Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Benefication of chrysotile by wet processing-the resource without the hazard

    By Andrews JRG

    Chrysotile asbestos is a valuable resource. Used as a reinforcement in asbestos cement, products are obtained which are cheap, are not attacked by vermin, do not rot or support growth of fungi and

    Jan 1, 1986

  • AUSIMM
    Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?

    By M Berry

    Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w

    Aug 18, 2014

  • AUSIMM
    Enhancing Risk Management in Strategic Mine Planning through Uncertainty Analysis

    By C Fricke, R Wood, P Velletri

    "In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ

    Nov 24, 2014

  • AUSIMM
    Effect of Mineral Density for Milling Magnetite Ores

    By P Holtham, W Valery, P Baguley, A Jankovic

    There is a growing interest in magnetite ores because of the increasing demand for this commodity. With these ores, there is significant cost associated with milling the ore to fine sizes using ball m

    Jul 13, 2015

  • AUSIMM
    Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mine

    By C A. Brannon, C A. Dipas, H A. Vega, D Villa

    The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full

    Oct 16, 2017

  • AUSIMM
    Organic Management Structure – Its Advantages in a Mining Consultancy

    By G Pitkin, D Sorley

    The purpose of any consultancy is to provide a superior service for their client. Organisational structure is a key element in providing this service and differentiating between consultants.In an orga

    Jun 22, 2016

  • AUSIMM
    Quantifying the quality of cable bolt installation by acoustic testing

    By M Hawkes, Z Ji Gang, Z Ming, R Hassell

    As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif

    Mar 15, 2021

  • AUSIMM
    30 years of seismic system design, implementation and interpretation

    By J Player, G Sweby, S Webber, E Jones

    Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy

    Nov 29, 2022

  • AUSIMM
    Asymmetric Blasting: A Rock Mass Dependent Blast Design Method

    Blasting has been the most frequently used method for rock breakage since black powder was first used to fragment rocks, more than two hundred years ago. This paper is an attempt to reassess standard

    Jan 1, 2001

  • AUSIMM
    Dynamic Interpolation – Estimation in a Folded Environment at the Cosmo Deposit, Northern Territory, Australia

    By A Finch, C Pridmore

    The Cosmo Project falls within the Archaean to Palaeo-Proterozoic Pine Creek Orogen, one of the major mineral provinces of Australia.The Cosmo Deposit is interpreted to be a series of steep north-west

    Aug 18, 2014

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    Tunnel Boring Machine Usage Speeds up Development at Stillwater Mine

    By D Willis, A Shanahan, C Jacobs, T Luxner

    The application of tunnel boring machines (TBM) for reef mining is a unique practice with benefits over current mining methods given the right geology and geometry of the orebody. The Stillwater Minin

    Sep 17, 2014

  • AUSIMM
    Getting underground: design and construction of a portal in a pit with moving walls

    By J Player, P Evans, G Sweby

    Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c

    Mar 15, 2021

  • AUSIMM
    An Integrated Mine Development and Supply System

    In the face of intense global competition and other business pressures on coal miners, ongoing quality initiatives and continuous process improvements are needed to enhance business performance. By vi

    Jan 1, 1998

  • AUSIMM
    Choosing an Effective Dust Suppressant

    Choosing an Effective Dust Suppressant

    Sep 13, 2010

  • AUSIMM
    An Approach to Optimising Coal Mine Design for Sustainable Development

    By M E. Karmis

    Traditional coal mining planning seldom considers key æsustainability factorsÆ such as: societal impacts in the area; jobs (both created and lost); dislocation of towns and residences; impact on neigh

    Jan 1, 2009

  • AUSIMM
    Greater Use of Geoscan On-belt Analysis for Process Control at Sepon Copper Operation

    By T D. Jolly, L A. Balzan, A R. Harris, Z Bauk

    "The availability of real-time data in any process control system is critical for effective management of that system. At MMG LXML Sepon Copper Operation in Lao PDR, controlling the copper grade of th

    Oct 10, 2016

  • AUSIMM
    Grinding Circuit Improvements at Evolution Mining’s Edna May Operation

    By D Atheis, S Williams, A Dance, D Taplin

    "Resurrected from its former life at the Big Bell operation, the grinding circuit at Evolution Mining’s Edna May operation in Western Australia has many a story to tell. The task of optimising a plant

    Sep 1, 2014

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    Production Variance Benchmarks and Their Use in Project Evaluation and Due Diligence

    "Cash flow modelling during project evaluation is enhanced when probabilistic methods are applied to the inputs. One of the important inputs is the quarterly production profile. Typically, the steady-

    Mar 8, 2016