at Greens Creek MillBy Tim Martin, Dave Tahija
"In April, 2014, Hecla's Greens Creek mill, near Juneau, Alaska, switched from sulphuric acid to the use of dissolved carbon dioxide for lead flotation circuit pH control. The Greens Creek mine uses p
Jan 1, 2016
-
Maximising Concentrate Revenues at the Xstrata Copper Kidd ConcentratorBy G. R. Morin, A. R. Leggett
"In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous
Jan 1, 2013
-
Milling of Noranda Process SlagsBy P. W. Godbehere, B. W. Brooks
"This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced
Jan 1, 1977
-
Copper Concentrate Quality Improvements at Myra Falls (40th Annual Meeting of the January 22 to 24, 2008 Canadian Mineral Processors Ottawa, Ontario, Canada )By Trevor Yeomans
"NVI Mining’s Myra Falls Operation is a forty year old underground mining operation feeding a 4000 mtpd concentrator.The current Mill, built in 1985, was designed to process a large massive sulphide o
Jan 1, 2008
-
Control System Performance Assessment-Best PracticesBy Michel Ruel
"PID loops – also known as base layers or regulatory controls – form the foundation of any plant’s control layer and it is generally accepted that PID loop health has a direct impact on the plant’s bo
Jan 1, 2011
-
The Paracatu Expansion Project III ? Building the Largest Gold Concentrator of the WorldBy Luis A. Tondo
The Paracatu Expansion Project III in Brazil was implemented between 2006 and 2008 to increase the existing capacity from 20 to 61 Million tons per year of gold ore treatment. This expansion led the B
May 1, 2009
-
Evolving Equipment Health, a Rio Tinto Case StudyBy Daniel D. M. Adams
Over the last 100 years industry in general has been trying to advance the ability to maintain systems through management processes. Mining has looked to utilize onboard data systems in our mobile min
May 1, 2011
-
Dust Control at Granisle CopperBy L. W. Hamel
"DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ
Jan 1, 1976
-
Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and AutomationBy Christoph Miller
About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M
Oct 1, 2009
-
Maintenance, Metallurgy and MiningBy C. W. Taylor, F. L. Martin
"THE DICTIONARY defines Metallurgy as the ""science or art of separating metals from their ores and refining them for use"". In these days, however, such a definition is not detailed enough.The modern
Jan 1, 1960
-
Determination of Metal and Mineral Flotation Performance at one of Falconbridge’s Base Metal OperationsBy Dominic Fragomeni, Tony DiFeo, Martyn P. Hay
"As part of an investigation into flotation modelling of industrial scale operations, Falconbridge Ltd organised a “blind” test of the SUPASIM flotation model developed by Eurus Mineral Consultants (E
Jan 1, 2006
-
Stratified Sampling of Drill CoreBy Norman O. Lotter
Drill core is preferred as the sample material for metallurgical and mineralogical characterisation and flowsheeting of an orebody. The question arises as to how to do this at the economic optimum, si
Jan 1, 2010
-
Some Approaches in Improved Fine Particle Flotation and SeparationBy Mohamed Ourriban, Yongjun Peng, Qi Liu, Denis Cotnoir
"In the flotation of fine particles, there are two difficulties in general: low recovery of valuable minerals and high recovery of gangue minerals. The low recovery of fine valuable minerals is attrib
Jan 1, 2006
-
A Novel Approach to Recover Precious Values from Low-Grade Canadian OresBy V. I. Lakshmanan, D. A. Mackie
"1. INTRODUCTIONIn the past two decades, low-grade gold and silver ore bodies in the United States have been exploited by heap leaching, primarily with sodium cyanide solutions. This method has proven
Jan 1, 1989
-
Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)By Dayang Datu Khalil, Charle Amoah, Fred Kock
Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe
Jan 1, 2012