Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Hydrothermal Mineral Deposits and their Association with Granitoids in the Cullen Mineral Field, Northern TerritoryBy Needham RS
Hydrothermal mineral deposits are the dominant mineral deposit type in the Cullen Mineral Field, and have been important sources of tin, tungsten gold, silver-lead, zinc and copper. The deposits a
Jan 1, 1984
-
Open Stoping with Associated Caving at Mount LyellUnderground mining of the ore below the West Lyell open cut commenced in 1972 with the 10 Series stopes above rail haulage level. The third lift of stoping (30 Series) com- menced this year, and acce
Jan 1, 1982
-
Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine ClosureBy S Jahn, M Noel, E M. Rykaart, M Pau
Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m
Jan 1, 2003
-
Gold Mineralisation at the North End of the Kalgoorlie Field, Mount Percy - Kalgoorlie, Western AustraliaBy Bonsall EM, Schwabe MR, Hamlyn DA
Historically, most of the gold produced from Kalgoorlie has been derived from the gold and gold telluride Golden Mile lode systems dominantly hosted within the Golden Mile Doler-ite and to a lesser ex
Jan 1, 1984
-
An assessment of the rate of construction of an upstream raised tailings damBy J J. Moreno, J Willis, P Garvey
Many of the tailings storage facilities (TSFs) in Australia are upstream raised facilities for which the consolidation of the hydraulically deposited tailings is essential to the stability of the TSF.
Jul 1, 2021
-
Evolution of a Structural Framework for High-grade Iron Ore DepositsBy A R. Cruden, M S. Egglseder
The formation of banded iron formation (BIF)-hosted high-grade iron ore deposits in the Hamersley Province, Australia has been debated for decades. Although a structural control on their formation is
Jul 13, 2015
-
Effects of FeO/SiO2 ratio and optical basicity on viscosity and melt structure of FeO–SiO2–Al2O3–CaO–MgO–Cr2O3 meltsBy C Samuelsson, Q Shu, A Lennartsson, F Gyakwaa, A Andersson, J Isaksson
The physico-chemical property, viscosity, is essential for pyrometallurgical processes and influences the settling rate of valuable metal droplets in slag, affecting the metal recovery. The copper sla
Jun 19, 2024
-
Improving Consistency of Delivery at Mt Rawdon OperationBy M Boon, M Franklin
This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2
Jun 22, 2016
-
Big Bell Coming Back for Seconds, Thirds and FourthsIn October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t
Jan 1, 1998
-
The role of steelmaking desulfurisation and EAF-smelter in hydrogenbased steelmaking route of low-grade iron oresBy Q Fan
The steelmaking desulfurisation plays an important role in coal-based steelmaking route of blast furnace and BOF converter within the flow sheet of BF-deS-BOF. With the advent of H2-based ironmaking a
Sep 18, 2023
-
Stope Filling with Thickened Classified Flotation Tailings (8ea60644-b41a-4846-93fc-367236e8ddfb)Stope filling practice on the Great Boulder Mine was described in -a paper published in Aus.I.M.M., Proceedings No. 137, in 1945. When the paper was presented the process had emerged from the experime
Jan 1, 1948
-
Stochastic Optimisation of Mineral Value Chains – Developments and Applications for the Global Optimisation of Mining Complexes with UncertaintyBy R Dimitrakopoulos, R Goodfellow
One of the primary objectives when optimising a mining complex is to maximise its value for the primary stakeholders. In order to achieve this objective, it is necessary to holistically optimise all a
Nov 24, 2014
-
Utilising mine planning to deliver closure landforms through productive movementBy M Bettison, R Wright, N Taylor
The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat
Jul 25, 2018
-
The Occurrence of Phosphorus and Other Impurities in Australian Iron OresBy C M. MacRae
The characterisation of high-P iron ores by field emission gun electron probe microanalyser (FEGEPMA) was carried out to determine elemental associations in iron oxides sensus lato and, using this kno
Jul 11, 2011
-
Development of the Hawsons Low-Grade MagnetiteBy R L. Koenig
The rediscovery and recognition of the magnetite potential of the iron mineralisation at the Hawsons Project area 60 km south of Broken Hill has the potential for the development of a new series of ma
Jul 11, 2011
-
Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit DesignsBy Mogi G, Akaike A, Yamaguchi U
A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met
Jan 1, 1995
-
Studies on Chlorination of Rutile and StruveriteBy Azizan A
The paper presents the results of chlorination of beneficiated rutile and struverite (a tantalum-niobium bearing, rutile type mineral in alluvial tin deposits) by carbon tetrachloride in the range 6
Jan 1, 1996
-
Geotechnical Challenges and Requirements for the Subsurface Development: The Case History of the Brasilia MetroSubsurface development requires some geotechnical conditions and challenges. Most of then are related to the compatibility between tunnelling system and surrounded ground conditions, and design criter
Jan 1, 1999
-
Hydraulic Fracturing for Rapid Low Cost Stress Measurement in Underground MinesBy Crawford G. R, Wold M. B
The application of the hydraulic fracturing technique to the measurement of in situ rock stress from underground excavation is discussed; including relevant theoretical considerations, equipmenl detai
Jan 1, 1990
-
Underground Mining Methods at Mount Morgan, Queensland (4c024877-4266-4ad5-a39e-01b065af258e)By Sewell L. G, White H. S
OWING to two large falls of ground which resulted in serious accidents occurring towards the end of 1908, it became evident that the "open chamber" system then in use was unsuitable for the
Jan 1, 1911