Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mine Waste Management Planning for an Arctic Environment

    By William J. Purdy

    Successful design, operation and completion of a surface waste management facility for a diamond mine located in Canada?s northern environment requires careful planning to minimize short and long term

    May 1, 2004

  • CIM
    The need for technology standards for mobile equipment in the mining industry

    By T. Skinner, M. Sahebkar

    "In recent years, the mining industry has been inundated with new technologies and software systems to aid in productivity improvement. Accompanying this increased level of technology and computer sys

    Jan 1, 2003

  • CIM
    Future Raw Material Needs of The Canadian Steel Industry Some Problems and Opportunities

    By R. J. Goodman, P. Lafleur

    This paper presents a current interpretation and projections of recent statistics on raw materials availability based on familiarity with the Canadian steel industry and its development. Problems and

    Jan 1, 1976

  • CIM
    Evolution and Optimization of the Gravity Recoverable Gold Test - In memory of Professor Andre Robert Laplante - 1953-2006 Outstanding Mineral Processing Professor, Engineer and Scientist

    By Sunil Koppalkar, Liming Huang

    "Since late 1980s the research group led by late Professor Andre Robert Laplante at McGill University undertook fundamental studies and applied research of the Knelson Concentrator (KC) and developed

    Jan 1, 2007

  • CIM
    Fuel cell versus diesel loader operation: Cost-benefit analysis study

    By M. C. Bétournay

    Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles an

    May 1, 2005

  • CIM
    Fuel cell versus diesel loader operation: Cost-benefit analysis study (6b80a653-d0e2-439c-a343-5c05fb591d61)

    By G. Righettini, G. Desrivières, P. Mousset-Jones, R. Lacroix, M. C. Bétournay, P. Laliberté, S. Hardcastle

    "Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles a

    Jan 1, 2005

  • CIM
    Effect of Biological Gas Generation on Oil Sand Fine Tailings

    By C. Guo

    The Mildred Lake Settling Basin (MLSB) is the largest disposal site for mature fine tailings (MFT) at the Syncrude Canada Ltd oil sands plant. Over the past years (since 1997), there has been a marked

    Apr 1, 2005

  • CIM
    Reducing Selectivity in Narrow-Vein Mining through the Integration of Underground Pre-concentration

    By Andrew Bamber

    The introduction of pre-concentration technology into the underground narrow-vein mining scenario has the potential to change the entire economics of utilizing bulk-mining methods in these situations.

    Oct 1, 2004

  • CIM
    Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling Operation

    By Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe

    "Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan

    Jan 1, 2011

  • CIM
    Framework for optimizing components in an oilwell cement slurry design

    By D. Getzlaf

    "Oilfield cementing has been utilized in the industry since the turn of the century. Originally, wells were shallow and criteria for well integrity were somewhat limited. Since that time, wells have s

    Jan 1, 2004

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    Evaluation of the Quebec Cartier Mining Pelletizing Plant Grinding Mill Efficiency as a Function of Mill Speed

    By Caroline B. Chapleau, Mélanie Proulx, Claude Bazin, Gaétan Lavoie

    "Quebec Cartier Mining operates a pelletizing plant in Port-Cartier, QC. Grinding, agglomeration and pellets induration are the three main steps in the preparation of iron oxide pellets. In 1998, foll

    Jan 1, 2000

  • CIM
    Strain Distribution in the Bending-Under-Tension Test

    By D. K. Uko

    In the stretch-bend or bending-under-tension test, a strip is rigidly clamped and restrained at each end and bent by central transverse loading using a radiused punch: The strip deflection at failure

    Jan 1, 1977

  • CIM
    Suitability of PEM fuel cells for underground mining vehicles

    By M. C. Bétournay

    Hydrogen fuel cells are a known technology, having been applied to stationary (e.g. equipment, buildings, and power plants) and vehicle applications (e.g. transit buses and space shuttles). There is c

    May 1, 2005

  • CIM
    Suitability of PEM fuel cells for underground mining vehicles (35a3b3ff-1d4d-456b-a989-2c3e85f551b7)

    By G. Bonnell, W. Lidkea, M. C. Bétournay, E. Edwardson

    "Hydrogen fuel cells are a known technology, having been applied to stationary (e.g equipment, buildings, and power plants) and vehicle applications (e.g transit buses and space shuttles). There is cu

    Jan 1, 2005

  • CIM
    Implementing Safe Production at Kittilä Mine

    The information in this document has been prepared as at February 16, 2011. Certain statements contained in this document constitute ?forward-looking statements? within the meaning of the United State

    May 1, 2011

  • CIM
    The Recovery of Copper from Copper Oxide Ore using Heap Leaching, Solvent Extraction and Electrowinning

    By R. H. Walton

    "In recent years the recovery of copper from low grade oxide ores has received widespread attention. The cost of treating such ores using conventional technology, such as milling and flotation, is fre

    Jan 1, 1990

  • CIM
    Applying a Customer-Based Approach at Vale’s Clarabelle Mill

    By A. Taylor, J. Shelegey, H. Sullivan, J. Doucet

    "Historically, performance at Vale’s Clarabelle Mill was measured by Mill throughput and Mill recovery. After the economic collapse in 2008, a series of reviews were performed to drive improvements in

    Jan 1, 2012

  • CIM
    Intelligence for Grouting Balance

    By J. A. López-Molina, S. García, V. Castellanos-Pedroza

    "Grouting aims to reduce the permeability of rock mass below a predetermined value and has been widely used in rock engineering field for a long time. However, the injection procedure needs several em

    Jan 1, 2015

  • CIM
    Case Studies with the Falcon Concentrator

    By G. Naud, J. Robitaille, M. Buonvino, A. Veltmeyer, A. R. Laplante

    "A B6 Falcon concentrator was tested on several systems: a synthetic magnetite-silica ore, a massive sulphide gold-copper ore, a fine gold-pyrite-silica flotation tail, and a high grade gold ore in a

    Jan 1, 1993