Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Mineralization of the Kangiara Mine, N.S.W

    The Kangiara mine is located within the Middle to Upper Silurian Hawkins Volcanics of the Douro Group near Yass, New South Wales. The deposit is a po1ymetallic type within a rhyolitic tuff.The ore min

    Jan 1, 1976

  • AUSIMM
    On-line Determination of Moisture in Coal and Coke

    By Sowerby BD

    The CSIRU Division of Mineral Engineering is developing various techniques for the on-line determination of moisture in coal and coke, and some instruments are now commercially available. These te

    Jan 1, 1987

  • AUSIMM
    Use of Polymeric Agglomeration Aids to Improve Heap Leach Recovery and Profitability

    By Gross A. E, Neville P. C

    Over the last decade heap leaching with a cement binder has allowed the economical leaching of low grade gold ores of less than 2 grams/tonne. Despite the continued use of cement as an agglomeration

    Jan 1, 1994

  • AUSIMM
    Sulphuric Acid Leaching of Manganese Nodules in the Presence of Charcoal

    By Jena, Anand S, Das R. P

    Leaching studies were carried out on Indian Ocean manganese nodules using sulphuric acid as the lixiviant. By leaching the nodules with 8 per cent sulphuric acid for 12h at 100°C, copper and nick

    Jan 1, 1989

  • AUSIMM
    Predicting Machine Cutting and Cutter Wear Rates for Mining Applications

    By Trueman R

    If continuous mining systems are to be successfully applied in metalliferous mines then reliable models will be needed to predict rock cutting machine advance and tool wear rates for effective machi

    Jan 1, 1995

  • AUSIMM
    Newly Developed Method and Equipment for Tunnel Excavation-Construction of Myojin Tunnel

    By Fukuichi K, Matsukawa H, Nakagawa M

    The Myojin Tunnel, located on the Shikoku Expressway being constructed by the Japan Highway Public Corporation, is 3,770 m long with a cross sectional area of 80 m2. Kajima Corporation, the contrac

    Jan 1, 1987

  • AUSIMM
    Blasting Improvements at KCGM

    Blasting is a common practice in mining whereby solid rock is fractured, using explosives, to a more manageable size. The effectiveness of blasting influences a number of downstream activities such as

    Jan 1, 2003

  • AUSIMM
    On-Line Ash Sensing in Coal Flotation Slurries

    A system for rapid on-line determination of weight percentage coal in slurry and weight percentage ash in coal has been developed at the Julius Kruttschnitt Mineral Research Centre, University of

    Jan 1, 1978

  • AUSIMM
    An Investigation into Spoil Stability at Moura

    By Dunbavan M, Mallett C. W

    The sequence of development and back analysis of the failure of a spoil pile in the 1B pit of the Moura Mine are given. The mode of failure was a two-wedge mechanism with a basal slip plane passin

    Jan 1, 1981

  • AUSIMM
    High-Si Rhyolites and Shoshonitic Volcanics

    The transgressive sedimentary sequence of the Notnnea Basin contains rhyolitic lavas and less voluminous mafic and intermediate volcanims of shoshonitic affinities which erupted simultaneously during

    Jan 1, 1995

  • AUSIMM
    The Recovery of Water from a Colloidally Stable Kimberlite Suspension

    By Hunt MS

    A major diamond mining operation in South Africa is faced with the unique problem of recovering usable water from the fine tailings stream. The kimberlite ore hoisted is washed prior to crushing in

    Jan 1, 1988

  • AUSIMM
    Leslie Bradford Golden Jubilee Oration

    LESLIE BRADFORD GOLDEN JUBILEE ORATION "Not only a metallurgist but a scientist of the highest order" Leslie Bradford and the Australian Metallurgical Industry

    Jan 1, 1987

  • AUSIMM
    The Effect of Sulphur on the Rate of Reduction of Zinc Oxide from Slag

    By Ranklin W. J

    The mechanism and rate-limiting step of carbonaceous reduction of zinc from slags was investigated in the laboratory. Disks of graphite were rotated in ZnO-containing slags at various speeds for fix

    Jan 1, 1993

  • AUSIMM
    The Discovery and Evaluation of the Windara Nickel Deposits, Western Australia

    By Wright R, Stock E. C

    The Windarra nickel deposits known to date comprise two sulphide orebodies located at Mount Windarra and South Windarra. These orebodies, which are 15 km apart, lie within an ultramafic complex at

    Jan 1, 1973

  • AUSIMM
    Gold, Calcite, and Other Materials on Activated Carbons from CIP Pplants

    By Woodcock J. T, Sparrow G. J

    Activated carbon particles obtained from a number of Australian CIP operations were examined with an optical and a scanning electron micro- scope and an electron microprobe. External surfaces, and po

    Jan 1, 1988

  • AUSIMM
    Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional Simulation

    By J Bower

    The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t

    Jan 1, 2009

  • AUSIMM
    Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited

    By Slater R

    The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The

    Jan 1, 1982

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016

  • AUSIMM
    Use of an In-The-Wall Ramp for Open Pit Mining at Three Mile Hill

    This paper details successful implementation of a revolutionary pit access system involving excavation of an 'in-the-wall' ramp at Three Mile Hill open pit operated by Gold Mines of Coolga

    Jan 1, 1996

  • AUSIMM
    The Broken Hill Proprietary Company Limited. (Iron and Steel Works.) The Basic Open Hearth Process

    By Walker E. R

    IN the early age of steel it was made hy what is known as the cementation proeess, in which wrought iron was embedded in charcoal and heated in a mufflc furnace to a tcmperature of approximately 1100&

    Jan 1, 1930