Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dry versus Wet Magnetic Separation – Horses for Courses

    By J Elder

    Magnetic separation equipment has long been used to upgrade and beneficiate a wide variety of minerals and materials. Over the years, significant advances in both wet and dry magnetic separators have

    Oct 5, 2011

  • AUSIMM
    Environmental Impact Modelling for In Situ Leaching of Uranium

    By A Roshal

    It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th

    Jan 1, 2008

  • AUSIMM
    Investigating the Effect of Different Block Dimensions on the Economic Life of Open Pit Mines

    By P Moarefvand, M Osanloo

    The anticipated economic life of the mine, which defines the rate of mine production, is dictated initially by the design capacity of the mill/concentrator and the production capacity of the mine rela

    Sep 26, 2011

  • AUSIMM
    Dynamic concepts for mine to mill operation and optimisation

    By R Pax

    Feed ore variability, the major disturbance into a mineral processing plant receives considerable attention operationally, and at research and strategic levels to ensure that the throughput of the ore

    Nov 21, 2018

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case Study

    By A Campbell

    Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en

    Nov 8, 2011

  • AUSIMM
    Simulation of Flotation Feed Pre-Classification

    By J Arola, B Kettunen, W M. Bond

    Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s

    Jan 1, 2005

  • AUSIMM
    Dredging fine tailings

    By S H. Burgmans, B Anderson

    This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min

    Jul 1, 2021

  • AUSIMM
    A risk-based approach to drainage design standard selection for mine rehabilitation and relinquishment

    By A Densten, C Gimber

    Surface water management and drainage is a key aspect of mine rehabilitation and closure planning. In the authors’ experience, drainage related problems are amongst the most common forms of failure in

    Jul 25, 2018

  • AUSIMM
    The Evolution of Diamond Drilling Practices at Olympic Dam

    By J Taylor, A Dubowik

    To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a

    Aug 18, 2014

  • AUSIMM
    A New Tool for Extensometer Data Analysis and Improved Understanding of Geotechnical Risk Factors

    By M Szwec, P Corbett, P Sheffield

    Centennial Coal operates the Springvale and Angus Place longwall mining operations that extract coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale and Angus Place

    Nov 5, 2014

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    Adaptive management in deep sea mining – looking like you know what you’re doing when it’s never been done before

    By R L. Grogan

    Regulators of deep-sea mining projects are becoming increasingly hesitant about the concept of adaptive management as a tool to facilitate compliance and continuous improvement. Adaptive management is

    Jul 25, 2018

  • AUSIMM
    Hydraulic Handling In Mining-Fully Automatic Large-Scale Test Unit On A Practical Scale (7820d56d-e8c9-4696-85e5-160c9e5556c0)

    The process of hydraulic transport through pipelines, world-wide well known for the trans- port of fine-grain solids is also being used to a greater extent in mining for the handling of 1rimarily c

    Jan 1, 1980

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    An Evaluation of Fracture Toughness of Coal Measures Rocks

    By Pathan AG

    This research work is concerned with an investigation of the fracture toughness of sandstone, siltstone, and coal. Tensile failure trades have been examined with three different specimen geonetrie

    Jan 1, 1986

  • AUSIMM
    The Calculation of the Fragmentation of Rock from Cratering

    The fragmentation of whole rock by blasting has an influence on the subsequent loading, hauling and crushing operations. However, no method of calculating the frag- mentation has yet been developed

    Jan 1, 1977

  • AUSIMM
    Commissioning and Operation of the Pressure Oxidation Circuit at Porgera, PNG

    Porgera is located in the Central Highlands of Papua New Guinea. Porgera Joint Venture treats a high grade epithennal gold deposit. Most of the gold occurs as submicroscopic particles in a sulphide ma

    Jan 1, 1992

  • AUSIMM
    Guidelines for Economic Evaluation of Projects

    By P Card

    “Let’s get discipline and quality into easy to understand evaluations!” Project Managers and MetPlant Operators accept poor quality evaluations because they are generally unaware of what they should

    Aug 8, 2011

  • AUSIMM
    Deformation Mechanisms of the South West Rail Link Underpass beneath the Hume Highway

    By S J. Clarke, C S. Walker

    The South West Rail Link (SWRL) project involved construction of a rail line to service new residential areas in south-west Sydney. The 11 km rail line is conveyed through a short tunnel at shallow de

    Sep 17, 2014