Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The value of data – getting it right from the start!By S L. Martin, M Wimberger
The binary indicator coding of assay and lithological data according to a single criterion or multiple criteria is a powerful technique for representing mineralised shapes through the modelling of pro
Mar 22, 2022
-
Integrated Resource Asset Management - A Holistic Approach to Information Technology in Mining OperationsOver the last ten years geological and mining software products have evolved greatly. Software companies developing such products have focussed almost exclusively on the development of technical aspec
Jan 1, 1999
-
The Consequences for Pillar Stability of Zero Confining Stress Brought about by Forced or Natural DrainageBy I Gray
This paper examines the effects of the changes in stress that a coal may undergo as part of the drainage process. As a consequence of this, some coal seams will come to the situation that they have ze
Nov 5, 2014
-
Direct Copper SmeltingDirect smelting of copper in a single vessel has long been the extractive metallurgist's dream. Such a process offers the important alvantage. of (i) maximum use of the energy available from oxid
Jan 1, 1985
-
Design of Sample Plants ù Getting it Right First TimeThe basic rule for correct design of a sample plant is that all parts of the material being sampled must have an equal probability of being collected and becoming part of the final sample for analysis
Jan 1, 2005
-
A Strain-based Failure Criterion for Pillar Stability AnalysisBy A Karrech, C Schrank, O Gaede, I Canbulat
Strain-based failure criteria have several advantages over stress-based failure criteria: they can account for elastic and inelastic strains; they utilise direct, observable effects instead of inferre
Nov 5, 2014
-
Quantifying the effect of climate and surface materials on post-mining landscape erosion – a risk approach using landscape evolution modelsBy D C. Verdon-Kidd, G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard
Designing post-mining landscapes requires quantifying the short and long-term risks. In recent years, computer based landscape evolution models (LEMs) have been used to provide insight into both erosi
Jul 25, 2018
-
Conversion of a Pelletising Induration Furnace from a Haematite to Magnetite FeedBy R Jones
OneSteel Whyalla’s grate-kiln-cooler pelletising plant was commissioned in 1968 processing haematite feed from the local South Middleback Ranges mining area. The existence of a magnetite resource bene
Jul 11, 2011
-
Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in AustraliaDuring 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component
Nov 25, 2010
-
Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto WayBy G Danckert
The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat
Jul 11, 2011
-
Justification of High Cost Open Pit Mining to Achieve Total Ore RecoveryBy Barrett D
The paper discusses the justification for the Open Pit Mining Operation at Central Norseman Gold Corporation Limited's North Royal facility.Open pit mining history is outlined together with produ
Jan 1, 1984
-
Structurally Controlled Epithermal Mineralization Associated with Carbonate and Manganese Oxides, Misima Island, Papua New GuineaThe Mt. Sisa Orebody on Misima Island, P.N.G., consists of gold-silver mineralization associated with massive carbonate and amor- phous iron-manganese oxides in fractures and breccia matrix. The or
Jan 1, 1987
-
CAES System at KCGM ù Four Years OnBy L O. ÆNeill, J Bebek
When Kalgoorlie Consolidated Gold Mines (KCGM) purchased its fleet of 18 CaterpillarÆs dump trucks in 1999, as part of its change to owner operated mining, five CaterpillarÆs Computer Aided Earthmovin
Jan 1, 2003
-
Sensitivity of a hydro-economic model in a mining region to changes in hydrological and economic inputsBy N McIntyre, J Smart, J Ossa-Moreno, D Rivera
Hydro-economics is a field of research that analyses water resources from a multi-disciplinary approach (Harou et al., 2009). These models generally include one component that describes the water reso
Jul 25, 2018
-
Discovery, Geology and Metal Zoning of the Nickel Rim Depth Deposit, Sudbury, CanadaThe Nickel Rim Depth Cu-Ni-PGE deposit, discovered by Falconbridge Limited in 1993, illustrates several trends in exploration in the Sudbury area. Recent discoveries tend to be deep, high grade, foo
Jan 1, 1996
-
Adoption of an Integrated Mine Water Management Approach Provides Environmental, Social and Economic BenefitsBy R Vleggaar
In addressing a short-term operational need for the relocation of a tailings storage facility reclaim pond, a mine has achieved a host of water management objectives. Through effective planning and ad
Jan 1, 2006
-
Modelling of a æTrue-Belt SamplerÆ - A New Device for Sampling from a Conveyor BeltBy R Steinhaus, D M. Frantois-Bongarton, P W. Cleary, G K. Robinson, M D. Sinnott
Multotec Process Equipment and Dominique Frantois-Bongarton have a patent for a mineral sampling device, which they call a æTrue-Belt SamplerÆ. This uses a plough, which is rotated about an axis paral
Aug 21, 2012
-
Estimation of High Grade Copper Slope Grades in QTS North, Cobar Mines, Cobar NSWBy Schofield N. A
The cross-sectional method of stope grade estimation at Cobar Mines has consistently had several shoneomings, me most imponant of which being mat stope grade is significantly overestimated in the high
Jan 1, 1993
-
Solid State Reduction of Australian Chromite with CoalBy Johnston R. F
The factors which influence the reduction of chromite are investigated with special reference to Coobina chromite. This was compared with a South African chromite ore. The reduction characteristics ar
Jan 1, 1994
-
Factors Affecting Gas Release From the Working SeamThe seam gas content at Westcliff Colliery is 12-15m3/tonne of coal.Composition ranges from 99% CH4 to 52% C02 in one area. Desorption rates are proportional to gas contents and CH4 is preferential
Jan 1, 1982