  • CIM
    Towards AG/SAG/ball mill on-line performance monitoring

    By S. Caron, P. Radziszewski

    Industrial practice in mineral processing shows that an important problem in understanding and monitoring in-mill parameters is due to the lack of fundamental knowledge and appropriate sensors. Howeve

    Jan 1, 2004

  • CIM
    The Management of the Development Process of the Structure of Large-Scale Production and Transportation Systems

    By Buse Florian

    This paper presents the specific features of the large-scale production and transportation systems (LSPTS), describing the main notions and characteristics of the LSPTS elements. A methodologically un

    Oct 1, 2009

  • CIM
    Improved Hydrogen Cyanide Detection with Laser-Based Line-of-Sight Gas Detectors

    By Klaus Tietz, Hamish Adam, John Selby, Ian Glazier, Brian Sinfield

    "Room-temperature tunable diode laser (TDL) analyzers are gaining in acceptance for highly critical safety monitoring applications in a variety of industries. This paper describes the testing, evaluat

    Jan 1, 2011

  • CIM
    Paste Fill Plant Operation at the Louvicourt Mine

    By Benoit Bissonnette

    "The need for production of a competent fill was recognized early by the project partners. Consequently, a 4000 Ud paste fill plant was constructed and commissioned in early August 1994.In order to fi

    Jan 1, 1996

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001

  • CIM
    SUPASIM: A Methodology to Predict Plant Performance from Laboratory Data

    By C. J. Martin, M. P. Hay

    "A methodology was developed in the mid-1980’s to predict plant performance from standard laboratory flotation tests. The technique is based on a simple, empirical kinetics model, and is tailored for

    Jan 1, 2004

  • CIM
    Progress on Stainless Steel as Bipolar Electrode Plate Material for PEM Fuel Cells

    By R Zavadil, S Kuyucak, F Fazeli

    Proton exchange membrane (PEM) fuel cells generate electricity by reacting hydrogen and oxygen. A thin, bipolar electrode material provides a medium for electron exchange with the electrolyte, alterna

    Jan 1, 2014

  • CIM
    Treatment of Carnallite Potash Ores by Selective Flocculation

    By Samantha Beeson, Collin Poole

    "This paper examines the development of two new selective flocculation techniques for recovering KCI values from low grade carnallite potash ore.Direct recovery of KCI was achieved using one of two mi

    Jan 1, 1997

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Geometallurgical Characterisation and Representative Metallurgical Sampling at Xstrata Process Support

    By J. Sliwinski, J. Oliveira

    "The application of geometallurgy and corresponding sample selection can take on several formats within industry. Current practice can range from a strictly geostatistical approach to one in which geo

    Jan 1, 2013

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • CIM
    Modified Stability Graph Method with a new Rock Stress Factor

    The Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome

    May 1, 2011

  • CIM
    Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer Process

    By Yannis Faitakis, Simon Bergeron

    "This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B

    Jan 1, 2003

  • CIM
    Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, China

    By Q. Zhang

    The necessary capability of the gravity transportation pipeline system for cemented coal gangue backfilling at the Suncun Coal Mine, China, is about 74.4 m3?h-1 according to mining production and work

    May 1, 2007

  • CIM
    A liquefaction incident in a fill raise: A case study

    By F. Hassani, K. Moozar, J. Ouellet, P. Gauthier

    "This paper describes a sudden spill of waste rock used for backfilling from a waste pass at an underground mine in Canada, thus causing a major failure/accident. The mine operator immediately launche

    Jan 1, 2004

  • CIM
    Design Considerations for Mine Waste Management at the Meadowbank Gold Project

    By Cameron J. Clayton

    Cumberland Resources Ltd. is currently planning to develop the Meadowbank Gold Project located some 70 km north of Baker Lake, Nunavut in the eastern Canadian Arctic region. The Meadowbank Gold Projec

    May 1, 2004

  • CIM
    Frother and Collector Effects on Flotation Cell Hydrodynamics and Their Implication on Circuit Performance (c615fbc8-d724-48ab-a36a-7fd85aca4c5e)

    By J. E. Nesset

    "Significant progress has been made over the past few years on characterizing and understanding the hydrodynamic properties of frothers and collectors and their effect on flotation performance. This n

    Jan 1, 2010

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003

  • CIM
    The New Britiannia Project a TVX Gold Inc. /High Rlver Gold Mines Ltd. Joint Venture

    By Roy Lindsay, Paul O'Hara, Gary Halverson

    "The New Britannia Minesite is located in Snow Lake, Manitoba, 420 miles north of Winnipeg (figure 1). The mine previously operated from 1949 to 1958 extracting some 5.39 million tons of ore at a 0.15

    Jan 1, 1996

  • CIM
    Comparisons of the Geology and Proposed Underground Mining Methods of the Panda and Koala Kimberlites at the EKATI Diamond Mine

    By Peter A. Oshust

    The EKATI Diamond Mine has successfully completed the development and commissioning of the Panda Underground Project to extract the ore below the Panda open pit. The dominant kimberlite domain of the